Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Date: March 31, 2006 Contractor: The Electric Connection Client: Randall Chin,Kandice Chin | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: April 14, 2006 | Current use: Single family d | |||||
SCORE 100 Date: December 15, 2005 Contractor: The Electric Connection Client: Broadway 2450.0 | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: January 29, 2006 | Current use: Office - profes | |||||
SCORE 100 Date: September 7, 2005 Contractor: The Electric Connection Client: Richard Mclean | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 100 Date: October 25, 2004 Contractor: The Electric Connection Client: Robert Schmutz | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Current use: Single family d | |||||
SCORE 100 Date: July 22, 2004 Contractor: The Electric Connection Client: Llc Sallash | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: April 22, 2005 | Current use: Single family d | |||||
SCORE 100 Date: January 21, 2004 Contractor: The Electric Connection Client: Barbara Smith | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: March 23, 2004 | Current use: Single family d | |||||
SCORE 100 Date: July 1, 2003 Contractor: The Electric Connection Client: Duane Hill,Dawn Hill | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: July 11, 2003 | Current use: Single family d | |||||
SCORE 100 Client: Robert Harland,Christine Harland | Applicant: The Electric Connection | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 19, 2003 | Current use: Single family d | |||||
SCORE 100 39 Greenbriar Bl Boulder Co Hvac duct work and electrical rewiring. Substandard duct work and wiring found during residing. Owner contractor on hvac. Date: May 9, 2003 Contractor: The Electric Connection Client: Wayne Stacy | Applicant: The Electric Connection | Permit type: Electrical, mechanic | Permit status: Cmp | Completion date: June 16, 2003 | Current use: Single family d | |||||
SCORE 100 Date: February 13, 2003 Contractor: The Electric Connection Client: Jane Marmande | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: February 25, 2003 | Current use: Single family d | |||||
SCORE 100 Date: September 13, 2006 Contractor: The Electric Connection Client: Paula Hrynik | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: December 22, 2008 | Current use: Single family d | |||||
SCORE 100 Date: November 1, 2006 Contractor: The Electric Connection Client: K Fox | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: July 31, 2008 | Current use: Single family d | |||||
SCORE 100 Date: November 20, 2006 Contractor: The Electric Connection Client: Betty Rodgers | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: April 4, 2007 | Current use: Single family d | |||||
SCORE 100 Date: March 7, 2007 Contractor: The Electric Connection Client: Mary Disalvo | Applicant: The Electric Connection | Permit type: Electrical | Permit status: N&v | Current use: Single family d | |||||
SCORE 100 Date: May 25, 2007 Contractor: The Electric Connection Client: Lincoln 930.0 | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: June 12, 2007 | Current use: Single family d | |||||
SCORE 100 Date: August 30, 2007 Contractor: The Electric Connection Client: Leslie Hoye | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: December 22, 2008 | Current use: Single family d | |||||
SCORE 100 Date: September 11, 2007 Contractor: The Electric Connection Client: Ariel Solomon,Vic Solomon | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: December 28, 2007 | Current use: Single family d | |||||
SCORE 100 Date: December 19, 2007 Contractor: The Electric Connection Client: R Goodacre | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: August 18, 2008 | Current use: Single family d | |||||
SCORE 100 Date: October 28, 2008 Contractor: The Electric Connection Client: Exempt Childs | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: December 1, 2008 | Current use: Single family d | |||||
SCORE 100 Date: November 3, 2008 Contractor: The Electric Connection Client: Phillip Chang | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: November 10, 2008 | Current use: Single family d | |||||
SCORE 100 Date: December 1, 2008 Contractor: The Electric Connection Client: Warren Hall,Rosa Hall | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: December 10, 2008 | Current use: Single family d | |||||
SCORE 100 9 Lincoln Pl Boulder Co Electrical permit - for underground electric run for future hot-tub and outlets in backyard. Date: August 28, 2009 Contractor: The Electric Connection Client: Megan Casselman-Condon,Richard Casselman-Condon | Applicant: The Electric Connection | Permit type: Electrical | Permit status: N&v | Current use: Single family d | |||||
SCORE 100 Date: July 9, 2010 Contractor: The Electric Connection Client: Roy Pyle,Donna Pyle | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: July 15, 2010 | Current use: Single family d | |||||
SCORE 100 Date: August 1, 2011 Contractor: The Electric Connection Client: Don Johnson,Charlotte Johnson | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: August 16, 2011 | Current use: Single family d | |||||
SCORE 100 Date: June 26, 2012 Contractor: The Electric Connection Client: Of Board | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: October 9, 2014 | Current use: Townhomes, exis | |||||
SCORE 100 Date: August 31, 2012 Contractor: The Electric Connection Client: G De Boer | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Single family d | |||||
