QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 88 Date: September 12, 2012 Contractor: Philip FerraraClient: Colon, Johnny D | Completion date: February 26, 2013 | Permit id: Bp-12-04385 | Parcel: 15635081021 | |||||
SCORE 88 Date: February 1, 2011 Contractor: Philip FerraraClient: Rish, Jeff W Iii | Completion date: January 25, 2012 | Permit id: Bp-11-00453 | Parcel: 06680010061 | |||||
SCORE 88 Date: February 1, 2011 Contractor: Philip FerraraClient: Rish, Jeff W Iii | Permit id: Bp-11-00453 | Parcel: 06680010061 | |||||
SCORE 88 Date: September 12, 2012 Contractor: Philip FerraraClient: Colon, Johnny D | Permit id: Bp-12-04385 | Parcel: 15635081021 | |||||
SCORE 88 Date: August 23, 2016 Contractor: Philip FerraraClient: Mickle, Stephan & Evelyn | Permit id: Bp-16-05405 | Parcel: 15847000000 | |||||
SCORE 88 Date: August 23, 2016 Contractor: Philip FerraraClient: Hobby, Daniel T & Brenda G | Permit id: Bp-16-05402 | Parcel: 06686018000 | |||||
SCORE 88 Date: August 24, 2016 Contractor: Philip FerraraClient: Dobbs & Dobbs | Permit id: Bp-16-05467 | Parcel: 06107727025 | |||||
SCORE 88 Date: August 22, 2016 Contractor: Philip FerraraClient: Abraham & Thomas W H & Abraham | Permit id: Bp-16-05387 | Parcel: 06066600030 | |||||
SCORE 88 Date: August 11, 2016 Contractor: Philip FerraraClient: Juncal, Casto & Sandra I | Permit id: Bp-16-05164 | Parcel: 06770156000 | |||||
SCORE 88 Date: August 9, 2016 Contractor: Philip FerraraClient: Lott T Frances | Permit id: Bp-16-05081 | Parcel: 06015240116 | |||||
SCORE 88 Date: August 24, 2016 Contractor: Philip FerraraClient: North Florida Holdings Llc | Permit id: Bp-16-05446 | Parcel: 06110004001 | |||||
SCORE 88 Date: August 11, 2016 Contractor: Philip FerraraClient: Scarlet Susan | Permit id: Bp-16-05161 | Parcel: 15668000000 | |||||
SCORE 88 Date: August 29, 2016 Contractor: Philip FerraraClient: Jeffrey Charlotte D | Permit id: Bp-16-05567 | Parcel: 09138001000 | |||||
SCORE 88 Date: August 22, 2016 Contractor: Philip FerraraClient: Pellett & Pellett | Permit id: Bp-16-05388 | Parcel: 07301505000 | |||||
SCORE 88 Date: August 1, 2016 Contractor: Philip FerraraClient: Saab & Xu H W | Permit id: Bp-16-04897 | Parcel: 06375200021 | |||||
SCORE 88 Date: July 26, 2016 Contractor: Philip FerraraClient: Lynch & Lynch | Permit id: Bp-16-04769 | Parcel: 06680020002 | |||||
SCORE 88 Date: July 25, 2016 Contractor: Philip FerraraClient: Nance, Mary Lee | Permit id: Bp-16-04752 | Parcel: 06680101017 | |||||
SCORE 88 Date: July 14, 2016 Contractor: Philip FerraraClient: Flowers & Rose W H | Permit id: Bp-16-04524 | Parcel: 06431038000 | |||||
SCORE 88 Date: July 19, 2016 Contractor: Philip FerraraClient: Handley & Handley | Permit id: Bp-16-04616 | Parcel: 06006067239 | |||||
SCORE 88 Date: July 8, 2016 Contractor: Philip FerraraClient: Junior League Of Gville Inc | Permit id: Bp-16-04374 | Parcel: 14798001000 | |||||
SCORE 88 Date: July 8, 2016 Contractor: Philip FerraraClient: Floyd, John Osullivan | Permit id: Bp-16-04370 | Parcel: 06076060013 | |||||
