QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 100 Date: March 26, 2010 Contractor: Safeway ElectricApplicant: Cortinas Andrew | Permit status: Finaled | Completion date: March 31, 2010 | Permit id: 1003260004 | |||||
SCORE 100 Date: April 28, 2010 Contractor: Safeway ElectricApplicant: Safe-Way Electric | Permit status: Finaled | Completion date: May 4, 2010 | Permit id: 1004280004 | |||||
SCORE 100 Date: August 10, 2011 Contractor: Safeway ElectricApplicant: Safe-Way Electric | Permit status: Finaled | Completion date: November 14, 2011 | Permit id: 1108100043 | |||||
SCORE 100 Date: September 6, 2011 Contractor: Safeway ElectricApplicant: Ken Beeman | Permit status: Finaled | Completion date: September 13, 2011 | Permit id: 1109060038 | |||||
SCORE 100 Date: August 6, 2012 Contractor: Safeway ElectricApplicant: Beeman Kenneth | Permit status: Finaled | Completion date: August 21, 2012 | Permit id: 1208060025 | |||||
SCORE 100 Date: December 10, 2012 Contractor: Safeway ElectricApplicant: David Russell Arlington | Permit status: Finaled | Completion date: January 12, 2013 | Permit id: 1212100010 | |||||
SCORE 100 Date: February 20, 2013 Contractor: Safeway ElectricApplicant: Safe-Way Electric | Permit status: Finaled | Completion date: February 21, 2013 | Permit id: 1302200043 | |||||
SCORE 100 Date: March 7, 2014 Contractor: Safeway ElectricApplicant: Daniel Meza | Permit status: Finaled | Completion date: March 10, 2014 | Permit id: 1403070013 | |||||
SCORE 100 Date: August 2, 2011 Contractor: Safeway ElectricApplicant: Dave Arlington | Permit status: Finaled | Completion date: August 11, 2011 | Permit id: 1108020031 | |||||
SCORE 100 Date: October 10, 2011 Contractor: Safeway ElectricClient: Frederick Patton | Applicant: Frederick Patton | Permit type: Electrical | Permit id: 10003 | |||||
SCORE 100 Date: August 5, 2014 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Finaled | Completion date: August 24, 2014 | Expiration date: August 5, 2015 | Permit id: 1407150008 | |||||
SCORE 100 Engineer: N, A | Applicant: Safeway Electric | Permit status: Finaled | Completion date: June 5, 2013 | Expiration date: March 27, 2014 | Permit id: 1302260009 | |||||
SCORE 100 Date: March 7, 2014 Contractor: Safeway ElectricApplicant: Daniel Meza | Permit status: Finaled | Completion date: March 10, 2014 | Expiration date: March 7, 2015 | Permit id: 1403070013 | |||||
SCORE 100 Date: February 20, 2013 Contractor: Safeway ElectricApplicant: Safe-Way Electric | Permit status: Finaled | Completion date: February 21, 2013 | Expiration date: February 20, 2014 | Permit id: 1302200043 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: August 28, 2014 | Expiration date: August 5, 2015 | Permit id: 1407150018 | |||||
SCORE 100 Date: October 1, 2015 Contractor: Safeway ElectricApplicant: Albert Dominguez/ Safe-Way Electric | Permit status: Finaled | Completion date: October 5, 2015 | Expiration date: September 30, 2016 | Permit id: 1510010032 | |||||
SCORE 100 Date: March 26, 2010 Contractor: Safeway ElectricApplicant: Cortinas Andrew | Permit status: Finaled | Completion date: March 31, 2010 | Expiration date: March 26, 2011 | Permit id: 1003260004 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: July 25, 2014 | Expiration date: June 23, 2015 | Permit id: 1406040012 | |||||
SCORE 100 Date: August 6, 2014 Contractor: Safeway ElectricApplicant: Dominguez Albert | Permit status: Finaled | Completion date: August 8, 2014 | Expiration date: August 6, 2015 | Permit id: 1408060010 | |||||
SCORE 100 Date: September 6, 2011 Contractor: Safeway ElectricApplicant: Ken Beeman | Permit status: Finaled | Completion date: September 13, 2011 | Expiration date: September 5, 2012 | Permit id: 1109060038 | |||||