SCORE 100 1395 Bear Mountain Dr 98 Boulder Co Electrical permit to correct panel rating for existing 2 amp main. Date: April 11, 2013 Contractor: The Electric Connection Client: Alan Brockett,Christine Brockett | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: July 9, 2014 | Current use: Multifamily dwe | |||||
SCORE 100 18 Folsom St 602 Boulder Co Plumbing permit associated with removal of shower and shower pan, and replacement with new tub and shower combo. Electrical permit associated with under cabinet lighting in kitchen and two new can lights in bath. Date: April 29, 2013 Contractor: The Electric Connection Client: Home Armstrong | Applicant: The Electric Connection | Permit type: Electrical, plumbing | Permit status: Cmp | Completion date: July 17, 2013 | Current use: Multifamily dwe | |||||
SCORE 100 29 Dover Dr Boulder Co Replace old existing electrical service only (1 amp). Scope of work does not include panel. If any underground electric work is required a underground electric inspection will be required. Date: June 4, 2013 Contractor: The Electric Connection Client: Thomas Tunner | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: July 10, 2014 | Current use: Single family d | |||||
SCORE 100 Date: June 18, 2013 Contractor: The Electric Connection Client: Linda Behm | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: June 27, 2013 | Current use: Single family d | |||||
SCORE 100 Date: July 31, 2013 Contractor: The Electric Connection Client: Boer De, De | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: August 6, 2013 | Current use: Single family d | |||||
SCORE 100 Date: October 23, 2013 Contractor: The Electric Connection Client: Linda Behm | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Single family d | |||||
SCORE 100 Date: February 24, 2014 Contractor: The Electric Connection Client: Marie Kindgren | Applicant: The Electric Connection | Permit type: Electrical | Permit status: Cmp | Completion date: July 9, 2014 | Current use: Single family d | |||||
SCORE 100 19 Brea Canyon Cut Off Rd Walnut Ca 91789 Installation of temporary generator for event april 8-10th 2011. Date: April 1, 2011 Contractor: The Electric Connection Applicant: Kaiser Alexis | Permit status: Permisud | Permit id: 1104010006 | |||||
SCORE 100 Date: January 11, 2012 Contractor: The Electric Connection Applicant: Kaiser Alex | Permit status: Permisud | Permit id: 1201110041 | |||||
SCORE 100 Date: August 23, 2013 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: August 27, 2013 | Permit id: 1308230005 | |||||
SCORE 100 Date: July 28, 2004 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: July 30, 2004 | Permit id: 0407280050 | |||||
SCORE 100 Date: August 8, 2012 Contractor: The Electric Connection Applicant: Steven Schnierer | Permit status: Finaled | Completion date: August 23, 2012 | Permit id: 1208080016 | |||||
SCORE 100 Date: August 21, 2014 Contractor: The Electric Connection Applicant: Carlos Zamora | Permit status: Finaled | Completion date: September 8, 2014 | Permit id: 1408210042 | |||||
SCORE 100 Date: February 7, 2000 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Permisud | Permit id: 0002070036 | |||||
SCORE 100 Date: July 14, 2000 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: October 25, 2000 | Permit id: 0007140078 | |||||
SCORE 100 Date: August 28, 2001 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: August 30, 2001 | Permit id: 0108280016 | |||||
SCORE 100 Date: October 11, 2001 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: December 11, 2001 | Permit id: 0110110014 | |||||
SCORE 100 Date: June 24, 2002 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: June 27, 2002 | Permit id: 0206240028 | |||||
SCORE 100 Date: July 2, 2002 Contractor: The Electric Connection Applicant: Hopkins Kim | Permit status: Finaled | Completion date: July 3, 2002 | Permit id: 0207020009 | |||||
SCORE 100 Date: July 17, 2002 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: October 3, 2002 | Permit id: 0207170020 | |||||
SCORE 100 Date: August 13, 2002 Contractor: The Electric Connection Applicant: Hopkins Kim | Permit status: Finaled | Completion date: August 15, 2002 | Permit id: 0208130036 | |||||
SCORE 100 Date: December 4, 2002 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: December 10, 2002 | Permit id: 0212040007 | |||||
SCORE 100 Date: June 23, 2003 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Permisud | Permit id: 0306230031 | |||||
SCORE 100 Date: November 17, 2004 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: December 23, 2004 | Permit id: 0411170045 | |||||
SCORE 100 Date: February 3, 2005 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: April 14, 2005 | Permit id: 0502030033 | |||||
SCORE 100 437 Carmelo Av Pasadena Ca 91107 Upgrade service to 2 amps,partial rewire (not including kitchen) and amp subpanel in basement Date: April 28, 2005 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: May 9, 2005 | Permit id: 0504280052 | |||||
SCORE 100 26 Upper Te Los Angeles Ca Upgrade electric service to 2 amp and replace outlets and light fixtures in kitchen Date: September 23, 2005 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: January 30, 2006 | Permit id: 0509230036 | |||||
SCORE 100 Date: May 19, 2006 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: May 23, 2006 | Permit id: 0605190034 | |||||
SCORE 100 Date: May 19, 2006 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: May 30, 2006 | Permit id: 0605190035 | |||||
