QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 62 2607 Military Rd Nw, Washington, Dc 20015 St. Johns college high school is modernizing its academic and student life facilities with a series of small building additions and renovations of existing spaces. These improvements include the addition of a new small 3-story classroom wing for music rooms and classrooms on 27th st, renovation of two art classrooms at basement level and exterior patio, enclosure of an existing walk with a 1- story covered glass walkway at courtyard, renovation of the existing music department space into a ministry center and theater rehearsal space at basement level, addition of 1-story storage space to the existing boiler room for the schools facilities department at courtyard. Included in these projects are site improvements to the existing courtyard - including new stormwater management facilities and accessible paths - and addition of 2 new interior elevators, one to service the new classroom addition, and one to service the auditorium from the schools main entrance. Each of these projects will im Date: July 29, 2015 Contractor: Ralph MitchellClient: St Johns College High School | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1505192 | |||||
SCORE 62 Date: January 27, 2016 Contractor: Ralph MitchellClient: Saint Johns College Inc | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1603486 |