QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 61 9456 Olson Pl Sw Seattle Wa [a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] solar installation and sub panel Date: March 17, 2017 Contractor: Solx CorpPermit type: Electrical | Permit status: Permit closed | Completion date: March 22, 2017 | Expiration date: March 17, 2018 | Current use: Single family / duplex | Permit id: 6586760 | |||||
SCORE 61 5 N 59th St Seattle Wa 8-9-17 bz revision one-line approved[a one-line diagram will be required on site at the time of inspection of any renewable energy system. A cover inspection is required before installation begins, but after the equipment is on-site. ] rooftop solar installation - 9. 86 kw. 07 11 17 jk approved plans. Date: June 29, 2017 Contractor: Solx CorpPermit type: Electrical | Permit status: Permit closed | Completion date: September 8, 2017 | Expiration date: June 29, 2018 | Current use: Single family / duplex | Permit id: 6605555 | |||||
SCORE 61 Date: August 9, 2017 Contractor: Solx CorpPermit type: Electrical | Permit status: Permit closed | Completion date: September 8, 2017 | Expiration date: August 9, 2018 | Current use: Single family / duplex | Permit id: 6612421 |