SCORE 100 Date: July 21, 2006 Contractor: The Electric Connection Applicant: Hopkins Zachary | Permit status: Finaled | Completion date: August 1, 2006 | Permit id: 0607210036 | |||||
SCORE 100 Date: August 1, 2006 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: August 17, 2006 | Permit id: 0608010040 | |||||
SCORE 100 Date: September 20, 2006 Contractor: The Electric Connection Applicant: Burroughs Elana | Permit status: Finaled | Completion date: September 26, 2006 | Permit id: 0609200030 | |||||
SCORE 100 Date: January 16, 2007 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: January 23, 2007 | Permit id: 0701160010 | |||||
SCORE 100 Date: April 18, 2007 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: April 19, 2007 | Permit id: 0704180034 | |||||
SCORE 100 Date: April 26, 2007 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: May 1, 2007 | Permit id: 0704260017 | |||||
SCORE 100 Date: October 22, 2007 Contractor: The Electric Connection Applicant: Burroughs Eleana | Permit status: Finaled | Completion date: October 24, 2007 | Permit id: 0710220050 | |||||
SCORE 100 Date: October 31, 2007 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: November 5, 2007 | Permit id: 0710310002 | |||||
SCORE 100 Date: August 5, 2008 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Permisud | Permit id: 0808050025 | |||||
SCORE 100 Date: August 13, 2008 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: April 17, 2009 | Permit id: 0808130025 | |||||
SCORE 100 Date: September 2, 2009 Contractor: The Electric Connection Applicant: Zamora Carlos | Permit status: Finaled | Completion date: September 3, 2009 | Permit id: 0909020005 | |||||
SCORE 100 Date: April 1, 2010 Contractor: The Electric Connection Applicant: Zamora,Carlos | Permit status: Finaled | Completion date: April 9, 2010 | Permit id: 1004010011 | |||||
SCORE 100 Date: May 10, 2010 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: May 19, 2010 | Permit id: 1005100023 | |||||
SCORE 100 Date: June 28, 2010 Contractor: The Electric Connection Applicant: Zamora Carlos | Permit status: Finaled | Completion date: February 19, 2013 | Permit id: 1006280026 | |||||
SCORE 100 Date: July 7, 2010 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: October 12, 2010 | Permit id: 1007070033 | |||||
SCORE 100 Date: July 23, 2010 Contractor: The Electric Connection Applicant: Verduzco Violet | Permit status: Finaled | Completion date: July 29, 2010 | Permit id: 1007230002 | |||||
SCORE 100 Date: November 30, 2010 Contractor: The Electric Connection Applicant: Zamora Carlos | Permit status: Finaled | Completion date: December 13, 2010 | Permit id: 1011300003 | |||||
SCORE 100 Date: November 30, 2010 Contractor: The Electric Connection Applicant: Zamora Carlos | Permit status: Finaled | Completion date: December 13, 2010 | Permit id: 1011300004 | |||||
SCORE 100 Date: January 25, 2011 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: February 7, 2011 | Permit id: 1101250007 | |||||
SCORE 100 Date: April 11, 2011 Contractor: The Electric Connection Applicant: Jacoby Eric | Permit status: Finaled | Completion date: April 13, 2011 | Permit id: 1104110010 | |||||
SCORE 100 Date: June 28, 2011 Contractor: The Electric Connection Applicant: Jacoby Eric | Permit status: Finaled | Completion date: July 15, 2011 | Permit id: 1106280003 | |||||
SCORE 100 Date: September 1, 2011 Contractor: The Electric Connection Applicant: Jacoby Eric | Permit status: Finaled | Completion date: October 3, 2011 | Permit id: 1109010025 | |||||
SCORE 100 Date: September 20, 2011 Contractor: The Electric Connection Applicant: Schnierer Steven | Permit status: Finaled | Completion date: October 25, 2011 | Permit id: 1109200051 | |||||
SCORE 100 Date: September 20, 2011 Contractor: The Electric Connection Applicant: Schnierer Steven | Permit status: Finaled | Completion date: October 3, 2011 | Permit id: 1109200052 | |||||
SCORE 100 Date: March 22, 2012 Contractor: The Electric Connection Applicant: Schnierer Steven | Permit status: Finaled | Completion date: July 13, 2012 | Permit id: 1203220038 | |||||
SCORE 100 Date: April 30, 2012 Contractor: The Electric Connection Applicant: Schnierer Steven | Permit status: Finaled | Completion date: May 21, 2012 | Permit id: 1204300032 | |||||
SCORE 100 Date: June 7, 2012 Contractor: The Electric Connection Applicant: Schnierer Steven | Permit status: Finaled | Completion date: July 21, 2012 | Permit id: 1206070048 | |||||
SCORE 100 Date: July 9, 2012 Contractor: The Electric Connection Applicant: Schnierer Steven | Permit status: Finaled | Completion date: July 24, 2012 | Permit id: 1207090061 | |||||
SCORE 100 Date: February 5, 2013 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: February 8, 2013 | Permit id: 1302050036 | |||||
SCORE 100 Date: August 23, 2013 Contractor: The Electric Connection Applicant: Allen Jacoby | Permit status: Finaled | Completion date: August 28, 2013 | Permit id: 1308200002 | |||||
SCORE 100 Date: September 17, 2013 Contractor: The Electric Connection Applicant: Allen Jacoby | Permit status: Finaled | Completion date: September 23, 2013 | Permit id: 1309170007 | |||||
SCORE 100 Date: September 26, 2013 Contractor: The Electric Connection Applicant: Allen Jacoby | Permit status: Finaled | Completion date: September 27, 2013 | Permit id: 1309260030 | |||||
SCORE 100 325 Grand Oaks Av Pasadena Ca 91107 Partial rewire of house and upgrade main service panel to 2 amps. Date: February 24, 2014 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: March 3, 2014 | Permit id: 1402240028 | |||||