SCORE 100 Date: June 23, 2014 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Finaled | Completion date: July 24, 2014 | Expiration date: June 23, 2015 | Permit id: 1406040009 | |||||
SCORE 100 Date: May 1, 2014 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Permisud | Expiration date: May 1, 2015 | Permit id: 1404170049 | |||||
SCORE 100 Date: January 28, 2014 Contractor: Safeway ElectricEngineer: N, A | Applicant: Perez Luis | Permit status: Finaled | Completion date: March 3, 2014 | Expiration date: January 28, 2015 | Permit id: 1401280045 | |||||
SCORE 100 Date: November 19, 2013 Contractor: Safeway ElectricApplicant: Perez Luis | Permit status: Finaled | Completion date: December 17, 2013 | Expiration date: November 19, 2014 | Permit id: 1310310017 | |||||
SCORE 100 Date: October 8, 2013 Contractor: Safeway ElectricEngineer: N, A | Applicant: Perez Luis | Permit status: Finaled | Completion date: March 3, 2014 | Expiration date: October 8, 2014 | Permit id: 1309190022 | |||||
SCORE 100 Date: October 8, 2013 Contractor: Safeway ElectricEngineer: N, A | Applicant: Perez Luis | Permit status: Finaled | Completion date: October 31, 2013 | Expiration date: October 8, 2014 | Permit id: 1309190023 | |||||
SCORE 100 Date: June 4, 2013 Contractor: Safeway ElectricEngineer: N, A | Applicant: Perez Luis | Permit status: Finaled | Completion date: August 23, 2013 | Expiration date: June 4, 2014 | Permit id: 1305230019 | |||||
SCORE 100 26858 Wyatt Ln Stevenson Ranch Ca Elect for roof-mounted pv sys 10. 4 kw 32 panels 5 sq ft replace (e) 2 amp main service panel with same Date: June 4, 2013 Contractor: Safeway ElectricEngineer: N, A | Applicant: Perez Luis | Permit status: Finaled | Completion date: August 22, 2013 | Expiration date: June 4, 2014 | Permit id: 1305230022 | |||||
SCORE 100 Date: June 4, 2013 Contractor: Safeway ElectricEngineer: N, A | Applicant: Safeway Electric | Permit status: Finaled | Completion date: July 25, 2013 | Expiration date: June 4, 2014 | Permit id: 1305210005 | |||||
SCORE 100 Date: April 25, 2013 Contractor: Safeway ElectricEngineer: N, A | Applicant: Perez Luis | Permit status: Finaled | Completion date: June 12, 2013 | Expiration date: April 25, 2014 | Permit id: 1304040006 | |||||
SCORE 100 Date: April 25, 2013 Contractor: Safeway ElectricApplicant: Perez Luis | Permit status: Finaled | Completion date: June 4, 2013 | Expiration date: April 25, 2014 | Permit id: 1303270019 | |||||
SCORE 100 Date: March 27, 2013 Contractor: Safeway ElectricEngineer: N, A | Applicant: Safeway Electric | Permit status: Finaled | Completion date: June 5, 2013 | Expiration date: March 27, 2014 | Permit id: 1302260003 | |||||
SCORE 100 Date: February 4, 2013 Contractor: Safeway ElectricEngineer: N, A | Applicant: Safeway Electric | Permit status: Finaled | Completion date: February 15, 2013 | Expiration date: February 4, 2014 | Permit id: 1212200021 | |||||
SCORE 100 Applicant: Perez Luis | Permit status: Finaled | Completion date: December 17, 2013 | Expiration date: November 19, 2014 | Permit id: 1310310023 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Permisud | Expiration date: May 1, 2015 | Permit id: 1404170060 | |||||
SCORE 100 Engineer: N, A | Applicant: Perez Luis | Permit status: Finaled | Completion date: March 3, 2014 | Expiration date: October 8, 2014 | Permit id: 1309190036 | |||||
SCORE 100 Engineer: N, A | Applicant: Perez Luis | Permit status: Finaled | Completion date: October 31, 2013 | Expiration date: October 8, 2014 | Permit id: 1309190037 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: October 31, 2013 | Expiration date: July 11, 2014 | Permit id: 1306270011 | |||||
SCORE 100 Engineer: N, A | Applicant: Perez Luis | Permit status: Finaled | Completion date: August 22, 2013 | Expiration date: June 4, 2014 | Permit id: 1305230017 | |||||
