Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 70 13 Center Pz Boston Ma Relocate a 6" hot water line for the buildings hotwater heating system on the 1st floor egress of 3 center plaza bfd paid detail required Date: November 8, 2016 Contractor: Roger Gagnon Client: Sri Ten Center Plaza Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw650879 | Parcel: 0302717000 | |||||
SCORE 70 126 High St Boston Ma The work will consist of burning and welding operations required for the hvac piping on floors 1 2 3 4 5 6 7 8 9 and the basement (dpl) bfd paid detail required Date: May 12, 2017 Contractor: Roger Gagnon Permit type: Bfd cutting-burning-welding | Permit id: Cbw703970 | |||||
SCORE 70 204216 Massachusett Boston Ma Repair the head plate of chiller #3 that gives chilled water to building the work will be performed on the 1st floor. (dpl 6 9 17) bfd paid detail required Date: May 23, 2017 Contractor: Roger Gagnon Client: First Church Of Christian | Permit type: Bfd cutting-burning-welding | Permit id: Cbw708490 | Parcel: 0401185000 | |||||
SCORE 70 Date: March 1, 2017 Contractor: Roger Gagnon Client: High Pearl Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw680506 | Parcel: 0304180000 | |||||
SCORE 70 Broad St Boston Ma Burning and welding for installation of a new chiller unit an air handling unit and a condenser pump (dpl) bfd paid detail required Date: July 20, 2017 Contractor: Roger Gagnon Permit type: Bfd cutting-burning-welding | Permit id: Cbw733318 |