SCORE 100 Date: May 13, 2014 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: May 27, 2014 | Permit id: 1405130017 | |||||
SCORE 100 Date: May 29, 2014 Contractor: The Electric Connection Applicant: Gorman Robert | Permit status: Finaled | Completion date: June 18, 2014 | Permit id: 1405290040 | |||||
SCORE 100 Date: September 4, 2014 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: October 28, 2014 | Permit id: 1409040084 | |||||
SCORE 100 Date: September 8, 2014 Contractor: The Electric Connection Applicant: Gorman Robert | Permit status: Finaled | Completion date: September 17, 2014 | Permit id: 1409080053 | |||||
SCORE 100 Date: May 21, 2003 Contractor: The Electric Connection Applicant: K And M Productions | Permit status: Finaled | Completion date: July 2, 2003 | Permit id: 0305210011 | |||||
SCORE 100 15 Knowles Av Los Angeles Ca Electrical for 1 motor hookup for wheelchair lift,12 lights and 1 branch circuit. Date: July 20, 2010 Contractor: The Electric Connection Applicant: Zamora Carlos | Permit status: Finaled | Completion date: July 29, 2010 | Permit id: 1007200031 | |||||
SCORE 100 Date: July 18, 2011 Contractor: The Electric Connection Applicant: Steve Scheinerer | Permit status: Finaled | Completion date: August 2, 2011 | Permit id: 1107180029 | |||||
SCORE 100 Date: March 22, 2012 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: July 20, 2012 | Permit id: 1203220026 | |||||
SCORE 100 1 Bleakwood Av Los Angeles Ca 2 amp upgrade and rewire sfd. 33 outlets-lighting-recept switch and 12 light fixtures Date: November 20, 2012 Contractor: The Electric Connection Applicant: Steven Schinierer | Permit status: Finaled | Completion date: November 30, 2012 | Permit id: 1211200059 | |||||
SCORE 100 Date: May 10, 2000 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Permisud | Permit id: 0005100036 | |||||
SCORE 100 Date: February 3, 2006 Contractor: The Electric Connection Applicant: Chad Buchanan | Permit status: Finaled | Completion date: February 8, 2006 | Permit id: 0602030054 | |||||
SCORE 100 Date: August 12, 2010 Contractor: The Electric Connection Applicant: Eric Jacoby | Permit status: Finaled | Completion date: August 25, 2010 | Permit id: 1008120030 | |||||
SCORE 100 Date: October 1, 2012 Contractor: The Electric Connection Applicant: Steven Schnierer | Permit status: Permisud | Permit id: 1210010051 | |||||
SCORE 100 Date: December 27, 2012 Contractor: The Electric Connection Applicant: Jacoby Eric | Permit status: Finaled | Completion date: January 22, 2013 | Permit id: 1212270016 | |||||
SCORE 100 Date: January 7, 2013 Contractor: The Electric Connection Applicant: Schnierer Steven | Permit status: Finaled | Completion date: January 8, 2013 | Permit id: 1301070047 | |||||
SCORE 100 Date: June 6, 2013 Contractor: The Electric Connection Applicant: Eric Jacoby | Permit status: Finaled | Completion date: June 18, 2013 | Permit id: 1306060039 | |||||
SCORE 100 Date: November 26, 2013 Contractor: The Electric Connection Applicant: Jacoby,Eric | Permit status: Finaled | Completion date: December 9, 2013 | Permit id: 1311260057 | |||||
SCORE 100 Date: February 13, 2014 Contractor: The Electric Connection Applicant: Jacoby | Permit status: Permisud | Permit id: 1402130013 | |||||
SCORE 100 Date: April 2, 2014 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Permisud | Permit id: 1404020044 | |||||
SCORE 100 Date: December 15, 2014 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: December 23, 2014 | Permit id: 1409170037 | |||||
SCORE 100 Date: June 30, 2004 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: July 8, 2004 | Permit id: 0406300056 | |||||
SCORE 100 Date: August 20, 2013 Contractor: The Electric Connection Applicant: Stratz Permits E. Jacoby | Permit status: Finaled | Completion date: September 4, 2013 | Permit id: 1308200030 | |||||
SCORE 100 Date: January 14, 2014 Contractor: The Electric Connection Applicant: Jacoby Eric | Permit status: Finaled | Completion date: January 24, 2014 | Permit id: 1401140050 | |||||
SCORE 100 Date: August 2, 2006 Contractor: The Electric Connection Applicant: The Electric Connection* | Permit status: Finaled | Completion date: August 25, 2006 | Permit id: 0608020049 | |||||
SCORE 100 Date: October 30, 2006 Contractor: The Electric Connection Applicant: The Electric Connection* | Permit status: Permisud | Permit id: 0610300043 | |||||
SCORE 100 Date: August 5, 2008 Contractor: The Electric Connection Applicant: The Electric* | Permit status: Finaled | Completion date: August 15, 2008 | Permit id: 0808050037 | |||||
SCORE 100 Date: January 15, 2014 Contractor: The Electric Connection Applicant: Jacoby | Permit status: Finaled | Completion date: January 23, 2014 | Permit id: 1401140001 | |||||
SCORE 100 Date: June 18, 2009 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: July 15, 2009 | Expiration date: December 15, 2009 | Permit id: 906180010 | |||||
SCORE 100 Date: August 20, 2013 Contractor: The Electric Connection Applicant: Stratz Permits E. Jacoby | Permit status: Finaled | Completion date: September 4, 2013 | Expiration date: August 20, 2014 | Permit id: 1308200030 | |||||
SCORE 100 Date: June 30, 2004 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: July 8, 2004 | Expiration date: December 27, 2004 | Permit id: 406300056 | |||||
SCORE 100 437 Carmelo Av Pasadena Ca Upgrade service to 2 amps, partial rewire (not including kitchen) and amp subpanel in basement Date: April 28, 2005 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: May 9, 2005 | Expiration date: October 25, 2005 | Permit id: 504280052 | |||||
