Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Unit 200 / 4 S Tunnel Rd, Asheville, Nc 28805 Commercial upfit and occupancy for green 4 life unit 200, add 1 restroom with lay in ceiling and grid, new light, fur walls, new interior partition wasll to include new fitting rooms and storage area;ref 13-321 for master; rec amendment, revisions to plans and structural analysis report per marni graves review comments. Adc.; premise # redacted phone number2 from jeff carpenter; rec amendment, fire sprinkler drawings. Adc.; day tu for gas and electric approved expires 9-4-15 - released both @ 1:22pm Date: August 6, 2015 Contractor: Southeastern Utility Construction Inc Client: Green 4 Life Unit 200 | Permit type: Com: upfit | Permit status: Co issued | Current use: Commercial | Permit id: 15-05870 | Parcel: 249149 | |||||
SCORE 82 Contractor: Southeastern Utility Construction Inc Client: Green 4 Life Unit 200 | Permit type: Fire prevention | Permit status: Finaled | Current use: Fire | Permit id: 15-05875 | Parcel: 249149 | |||||
SCORE 82 Unit 108 / 1863 Hendersonville Rd, Asheville, Nc 28803 Upfit for mountain wellness inc dba the joint with electrical, hvac, plumbing, sheetrock work, mostly open with a storage bathroom at office; applicant submitted made up address number and suite number. 1865 is the ingles building. This building is 1863 hendersonville rd. No site plan submitted indicating unit location within the building. Swr july 3 2014.; called applicant who stated john spake had suite 113 posted above doorway. Please cease use of non-existent 113 number. The joint assigned 1863 hendersonville rd ste 108. This suite is located to left of papa murphy (ste 112) and to the right of three suites taken by massage envy (ste 100). ; sls called lm with chad informing permit is approved pending conditions;sls; paid msd fees of 8 on 7/23/14 by check; rec. Amendment for fire sprinkler work with specs and drawings; premise number redacted phone number2 Date: October 6, 2014 Contractor: Southeastern Utility Construction Inc Permit type: Com: remodel | Permit status: Co issued | Permit id: 14-09295 | Parcel: 239686 | |||||
SCORE 82 Contractor: Southeastern Utility Construction Inc Permit status: Co issued | Permit id: 14-09296 | Parcel: 239686 | |||||
SCORE 82 Contractor: Southeastern Utility Construction Inc Permit status: Finaled | Permit id: 15-05875 | Parcel: 249149 | |||||
SCORE 82 108, / 1863 Hendersonville Rd, Asheville, Nc 28803 Upfit for mountain wellness inc dba the joint with electrical, hvac, plumbing, sheetrock work, mostly open with a storage bathroom at office Date: October 6, 2014 Contractor: Southeastern Utility Construction Inc Client: Mountain Wellness Inc Dba The Joint | Permit type: Fire prevention | Permit status: Co issued | Current use: Fire | Permit id: 14-09296 | Parcel: 239686 | |||||
SCORE 82 108, / 1863 Hendersonville Rd, Asheville, Nc 28803 Upfit for mountain wellness inc dba the joint with electrical, hvac, plumbing, sheetrock work, mostly open with a storage bathroom at office; applicant submitted made up address number and suite number. 1865 is the ingles building. This building is 1863 hendersonville rd. No site plan submitted indicating unit location within the building. Swr july 3 2014.; called applicant who stated john spake had suite 113 posted above doorway. Please cease use of non-existent 113 number. The joint assigned 1863 hendersonville rd ste 108. This suite is located to left of papa murphy (ste 112) and to the right of three suites taken by massage envy (ste 100). ; sls called lm with chad informing permit is approved pending conditions;sls; paid msd fees of 8 on 7 23 14 by check; rec. Amendment for fire sprinkler work with specs and drawings; premise number redacted phone number2 Date: October 6, 2014 Contractor: Southeastern Utility Construction Inc Permit type: Com: remodel | Permit status: Co issued | Permit id: 14-09295 | Parcel: 239686 | |||||
SCORE 82 Date: October 6, 2014 Contractor: Southeastern Utility Construction Inc Permit status: Co issued | Permit id: 14-09296 | Parcel: 239686 | |||||
SCORE 82 200, / 4 S Tunnel Rd, Asheville, Nc 28805 Commercial upfit and occupancy for green 4 life unit 200, add 1 restroom with lay in ceiling and grid, new light, fur walls, new interior partition wasll to include new fitting rooms and storage area;ref 13-321 for master; rec amendment, revisions to plans and structural analysis report per marni graves review comments. Adc.; premise # redacted phone number2 from jeff carpenter; rec amendment, fire sprinkler drawings. Adc.; day tu for gas and electric approved expires 9-4-15 - released both @ 1:22pm Date: August 6, 2015 Contractor: Southeastern Utility Construction Inc Client: Green 4 Life Unit 200 | Permit type: Com: upfit | Permit status: Co issued | Current use: Commercial | Permit id: 15-05870 | Parcel: 249149 | |||||
SCORE 82 Date: July 30, 2015 Contractor: Southeastern Utility Construction Inc Permit status: Finaled | Permit id: 15-05875 | Parcel: 249149 |