SCORE 100 Engineer: N, A | Applicant: Perez Luis | Permit status: Finaled | Completion date: August 23, 2013 | Expiration date: June 4, 2014 | Permit id: 1305230014 | |||||
SCORE 100 Engineer: N, A | Applicant: Safeway Electric | Permit status: Finaled | Completion date: July 25, 2013 | Expiration date: June 4, 2014 | Permit id: 1305210004 | |||||
SCORE 100 Applicant: Perez Luis | Permit status: Finaled | Completion date: June 4, 2013 | Expiration date: April 25, 2014 | Permit id: 1303270027 | |||||
SCORE 100 Engineer: N, A | Applicant: Safeway Electric | Permit status: Finaled | Completion date: February 15, 2013 | Expiration date: February 4, 2014 | Permit id: 1212200042 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: October 11, 2012 | Expiration date: October 11, 2013 | Permit id: 1209120060 | |||||
SCORE 100 Date: April 28, 2010 Contractor: Safeway ElectricApplicant: Safe-Way Electric | Permit status: Finaled | Completion date: May 4, 2010 | Expiration date: April 28, 2011 | Permit id: 1004280004 | |||||
SCORE 100 Date: August 6, 2012 Contractor: Safeway ElectricApplicant: Beeman Kenneth | Permit status: Finaled | Completion date: August 21, 2012 | Expiration date: August 6, 2013 | Permit id: 1208060025 | |||||
SCORE 100 Date: October 11, 2012 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Finaled | Completion date: October 11, 2012 | Expiration date: October 11, 2013 | Permit id: 1209120037 | |||||
SCORE 100 Date: May 25, 2012 Contractor: Safeway ElectricEngineer: Matt Harding | Applicant: Safeway Electric T. Peelen | Permit status: Finaled | Completion date: May 25, 2012 | Expiration date: May 25, 2013 | Permit id: 1205070005 | |||||
SCORE 100 Date: July 11, 2013 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Finaled | Completion date: October 31, 2013 | Expiration date: July 11, 2014 | Permit id: 1306270007 | |||||
SCORE 100 Date: October 5, 2015 Contractor: Safeway ElectricApplicant: Nye Kevin | Permit status: Finaled | Completion date: October 6, 2015 | Expiration date: October 4, 2016 | Permit id: 1510050026 | |||||
SCORE 100 Engineer: Matt Harding | Applicant: Safeway Electric | Permit status: Finaled | Completion date: May 25, 2012 | Expiration date: May 25, 2013 | Permit id: 1205070004 | |||||
SCORE 100 Date: August 10, 2011 Contractor: Safeway ElectricApplicant: Safe-Way Electric | Permit status: Finaled | Completion date: November 14, 2011 | Expiration date: August 9, 2012 | Permit id: 1108100043 | |||||
SCORE 100 Engineer: N, A | Applicant: Perez Luis | Permit status: Finaled | Completion date: June 12, 2013 | Expiration date: April 25, 2014 | Permit id: 1304040016 | |||||
SCORE 100 Date: August 2, 2011 Contractor: Safeway ElectricApplicant: Dave Arlington | Permit status: Finaled | Completion date: August 11, 2011 | Expiration date: August 1, 2012 | Permit id: 1108020031 | |||||
SCORE 100 Date: September 24, 2014 Contractor: Safeway ElectricApplicant: Daniel Meza | Permit status: Finaled | Completion date: September 29, 2014 | Expiration date: September 24, 2015 | Permit id: 1409240075 | |||||
SCORE 100 Date: July 18, 2016 Contractor: Safeway ElectricApplicant: Arlington Dave | Permit status: Finaled | Completion date: August 4, 2016 | Expiration date: July 18, 2017 | Permit id: 1607180015 | |||||
SCORE 100 Engineer: N, A | Applicant: Safeway Electric Ramon Farias | Permit status: Finaled | Completion date: April 10, 2014 | Expiration date: March 5, 2015 | Permit id: 1402270005 | |||||
SCORE 100 Applicant: Safeway Electric Ramon Fariar | Permit status: Finaled | Completion date: May 1, 2014 | Expiration date: March 5, 2015 | Permit id: 1402270006 | |||||