SCORE 100 Date: February 3, 2005 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: April 14, 2005 | Expiration date: August 2, 2005 | Permit id: 502030033 | |||||
SCORE 100 Date: November 17, 2004 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: December 23, 2004 | Expiration date: May 16, 2005 | Permit id: 411170045 | |||||
SCORE 100 Date: June 23, 2003 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Permisud | Expiration date: December 20, 2003 | Permit id: 306230031 | |||||
SCORE 100 Date: August 13, 2002 Contractor: The Electric Connection Applicant: Hopkins Kim | Permit status: Finaled | Completion date: August 15, 2002 | Expiration date: February 9, 2003 | Permit id: 208130036 | |||||
SCORE 100 Date: July 2, 2002 Contractor: The Electric Connection Applicant: Hopkins Kim | Permit status: Finaled | Completion date: July 3, 2002 | Expiration date: December 29, 2002 | Permit id: 207020009 | |||||
SCORE 100 Date: July 14, 2000 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: October 25, 2000 | Expiration date: January 11, 2001 | Permit id: 7140078 | |||||
SCORE 100 Date: January 14, 2014 Contractor: The Electric Connection Applicant: Jacoby Eric | Permit status: Finaled | Completion date: January 24, 2014 | Expiration date: January 14, 2015 | Permit id: 1401140050 | |||||
SCORE 100 Date: August 23, 2013 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: August 27, 2013 | Expiration date: August 23, 2014 | Permit id: 1308230005 | |||||
SCORE 100 Date: September 21, 2015 Contractor: The Electric Connection Applicant: Miller Robert | Permit status: Finaled | Completion date: October 9, 2015 | Expiration date: September 20, 2016 | Permit id: 1509210013 | |||||
SCORE 100 Date: December 15, 2014 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: December 23, 2014 | Expiration date: December 15, 2015 | Permit id: 1409170037 | |||||
SCORE 100 Date: April 1, 2011 Contractor: The Electric Connection Applicant: Kaiser Alexis | Permit status: Permisud | Expiration date: March 31, 2012 | Permit id: 1104010006 | |||||
SCORE 100 Date: January 29, 2015 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Permisud | Expiration date: January 29, 2016 | Permit id: 1501290001 | |||||
SCORE 100 Date: May 10, 2000 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Permisud | Expiration date: November 6, 2000 | Permit id: 5100036 | |||||
SCORE 100 Date: August 28, 2001 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: August 30, 2001 | Expiration date: February 24, 2002 | Permit id: 108280016 | |||||
SCORE 100 Date: January 16, 2007 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: January 23, 2007 | Expiration date: July 15, 2007 | Permit id: 701160010 | |||||
SCORE 100 Date: August 1, 2006 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: August 17, 2006 | Expiration date: January 28, 2007 | Permit id: 608010040 | |||||
SCORE 100 Date: May 19, 2006 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: May 23, 2006 | Expiration date: November 15, 2006 | Permit id: 605190034 | |||||
SCORE 100 Date: May 19, 2006 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: May 30, 2006 | Expiration date: November 15, 2006 | Permit id: 605190035 | |||||
SCORE 100 Date: April 18, 2007 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: April 19, 2007 | Expiration date: October 15, 2007 | Permit id: 704180034 | |||||
SCORE 100 Date: April 26, 2007 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: May 1, 2007 | Expiration date: October 23, 2007 | Permit id: 704260017 | |||||
SCORE 100 Date: October 31, 2007 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: November 5, 2007 | Expiration date: April 28, 2008 | Permit id: 710310002 | |||||
SCORE 100 Date: August 5, 2008 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Permisud | Expiration date: February 1, 2009 | Permit id: 808050025 | |||||
SCORE 100 Date: August 13, 2008 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: April 17, 2009 | Expiration date: February 9, 2009 | Permit id: 808130025 | |||||
SCORE 100 Date: May 10, 2010 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: May 19, 2010 | Expiration date: May 10, 2011 | Permit id: 1005100023 | |||||
SCORE 100 Date: June 28, 2010 Contractor: The Electric Connection Applicant: Zamora Carlos | Permit status: Finaled | Completion date: February 19, 2013 | Expiration date: June 28, 2011 | Permit id: 1006280026 | |||||
SCORE 100 Date: July 7, 2010 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: October 12, 2010 | Expiration date: July 7, 2011 | Permit id: 1007070033 | |||||
SCORE 100 Date: July 23, 2010 Contractor: The Electric Connection Applicant: Verduzco Violet | Permit status: Finaled | Completion date: July 29, 2010 | Expiration date: July 23, 2011 | Permit id: 1007230002 | |||||
SCORE 100 Date: November 30, 2010 Contractor: The Electric Connection Applicant: Zamora Carlos | Permit status: Finaled | Completion date: December 13, 2010 | Expiration date: November 30, 2011 | Permit id: 1011300003 | |||||
SCORE 100 Date: November 30, 2010 Contractor: The Electric Connection Applicant: Zamora Carlos | Permit status: Finaled | Completion date: December 13, 2010 | Expiration date: November 30, 2011 | Permit id: 1011300004 | |||||
SCORE 100 Date: January 25, 2011 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: February 7, 2011 | Expiration date: January 25, 2012 | Permit id: 1101250007 | |||||