SCORE 88 Date: July 29, 2016 Contractor: Philip FerraraClient: Moffatt, Scott M Katrina A | Permit id: Bp-16-04872 | Parcel: 06103010082 | |||||
SCORE 88 Date: July 19, 2016 Contractor: Philip FerraraClient: Collins, Julie | Permit id: Bp-16-04580 | Parcel: 06083010080 | |||||
SCORE 88 Date: June 20, 2016 Contractor: Philip FerraraClient: Hope Property Management Llc | Permit id: Bp-16-03945 | Parcel: 06014025005 | |||||
SCORE 88 Date: June 14, 2016 Contractor: Philip FerraraClient: Westberg, Kathleen | Permit id: Bp-16-03770 | Parcel: 07891030256 | |||||
SCORE 88 Date: June 6, 2016 Contractor: Philip FerraraClient: Hume, Rosemary | Permit id: Bp-16-03476 | Parcel: 06063144000 | |||||
SCORE 88 Date: June 1, 2016 Contractor: Philip FerraraClient: Cardenas, Sandra L | Permit id: Bp-16-03354 | Parcel: 09000001102 | |||||
SCORE 88 Date: June 6, 2016 Contractor: Philip FerraraClient: Mcmurray & Syed W H | Permit id: Bp-16-03473 | Parcel: 06017033002 | |||||
SCORE 88 Date: June 21, 2016 Contractor: Philip FerraraClient: Shannon, Erica L | Permit id: Bp-16-03949 | Parcel: 06383030019 | |||||
SCORE 88 Date: June 21, 2016 Contractor: Philip FerraraClient: Hammond, Richard Barry Margaret Dann | Permit id: Bp-16-03992 | Parcel: 12158000000 | |||||
SCORE 88 Date: June 8, 2016 Contractor: Philip FerraraClient: Samraj & Srinivasan H W | Permit id: Bp-16-03611 | Parcel: 07891030236 | |||||
SCORE 88 Date: June 22, 2016 Contractor: Philip FerraraClient: Covey & Sandelin | Permit id: Bp-16-04015 | Parcel: 06423006000 | |||||
SCORE 88 Date: June 21, 2016 Contractor: Philip FerraraClient: Bartness, Dean Scott Wendee Whittaker | Permit id: Bp-16-03939 | Parcel: 06087020029 | |||||
SCORE 88 Date: May 17, 2016 Contractor: Philip FerraraClient: Lam, Hai T | Permit id: Bp-16-02990 | Parcel: 07312008027 | |||||
SCORE 88 Date: May 6, 2016 Contractor: Philip FerraraClient: Johnston, William D | Permit id: Bp-16-02793 | Parcel: 14103000000 | |||||
SCORE 88 Date: May 4, 2016 Contractor: Philip FerraraClient: Pickett, Matthew Alan | Permit id: Bp-16-02743 | Parcel: 06750010042 | |||||
SCORE 88 Date: February 20, 2013 Contractor: Philip FerraraClient: Kallman, Gladys J | Completion date: July 19, 2013 | Permit id: Bp-13-01012 | Parcel: 06407017000 | |||||
SCORE 88 Date: January 23, 2013 Contractor: Philip FerraraClient: Barnett, Rosemary Virginia | Completion date: July 16, 2013 | Permit id: Bp-13-00431 | Parcel: 06020050021 | |||||
SCORE 88 Date: June 6, 2013 Contractor: Philip FerraraClient: Stevens, Mark D Susan A | Completion date: October 31, 2013 | Permit id: Bp-13-03261 | Parcel: 09828000000 | |||||
SCORE 88 Date: August 30, 2012 Contractor: Philip FerraraClient: Licona, Reynaldo Maria E | Completion date: February 15, 2013 | Permit id: Bp-12-04172 | Parcel: 09004042000 | |||||
SCORE 88 Date: August 16, 2012 Contractor: Philip FerraraClient: Barnes, Margie L | Completion date: February 12, 2013 | Permit id: Bp-12-03919 | Parcel: 06083004001 | |||||