SCORE 100 Date: August 6, 2014 Contractor: Safeway ElectricApplicant: Dominguez Albert | Permit status: Finaled | Completion date: August 8, 2014 | Permit id: 1408060010 | |||||
SCORE 100 Date: September 24, 2014 Contractor: Safeway ElectricApplicant: Daniel Meza | Permit status: Finaled | Completion date: September 29, 2014 | Permit id: 1409240075 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: May 25, 2012 | Permit id: 1205070004 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: October 11, 2012 | Permit id: 1209120060 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: February 15, 2013 | Permit id: 1212200042 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: June 5, 2013 | Permit id: 1302260009 | |||||
SCORE 100 Applicant: Perez Luis | Permit status: Finaled | Completion date: June 4, 2013 | Permit id: 1303270027 | |||||
SCORE 100 Applicant: Perez Luis | Permit status: Finaled | Completion date: June 12, 2013 | Permit id: 1304040016 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: July 25, 2013 | Permit id: 1305210004 | |||||
SCORE 100 Applicant: Perez Luis | Permit status: Finaled | Completion date: August 23, 2013 | Permit id: 1305230014 | |||||
SCORE 100 Applicant: Perez Luis | Permit status: Finaled | Completion date: August 22, 2013 | Permit id: 1305230017 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: October 31, 2013 | Permit id: 1306270011 | |||||
SCORE 100 Applicant: Perez Luis | Permit status: Finaled | Completion date: March 3, 2014 | Permit id: 1309190036 | |||||
SCORE 100 Applicant: Perez Luis | Permit status: Finaled | Completion date: October 31, 2013 | Permit id: 1309190037 | |||||
SCORE 100 Applicant: Perez Luis | Permit status: Finaled | Completion date: December 17, 2013 | Permit id: 1310310023 | |||||
SCORE 100 Applicant: Safeway Electric Ramon Farias | Permit status: Finaled | Completion date: April 10, 2014 | Permit id: 1402270005 | |||||
SCORE 100 Applicant: Safeway Electric Ramon Fariar | Permit status: Finaled | Completion date: May 1, 2014 | Permit id: 1402270006 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Permisud | Permit id: 1404170060 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: July 25, 2014 | Permit id: 1406040012 | |||||
SCORE 100 Applicant: Safeway Electric | Permit status: Finaled | Completion date: August 28, 2014 | Permit id: 1407150018 | |||||
SCORE 100 Date: May 25, 2012 Contractor: Safeway ElectricApplicant: Safeway Electric T. Peelen | Permit status: Finaled | Completion date: May 25, 2012 | Permit id: 1205070005 | |||||
SCORE 100 Date: October 11, 2012 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Finaled | Completion date: October 11, 2012 | Permit id: 1209120037 | |||||
SCORE 100 Date: February 4, 2013 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Finaled | Completion date: February 15, 2013 | Permit id: 1212200021 | |||||
SCORE 100 Date: March 27, 2013 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Finaled | Completion date: June 5, 2013 | Permit id: 1302260003 | |||||
SCORE 100 Date: April 25, 2013 Contractor: Safeway ElectricApplicant: Perez Luis | Permit status: Finaled | Completion date: June 4, 2013 | Permit id: 1303270019 | |||||
SCORE 100 Date: April 25, 2013 Contractor: Safeway ElectricApplicant: Perez Luis | Permit status: Finaled | Completion date: June 12, 2013 | Permit id: 1304040006 | |||||
SCORE 100 Date: June 4, 2013 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Finaled | Completion date: July 25, 2013 | Permit id: 1305210005 | |||||
SCORE 100 Date: June 4, 2013 Contractor: Safeway ElectricApplicant: Perez Luis | Permit status: Finaled | Completion date: August 23, 2013 | Permit id: 1305230019 | |||||