SCORE 100 Date: April 11, 2011 Contractor: The Electric Connection Applicant: Jacoby Eric | Permit status: Finaled | Completion date: April 13, 2011 | Expiration date: April 10, 2012 | Permit id: 1104110010 | |||||
SCORE 100 Date: June 28, 2011 Contractor: The Electric Connection Applicant: Jacoby Eric | Permit status: Finaled | Completion date: July 15, 2011 | Expiration date: June 27, 2012 | Permit id: 1106280003 | |||||
SCORE 100 Date: September 1, 2011 Contractor: The Electric Connection Applicant: Jacoby Eric | Permit status: Finaled | Completion date: October 3, 2011 | Expiration date: August 31, 2012 | Permit id: 1109010025 | |||||
SCORE 100 Date: September 20, 2011 Contractor: The Electric Connection Applicant: Schnierer Steven | Permit status: Finaled | Completion date: October 25, 2011 | Expiration date: September 19, 2012 | Permit id: 1109200051 | |||||
SCORE 100 Date: September 20, 2011 Contractor: The Electric Connection Applicant: Schnierer Steven | Permit status: Finaled | Completion date: October 3, 2011 | Expiration date: September 19, 2012 | Permit id: 1109200052 | |||||
SCORE 100 Date: March 22, 2012 Contractor: The Electric Connection Applicant: Schnierer Steven | Permit status: Finaled | Completion date: July 13, 2012 | Expiration date: March 22, 2013 | Permit id: 1203220038 | |||||
SCORE 100 Date: July 9, 2012 Contractor: The Electric Connection Applicant: Schnierer Steven | Permit status: Finaled | Completion date: July 24, 2012 | Expiration date: July 9, 2013 | Permit id: 1207090061 | |||||
SCORE 100 3017 Markridge Rd Los Angeles Ca Upgrade main service panel to 2 amps, 14 lights, 13 switches, 11 circuit brakers and 26 recepticales. Date: August 13, 2012 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: August 17, 2012 | Expiration date: August 13, 2013 | Permit id: 1208130036 | |||||
SCORE 100 Date: February 5, 2013 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: February 8, 2013 | Expiration date: February 5, 2014 | Permit id: 1302050036 | |||||
SCORE 100 Date: August 23, 2013 Contractor: The Electric Connection Applicant: Allen Jacoby | Permit status: Finaled | Completion date: August 28, 2013 | Expiration date: August 23, 2014 | Permit id: 1308200002 | |||||
SCORE 100 Date: February 24, 2014 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: March 3, 2014 | Expiration date: February 24, 2015 | Permit id: 1402240028 | |||||
SCORE 100 Date: May 29, 2014 Contractor: The Electric Connection Applicant: Gorman Robert | Permit status: Finaled | Completion date: June 18, 2014 | Expiration date: May 29, 2015 | Permit id: 1405290040 | |||||
SCORE 100 Date: September 4, 2014 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: October 28, 2014 | Expiration date: September 4, 2015 | Permit id: 1409040084 | |||||
SCORE 100 Date: September 8, 2014 Contractor: The Electric Connection Applicant: Gorman Robert | Permit status: Finaled | Completion date: September 17, 2014 | Expiration date: September 8, 2015 | Permit id: 1409080053 | |||||
SCORE 100 Date: September 17, 2015 Contractor: The Electric Connection Applicant: Gorman Robert | Permit status: Permisud | Expiration date: September 16, 2016 | Permit id: 1509170026 | |||||
SCORE 100 719 New York Dr Altadena Ca Upgrade electric service to 2 amp and partial rewire of existing outlets and fixtures Date: December 7, 2015 Contractor: The Electric Connection Applicant: Gorman Robert | Permit status: Finaled | Completion date: December 29, 2015 | Expiration date: December 6, 2016 | Permit id: 1512070012 | |||||
SCORE 100 Date: May 21, 2003 Contractor: The Electric Connection Applicant: K And M Productions | Permit status: Finaled | Completion date: July 2, 2003 | Expiration date: November 17, 2003 | Permit id: 305210011 | |||||
SCORE 100 Date: August 13, 2015 Contractor: The Electric Connection Applicant: Miller, Robert | Permit status: Permisud | Expiration date: August 12, 2016 | Permit id: 1508130067 | |||||
SCORE 100 Date: January 15, 2014 Contractor: The Electric Connection Applicant: Jacoby | Permit status: Finaled | Completion date: January 23, 2014 | Expiration date: January 15, 2015 | Permit id: 1401140001 | |||||
SCORE 100 Date: August 8, 2012 Contractor: The Electric Connection Applicant: Steven Schnierer | Permit status: Finaled | Completion date: August 23, 2012 | Expiration date: August 8, 2013 | Permit id: 1208080016 | |||||
SCORE 100 Date: August 21, 2014 Contractor: The Electric Connection Applicant: Carlos Zamora | Permit status: Finaled | Completion date: September 8, 2014 | Expiration date: August 21, 2015 | Permit id: 1408210042 | |||||
SCORE 100 Date: July 24, 2014 Contractor: The Electric Connection Applicant: Jacoby Eric | Permit status: Finaled | Completion date: August 4, 2014 | Expiration date: July 24, 2015 | Permit id: 1407240047 | |||||
SCORE 100 Date: April 14, 2015 Contractor: The Electric Connection Applicant: Jacoby Eric | Permit status: Finaled | Completion date: April 20, 2015 | Expiration date: April 13, 2016 | Permit id: 1504140040 | |||||
SCORE 100 Date: July 28, 2004 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: July 30, 2004 | Expiration date: January 24, 2005 | Permit id: 407280050 | |||||
SCORE 100 Date: August 3, 2006 Contractor: The Electric Connection Applicant: Hopkins Zac | Permit status: Permisud | Expiration date: January 30, 2007 | Permit id: 608030061 | |||||
SCORE 100 Date: February 28, 2013 Contractor: The Electric Connection Applicant: Allen Jacoby | Permit status: Finaled | Completion date: April 25, 2013 | Expiration date: February 28, 2014 | Permit id: 1302280003 | |||||