SCORE 88 Date: January 23, 2013 Contractor: Philip FerraraClient: Kuypers & Kuypers & Kuypers | Completion date: July 18, 2013 | Permit id: Bp-13-00402 | Parcel: 08992032029 | |||||
SCORE 88 Date: October 4, 2011 Contractor: Philip FerraraClient: Lodwick, David A Dana C | Completion date: May 4, 2012 | Permit id: Bp-11-05127 | Parcel: 15631212003 | |||||
SCORE 88 Date: March 5, 2013 Contractor: Philip FerraraClient: Federal National Mortgage, Association | Completion date: June 21, 2013 | Permit id: Bp-13-01261 | Parcel: 06574049071 | |||||
SCORE 88 Date: April 1, 2013 Contractor: Philip FerraraClient: Rbc Bank (usa) | Completion date: April 2, 2013 | Permit id: Bp-13-01868 | Parcel: 06053090008 | |||||
SCORE 88 Date: June 13, 2013 Contractor: Philip FerraraClient: Madsen, Paul E | Completion date: September 11, 2013 | Permit id: Bp-13-03404 | Parcel: 06383035011 | |||||
SCORE 88 Date: May 14, 2013 Contractor: Philip FerraraClient: Ali & Jackson | Completion date: October 15, 2013 | Permit id: Bp-13-02817 | Parcel: 08202107000 | |||||
SCORE 88 Date: May 24, 2011 Contractor: Philip FerraraClient: Mackoul, Annette St Pierre | Completion date: November 29, 2011 | Permit id: Bp-11-02439 | Parcel: 06724104412 | |||||
SCORE 88 Date: March 12, 2012 Contractor: Philip FerraraClient: Halim & Halim & Halim &, Haraeedy | Completion date: October 31, 2012 | Permit id: Bp-12-01145 | Parcel: 06701112000 | |||||
SCORE 88 Date: August 21, 2012 Contractor: Philip FerraraClient: Bustamante, Celia Elizabeth | Completion date: February 15, 2013 | Permit id: Bp-12-03982 | Parcel: 07284500107 | |||||
SCORE 88 Date: August 3, 2011 Contractor: Philip FerraraClient: Turner, Aaron Jr Patricia E | Completion date: February 10, 2012 | Permit id: Bp-11-04007 | Parcel: 07966010004 | |||||
SCORE 88 Date: September 8, 2011 Contractor: Philip FerraraClient: Ott & Vickers | Completion date: January 8, 2013 | Permit id: Bp-11-04690 | Parcel: 09235002000 | |||||
SCORE 88 Date: February 7, 2013 Contractor: Philip FerraraClient: Kirkham & Kirkham | Completion date: July 19, 2013 | Permit id: Bp-13-00739 | Parcel: 06410006000 | |||||
SCORE 88 Date: February 28, 2013 Contractor: Philip FerraraClient: Baker, James D Iii Julie R | Completion date: July 24, 2013 | Permit id: Bp-13-01179 | Parcel: 07902020001 | |||||
SCORE 88 Date: May 23, 2011 Contractor: Philip FerraraClient: Mccants, Thomas J Iii Patricia S | Completion date: November 29, 2011 | Permit id: Bp-11-02401 | Parcel: 12707000000 | |||||
SCORE 88 Date: May 23, 2011 Contractor: Philip FerraraClient: Lapointe, Wendy J Trustee | Completion date: January 11, 2012 | Permit id: Bp-11-02400 | Parcel: 06655215004 | |||||
SCORE 88 Date: May 23, 2011 Contractor: Philip FerraraClient: Rust, James M Amber | Completion date: November 29, 2011 | Permit id: Bp-11-02399 | Parcel: 06484016000 | |||||
