QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 2711 26th St Ne, Washington, Dc 20018 The proposed work consist on drilling four soil borings and covert one soil boring to monitoring well for environmental soil and groundwater sampling and testing. A truck-mounted or track-mounted percussion and hydraulic drive system will be used to collect soil samples for field monitoring and/or analysis from accessible exterior and interior sections of the subject structure. Drilling methods two pounds of powdered bentonite for each gallon of water. The diameter will be with a max of three inches with a depth of twenty-feet. All work will be conducted under ddoe regulation, as per site plan, work plan report, dc well construction/schematic forms. Date: September 30, 2014 Contractor: United Venture Consortiumhaimanot Rps IncClient: United Venture Consortium-Haimanot Bizuayehu | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400459 |