SCORE 100 Date: April 18, 2007 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: April 19, 2007 | Expiration date: October 15, 2007 | Permit id: 704180034 | |||||
SCORE 100 Date: April 26, 2007 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: May 1, 2007 | Expiration date: October 23, 2007 | Permit id: 704260017 | |||||
SCORE 100 Date: August 23, 2013 Contractor: The Electric Connection Applicant: Allen Jacoby | Permit status: Finaled | Completion date: August 28, 2013 | Expiration date: August 23, 2014 | Permit id: 1308200002 | |||||
SCORE 100 Date: December 15, 2014 Contractor: The Electric Connection Applicant: Jacoby Allen | Permit status: Finaled | Completion date: December 23, 2014 | Expiration date: December 15, 2015 | Permit id: 1409170037 | |||||
SCORE 100 Client: Gary Berg | Permit type: Electrical | Permit status: Cmp | Completion date: June 20, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-02761 | |||||
SCORE 100 Client: William Waite | Permit type: Electrical | Permit status: Iss | Current use: Multifamily dwellings, existing | Permit id: Pmt2016-05784 | |||||
SCORE 100 9 Lincoln Pl Boulder Co Electrical permit - for underground electric run for future hot-tub and outlets in backyard. Client: Megan Casselman-Condon | Permit type: Electrical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-03411 | |||||
SCORE 100 1395 Bear Mountain Dr 98 Boulder Co Electrical permit to correct panel rating for existing 2 amp main. Client: Alan Brockett | Permit type: Electrical | Permit status: Cmp | Completion date: July 9, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2013-01521 | |||||
SCORE 100 18 Folsom St 602 Boulder Co Plumbing permit associated with removal of shower and shower pan, and replacement with new tub and shower combo. Electrical permit associated with under cabinet lighting in kitchen and two new can lights in bath. Client: Home Armstrong | Permit type: Electrical, plumbing | Permit status: Cmp | Completion date: July 17, 2013 | Current use: Multifamily dwellings, remodel | Permit id: Pmt2013-01787 | |||||
SCORE 100 29 Dover Dr Boulder Co Replace old existing electrical service only (1 amp). Scope of work does not include panel. If any underground electric work is required a underground electric inspection will be required. Client: Thomas Tunner | Permit type: Electrical | Permit status: Cmp | Completion date: July 10, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-02542 | |||||
SCORE 100 Client: Linda Behm | Permit type: Electrical | Permit status: Cmp | Completion date: June 27, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-02819 | |||||
SCORE 100 Client: Boer De | Permit type: Electrical | Permit status: Cmp | Completion date: August 6, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-03681 | |||||
SCORE 100 Client: Linda Behm | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-05861 | |||||
SCORE 100 Client: Robert Harland | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 19, 2003 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2001-00055 | |||||
SCORE 100 Client: Of Board | Permit type: Electrical | Permit status: Cmp | Completion date: October 9, 2014 | Current use: Townhomes, existing | Permit id: Pmt2012-03105 | |||||
SCORE 100 Client: G De Boer | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-04282 | |||||
SCORE 100 Client: Broadway | Permit type: Electrical | Permit status: Cmp | Completion date: January 29, 2006 | Current use: Office - professional, existing | Permit id: Pmt2005-04804 | |||||
SCORE 100 Client: Barbara Smith | Permit type: Electrical | Permit status: Cmp | Completion date: March 23, 2004 | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-00244 | |||||
SCORE 100 Client: Roy Pyle | Permit type: Electrical | Permit status: Cmp | Completion date: July 15, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-02822 | |||||
SCORE 100 39 Greenbriar Bl Boulder Co Hvac duct work and electrical rewiring. Substandard duct work and wiring found during residing. Owner contractor on hvac. Client: Wayne Stacy | Permit type: Electrical, mechanical | Permit status: Cmp | Completion date: June 16, 2003 | Current use: Single family detached dwelling, existin | Permit id: Pmt2003-01754 | |||||
SCORE 100 Client: Exempt Childs | Permit type: Electrical | Permit status: Cmp | Completion date: December 1, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04756 | |||||
SCORE 100 Client: Lincoln | Permit type: Electrical | Permit status: Cmp | Completion date: June 12, 2007 | Current use: Single family detached dwelling | Permit id: Pmt2007-02086 | |||||
SCORE 100 Client: Don Johnson | Permit type: Electrical | Permit status: Cmp | Completion date: August 16, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-03279 | |||||
SCORE 100 Client: K Fox | Permit type: Electrical | Permit status: Cmp | Completion date: July 31, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-04719 | |||||
SCORE 100 Date: February 15, 2017 Contractor: The Electric Connection Client: Martha Maxwell | Permit type: Electrical | Permit status: Cmp | Completion date: March 6, 2017 | Current use: Townhomes, existing | Permit id: Pmt2017-00527 | |||||
SCORE 100 Client: Irene Farone | Permit type: Building, electrical, mechanical, plumbing | Permit status: N&v | Current use: Single family detached dwelling, remodel | Permit id: Pmt2002-02273 | |||||
SCORE 100 Client: Jane Marmande | Permit type: Electrical | Permit status: Cmp | Completion date: February 25, 2003 | Current use: Single family detached dwelling, existin | Permit id: Pmt2003-00539 | |||||