SCORE 88 Date: June 9, 2011 Contractor: Philip FerraraClient: Lane & Lane Trustees | Completion date: February 10, 2012 | Permit id: Bp-11-02865 | Parcel: 06014001065 | |||||
SCORE 88 Date: June 16, 2011 Contractor: Philip FerraraClient: Cook, Christine P | Completion date: January 25, 2012 | Permit id: Bp-11-03002 | Parcel: 10131000000 | |||||
SCORE 88 Date: June 16, 2011 Contractor: Philip FerraraClient: Roby Derossett | Completion date: January 11, 2012 | Permit id: Bp-11-03001 | Parcel: 06677100035 | |||||
SCORE 88 Date: August 3, 2011 Contractor: Philip FerraraClient: Swanson, Bert E | Completion date: February 29, 2012 | Permit id: Bp-11-04006 | Parcel: 06383031014 | |||||
SCORE 88 Date: September 8, 2011 Contractor: Philip FerraraClient: Smith, H H Mary | Completion date: December 2, 2011 | Permit id: Bp-11-04689 | Parcel: 06487006000 | |||||
SCORE 88 Date: September 19, 2011 Contractor: Philip FerraraClient: Sanguine & Sanguine | Completion date: May 18, 2012 | Permit id: Bp-11-04830 | Parcel: 06680103090 | |||||
SCORE 88 Date: September 27, 2011 Contractor: Philip FerraraClient: Messal, Paul C Jennifer A | Completion date: February 29, 2012 | Permit id: Bp-11-04970 | Parcel: 06017041008 | |||||
SCORE 88 Date: October 11, 2011 Contractor: Philip FerraraClient: Ccmc Gainesville Holdings Llc | Completion date: March 16, 2012 | Permit id: Bp-11-05251 | Parcel: 13177000000 | |||||
SCORE 88 Date: October 19, 2011 Contractor: Philip FerraraClient: Dowst, Joni | Completion date: January 25, 2012 | Permit id: Bp-11-05471 | Parcel: 10823015000 | |||||
SCORE 88 Date: October 31, 2011 Contractor: Philip FerraraClient: Oakbrook Walk Ltd | Completion date: May 4, 2012 | Permit id: Bp-11-05614 | Parcel: 15633001000 | |||||
SCORE 88 Date: December 29, 2011 Contractor: Philip FerraraClient: Humphreys & Mack-Humphreys H W | Completion date: May 4, 2012 | Permit id: Bp-11-06512 | Parcel: 09947005000 | |||||
SCORE 88 Date: January 4, 2012 Contractor: Philip FerraraClient: Protected Owner Information | Completion date: August 28, 2012 | Permit id: Bp-12-00034 | Parcel: 06023040052 | |||||
SCORE 88 Date: March 19, 2012 Contractor: Philip FerraraClient: Weatherby, Betty Jane | Completion date: September 21, 2012 | Permit id: Bp-12-01286 | Parcel: 08055030000 | |||||
SCORE 88 Date: March 19, 2012 Contractor: Philip FerraraClient: Doxa Dance Studio Inc | Completion date: September 21, 2012 | Permit id: Bp-12-01280 | Parcel: 06107302004 | |||||
SCORE 88 Date: June 14, 2012 Contractor: Philip FerraraClient: Mehta, Raj | Completion date: March 22, 2013 | Permit id: Bp-12-02809 | Parcel: 07295074000 | |||||
SCORE 88 Date: June 18, 2012 Contractor: Philip FerraraClient: Eunice & Tucker | Completion date: December 7, 2012 | Permit id: Bp-12-02840 | Parcel: 06072010014 | |||||
SCORE 88 Date: July 11, 2012 Contractor: Philip FerraraClient: Mazzeo, George C Roberta J | Completion date: January 8, 2013 | Permit id: Bp-12-03265 | Parcel: 06415010020 | |||||