SCORE 100 26858 Wyatt Ln Stevenson Ranch Ca 91381 Elect for roof-mounted pv sys 10. 4 kw 32 panels 5 sq ft replace (e) 2 amp main service panel with same Date: June 4, 2013 Contractor: Safeway ElectricApplicant: Perez Luis | Permit status: Finaled | Completion date: August 22, 2013 | Permit id: 1305230022 | |||||
SCORE 100 Date: July 11, 2013 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Finaled | Completion date: October 31, 2013 | Permit id: 1306270007 | |||||
SCORE 100 Date: October 8, 2013 Contractor: Safeway ElectricApplicant: Perez Luis | Permit status: Finaled | Completion date: March 3, 2014 | Permit id: 1309190022 | |||||
SCORE 100 Date: October 8, 2013 Contractor: Safeway ElectricApplicant: Perez Luis | Permit status: Finaled | Completion date: October 31, 2013 | Permit id: 1309190023 | |||||
SCORE 100 27023 Timberline Te Stevenson Ranch Ca 91381 Elect for roof-mounted pv 6. 8 kw,21 panels,367. 5 sq ft Date: November 19, 2013 Contractor: Safeway ElectricApplicant: Perez Luis | Permit status: Finaled | Completion date: December 17, 2013 | Permit id: 1310310017 | |||||
SCORE 100 Date: January 28, 2014 Contractor: Safeway ElectricApplicant: Perez Luis | Permit status: Finaled | Completion date: March 3, 2014 | Permit id: 1401280045 | |||||
SCORE 100 Date: May 1, 2014 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Permisud | Permit id: 1404170049 | |||||
SCORE 100 Date: June 23, 2014 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Finaled | Completion date: July 24, 2014 | Permit id: 1406040009 | |||||
SCORE 100 Date: August 5, 2014 Contractor: Safeway ElectricApplicant: Safeway Electric | Permit status: Finaled | Completion date: August 24, 2014 | Permit id: 1407150008 | |||||
SCORE 100 Engineer: N A | Applicant: Safeway Electric Ramon Farias | Applicant Phone: (760) 871-2400 | Permit id: 1402270005 | |||||
SCORE 100 Applicant: Safeway Electric Ramon Fariar | Applicant Phone: (760) 871-2400 | Permit id: 1402270006 | |||||
SCORE 100 Applicant: Safeway Electric | Applicant Phone: (760) 670-8171 | Permit id: 1406040012 | |||||
SCORE 100 Applicant: Perez Luis | Applicant Phone: (260) 803-5175 | Permit id: 1303270027 | |||||
SCORE 100 Engineer: N/a | Applicant: Perez Luis | Applicant Phone: (760) 803-5175 | Permit id: 1304040016 | |||||
SCORE 100 Applicant: Safeway Electric | Applicant Phone: (760) 670-8171 | Permit id: 1407150018 | |||||
SCORE 100 Engineer: Na | Applicant: Perez Luis | Applicant Phone: (760) 803-5174 | Permit id: 1309190036 | |||||
SCORE 100 Engineer: Na | Applicant: Perez Luis | Applicant Phone: (760) 803-5175 | Permit id: 1309190037 | |||||
SCORE 100 Engineer: Na | Applicant: Safeway Electric | Applicant Phone: (760) 745-2838 | Permit id: 1305210004 | |||||
SCORE 100 Engineer: Na | Applicant: Perez Luis | Applicant Phone: (760) 803-5175 | Permit id: 1305230014 | |||||
SCORE 100 Engineer: Na | Applicant: Perez Luis | Applicant Phone: (760) 871-2400 | Permit id: 1305230017 | |||||
SCORE 100 Applicant: Safeway Electric | Applicant Phone: (760) 871-2400 | Permit id: 1404170060 | |||||
SCORE 100 Applicant: Perez Luis | Applicant Phone: (760) 803-5175 | Permit id: 1310310023 | |||||
SCORE 100 Engineer: N/a | Applicant: Safeway Electric | Applicant Phone: (760) 871-2400 | Permit id: 1302260009 | |||||
SCORE 100 Engineer: N A | Applicant: Safeway Electric | Applicant Phone: (760) 871-2400 | Permit id: 1212200042 | |||||
SCORE 100 Applicant: Safeway Electric | Applicant Phone: (760) 871-2400 | Permit id: 1209120060 | |||||
SCORE 100 Date: October 18, 2011 Contractor: Safeway ElectricApplicant: Lydia Hudson | Permit type: Electrical | Permit id: 10241 | |||||
SCORE 100 1024 Marilyn Dr Baton Rouge La Residential generator 14kw. 1000 btus. Natural gas. See panel load calculation. Applicant: Darryl Williams | Permit type: Residential: generator | Permit id: 21079 |