SCORE 100 Client: Benjamin Beall | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: August 8, 2003 | Current use: Single family detached dwelling, remodel | Permit id: Pmt2003-01713 | |||||
SCORE 100 Client: Duane Hill | Permit type: Electrical | Permit status: Cmp | Completion date: July 11, 2003 | Current use: Single family detached dwelling, existin | Permit id: Pmt2003-02592 | |||||
SCORE 100 Client: Llc Sallash | Permit type: Electrical | Permit status: Cmp | Completion date: April 22, 2005 | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-02879 | |||||
SCORE 100 Client: Robert Schmutz | Permit type: Electrical | Permit status: Cmp | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-04142 | |||||
SCORE 100 Client: Richard Mclean | Permit type: Electrical | Permit status: Cmp | Current use: Single family detached dwelling, existin | Permit id: Pmt2005-03481 | |||||
SCORE 100 Client: Randall Chin | Permit type: Electrical | Permit status: Cmp | Completion date: April 14, 2006 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-01125 | |||||
SCORE 100 Client: Paula Hrynik | Permit type: Electrical | Permit status: Cmp | Completion date: December 22, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-03857 | |||||
SCORE 100 Client: Betty Rodgers | Permit type: Electrical | Permit status: Cmp | Completion date: April 4, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-04972 | |||||
SCORE 100 Client: Mary Disalvo | Permit type: Electrical | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-00761 | |||||
SCORE 100 Client: Leslie Hoye | Permit type: Electrical | Permit status: Cmp | Completion date: December 22, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-03798 | |||||
SCORE 100 Client: R Goodacre | Permit type: Electrical | Permit status: Cmp | Completion date: August 18, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-05563 | |||||
SCORE 100 Client: Phillip Chang | Permit type: Electrical | Permit status: Cmp | Completion date: November 10, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04840 | |||||
SCORE 100 Client: Warren Hall | Permit type: Electrical | Permit status: Cmp | Completion date: December 10, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-05224 | |||||
SCORE 100 Date: August 8, 2017 Contractor: The Electric Connection Client: Neal Fausset | Permit type: Electrical | Permit status: Cmp | Completion date: August 17, 2017 | Current use: Townhomes, existing | Permit id: Pmt2017-03344 | |||||
SCORE 100 Date: September 21, 2017 Contractor: The Electric Connection Client: Robert Springer | Permit type: Electrical | Permit status: Cmp | Completion date: October 31, 2017 | Current use: Single family attached dwelling, existin | Permit id: Pmt2017-04060 | |||||
SCORE 100 Date: September 21, 2017 Contractor: The Electric Connection Client: Robert Springer | Permit type: Electrical | Permit status: Cmp | Completion date: October 31, 2017 | Current use: Single family detached dwelling, existin | Permit id: Pmt2017-04061 | |||||
SCORE 100 Date: August 2, 2006 Contractor: The Electric Connection Applicant: The Electric Connection- | Permit status: Finaled | Completion date: August 25, 2006 | Expiration date: January 29, 2007 | Permit id: 608020049 | |||||
SCORE 100 Date: October 30, 2006 Contractor: The Electric Connection Applicant: The Electric Connection- | Permit status: Permisud | Expiration date: April 28, 2007 | Permit id: 610300043 | |||||
SCORE 100 Date: April 20, 2016 Contractor: The Electric Connection Applicant: Robert (the Electric Connection) | Permit status: Finaled | Completion date: May 3, 2016 | Expiration date: April 20, 2017 | Permit id: 1604200031 | |||||
SCORE 100 Date: June 2, 2016 Contractor: The Electric Connection Applicant: Gorman Robert | Permit status: Finaled | Completion date: June 6, 2016 | Expiration date: June 2, 2017 | Permit id: 1606020027 | |||||
SCORE 100 Date: June 9, 2016 Contractor: The Electric Connection Applicant: Robert Gorman | Permit status: Finaled | Completion date: June 15, 2016 | Expiration date: June 9, 2017 | Permit id: 1606090010 | |||||
SCORE 100 Date: October 26, 2016 Contractor: The Electric Connection Applicant: Gorman Rob | Permit status: Finaled | Completion date: November 9, 2016 | Expiration date: October 26, 2017 | Permit id: 1610260008 | |||||
SCORE 100 Date: November 10, 2016 Contractor: The Electric Connection Applicant: Has Electric Incorporated | Permit status: Permisud | Expiration date: November 10, 2017 | Permit id: 1611100020 | |||||
SCORE 100 Date: December 13, 2016 Contractor: The Electric Connection Applicant: Romo, Anamarie | Permit status: Finaled | Completion date: January 30, 2017 | Expiration date: December 13, 2017 | Permit id: 1612130030 | |||||
SCORE 100 Date: February 7, 2000 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Permisud | Expiration date: August 5, 2000 | Permit id: 2070036 | |||||
SCORE 100 Date: June 24, 2002 Contractor: The Electric Connection Applicant: The Electric Connection | Permit status: Finaled | Completion date: June 27, 2002 | Expiration date: December 21, 2002 | Permit id: 206240028 | |||||
SCORE 100 Date: July 21, 2006 Contractor: The Electric Connection Applicant: Hopkins Zachary | Permit status: Finaled | Completion date: August 1, 2006 | Expiration date: January 17, 2007 | Permit id: 607210036 | |||||
SCORE 100 Permit type: Electrical service change | Permit status: Permit issued | Expiration date: September 22, 2013 | Permit id: Bp-13-0362 |