SCORE 88 Date: August 1, 2012 Contractor: Philip FerraraClient: Barauskas, Aleksas A Life Estate | Completion date: December 19, 2012 | Permit id: Bp-12-03675 | Parcel: 06500112000 | |||||
SCORE 88 Date: August 16, 2012 Contractor: Philip FerraraClient: Sanguine, Michael Scott | Completion date: February 12, 2013 | Permit id: Bp-12-03911 | Parcel: 09003003183 | |||||
SCORE 88 Date: August 22, 2012 Contractor: Philip FerraraClient: Baysinger & Baysinger | Completion date: February 15, 2013 | Permit id: Bp-12-04013 | Parcel: 06765090903 | |||||
SCORE 88 Date: August 27, 2012 Contractor: Philip FerraraClient: Mccants, Thomas J Iii Patricia S | Completion date: February 8, 2013 | Permit id: Bp-12-04083 | Parcel: 12707000000 | |||||
SCORE 88 Date: October 2, 2012 Contractor: Philip FerraraClient: Lloyd Clarkes Racquet Shoppe, Inc | Completion date: March 29, 2013 | Permit id: Bp-12-04815 | Parcel: 09246011000 | |||||
SCORE 88 Date: October 22, 2012 Contractor: Philip FerraraClient: Blackburn, Charles E Jennifer L | Completion date: April 2, 2013 | Permit id: Bp-12-05196 | Parcel: 06655115807 | |||||
SCORE 88 Date: October 29, 2012 Contractor: Philip FerraraClient: Roberts, Twyla J Dmd Pa | Completion date: April 2, 2013 | Permit id: Bp-12-05334 | Parcel: 06110002002 | |||||
SCORE 88 Date: October 29, 2012 Contractor: Philip FerraraClient: Rbc Bank (usa) | Completion date: April 2, 2013 | Permit id: Bp-12-05336 | Parcel: 06053090008 | |||||
SCORE 88 Date: November 20, 2012 Contractor: Philip FerraraClient: Dudash, James Julie | Completion date: May 16, 2013 | Permit id: Bp-12-05705 | Parcel: 14848213000 | |||||
SCORE 88 Date: January 23, 2013 Contractor: Philip FerraraClient: Carter, Edward Scott Kate | Completion date: June 28, 2013 | Permit id: Bp-13-00401 | Parcel: 06020010014 | |||||
SCORE 88 Date: February 7, 2013 Contractor: Philip FerraraClient: Bodendorf, Hannelore | Completion date: July 18, 2013 | Permit id: Bp-13-00740 | Parcel: 06388042000 | |||||
SCORE 88 Date: February 20, 2013 Contractor: Philip FerraraClient: Carey, Jane Anne | Completion date: July 29, 2013 | Permit id: Bp-13-01013 | Parcel: 10574010000 | |||||
SCORE 88 Date: February 20, 2013 Contractor: Philip FerraraClient: Hall, Jason C | Completion date: July 29, 2013 | Permit id: Bp-13-01014 | Parcel: 06742008001 | |||||
SCORE 88 Date: April 1, 2013 Contractor: Philip FerraraClient: Rbc Bank (usa) | Completion date: April 2, 2013 | Permit id: Bp-13-01869 | Parcel: 06053090008 | |||||
SCORE 88 Date: April 1, 2013 Contractor: Philip FerraraClient: Marks, R G Cynthia | Completion date: September 26, 2013 | Permit id: Bp-13-01886 | Parcel: 09003005031 | |||||
SCORE 88 Date: April 4, 2013 Contractor: Philip FerraraClient: Hughes Inc | Completion date: October 4, 2013 | Permit id: Bp-13-01950 | Parcel: 08240000000 | |||||
SCORE 88 Date: April 10, 2013 Contractor: Philip FerraraClient: Bugos & Bugos Co-Trustees | Completion date: September 11, 2013 | Permit id: Bp-13-02080 | Parcel: 06015200004 | |||||
SCORE 88 Date: April 15, 2013 Contractor: Philip FerraraClient: Myers, G H Jane | Completion date: October 29, 2013 | Permit id: Bp-13-02168 | Parcel: 10310000000 | |||||
SCORE 88 Date: April 23, 2013 Contractor: Philip FerraraClient: Davis Family Enterprises Llc | Completion date: October 15, 2013 | Permit id: Bp-13-02354 | Parcel: 08198018000 | |||||
SCORE 88 Date: April 23, 2013 Contractor: Philip FerraraClient: Hildebrant, John Lauren | Completion date: October 16, 2013 | Permit id: Bp-13-02355 | Parcel: 06410031000 | |||||
SCORE 88 Date: April 23, 2013 Contractor: Philip FerraraClient: Derrico, D J Karen M | Completion date: October 16, 2013 | Permit id: Bp-13-02381 | Parcel: 06489002000 | |||||
SCORE 88 Date: April 30, 2013 Contractor: Philip FerraraClient: Vyas, Mukesh | Completion date: October 18, 2013 | Permit id: Bp-13-02524 | Parcel: 07297010108 | |||||
SCORE 88 Date: May 14, 2013 Contractor: Philip FerraraClient: J G B Enterprises Inc | Completion date: October 8, 2013 | Permit id: Bp-13-02816 | Parcel: 06579054043 | |||||
SCORE 88 Date: May 23, 2013 Contractor: Philip FerraraClient: Allen & Vandersys | Completion date: October 18, 2013 | Permit id: Bp-13-03021 | Parcel: 07284400302 | |||||
SCORE 88 Date: May 28, 2013 Contractor: Philip FerraraClient: Isastia-Henriquez, Isabella V | Completion date: October 28, 2013 | Permit id: Bp-13-03061 | Parcel: 08992032033 | |||||
SCORE 88 Date: May 28, 2013 Contractor: Philip FerraraClient: Blackburn, Charles E Jennifer L | Completion date: October 28, 2013 | Permit id: Bp-13-03062 | Parcel: 06735010053 | |||||
SCORE 88 Date: June 6, 2013 Contractor: Philip FerraraClient: Sellman, Richard L Rebecca A | Completion date: October 31, 2013 | Permit id: Bp-13-03258 | Parcel: 06095004012 | |||||
SCORE 88 Date: June 10, 2013 Contractor: Philip FerraraClient: Office Solutions Of, Gainesville 2 Llc | Completion date: October 29, 2013 | Permit id: Bp-13-03294 | Parcel: 06110003003 | |||||
SCORE 88 Date: July 22, 2013 Contractor: Philip FerraraClient: Smith, Victor R Ii Rachael K | Completion date: October 11, 2013 | Permit id: Bp-13-04176 | Parcel: 07933010000 | |||||
SCORE 88 Date: August 19, 2013 Contractor: Philip FerraraClient: Kerley, Avery James Donna Marie | Completion date: October 18, 2013 | Permit id: Bp-13-04772 | Parcel: 06549010000 | |||||
SCORE 88 Date: December 5, 2011 Contractor: Philip FerraraClient: Frank Mcnamara | Client Address: 8-14 Clintonville Street Queens Ny 11357 | Client Phone: (718) 747-2196 | Permit status: Initial | Permit id: 420483051 | |||||
SCORE 88 Date: December 5, 2011 Contractor: Philip FerraraClient: Frank Mcnamara | Client Address: 8-14 Clintonville Street Queens Ny 11357 | Client Phone: (718) 747-2196 | Permit status: Initial | Permit id: 420483051 | |||||
SCORE 88 Date: December 5, 2011 Contractor: Philip FerraraClient: Frank Mcnamara | Client Address: 8-14 Clintonville Street Queens Ny 11357 | Client Phone: (718) 747-2196 | Permit status: Initial | Permit id: 420483051 |