SCORE 82 3 Tingey Street Se Washington Dc Work will include the installation of a new dc water 72 inch tunnel along tingey street se from 2nd street to 5 1/2 street including the following work within public space: 16 ft by 28 ft 36 ft deep launching shaft at tingey street between new jersey avenue and 3rd street ground improvements by jet grouting at the intersection of 4th & tingey street, se 72" tunnel below tingey street between 2nd street and 4th steet se work that will be completed in space that is not dedicated public space: construction of a manhole on tingey street east of 4th street including a 16 ft by 16 ft 33 ft deep shaft csombined sewer overflow 013 diversion chamber including a 28 ft by 24 ft, 24 ft deep shaft on 4th street south of tingey street Date: October 31, 2012 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Paving; curb & gutter | Permit status: Cancel/withdrawn | Expiration date: December 13, 2013 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc Construct dc clean rivers div. B: tingey street diversion sewer from nj ave se to 5 1/2 st se including cso-013 & cso-014 diversion chambers and 72-inch tunnel. Public space from 2 to 4 tingey street se, then gsa owned property. Date: November 9, 2012 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Paving; roadway | Permit status: Cancel/withdrawn | Expiration date: December 24, 2013 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc 72" tunnel project between 201 tingey streeet se & 5 1/2 st se. Between 201 tingey and the intersection of 4th st se is within dedicated public space. Work in public space includes an excavation for the tunnel launch, permeation (low presssure) grouting, and associated utility relocation work. Project also includes a diversion chamber for cso-013 and a manhole in non-dedicated public space as shown on the plans, and a diversion chamber for cso-014 in gsa controlled space. Date: December 11, 2012 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Paving; roadway(s), paving; sidewalk(s), excavation; repair water main line, excavation; vault(s) lxw, mega projects; dc water combined sewer proj | Permit status: Cancel/withdrawn | Expiration date: December 31, 2013 | |||||
SCORE 82 401 Tingey Street Se Washington Dc Complete work in gsa owned, forest city owned property previously reviewed and approved under tops permit 77692 Date: February 12, 2013 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Mega projects; dc water combined sewer proj | Permit status: Cancel/withdrawn | Expiration date: August 31, 2013 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc Previously submitted and reviewed under tops permit #77692, permit withdrawl after us dot traffic objections. Same work as previously submitted for dc clean rivers div. B except tunnel launch shaft has been revised to provide 2 lanes of traffic on tingey street between new jersey avenue and 3rd street. Work includes launch shaft at 2nd and tingey, work within the intersection of 4th and tingey for ground improvement. Space east of 4th street and south of tingey street is gsa property: not dc public space. 72" tunnel project between 201 tingey streeet se & 5 1/2 st se. Between 201 tingey and the intersection of 4th st se is within dedicated public space. Date: March 12, 2013 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Mega projects; dc water combined sewer proj, paving; roadway(s), paving; sidewalk(s), excavation; repair water main line, excavation; vault(s) lxw | Permit status: Permit expired | Expiration date: March 17, 2014 | Permit id: Pa80354 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc Construct dc clean rivers div. B: tingey street diversion sewer from nj ave se to 5 1/2 st se including cso-013 & cso-014 diversion chambers and 72-inch tunnel. Public space from 2 to 4 tingey street se, then gsa owned property. Date: November 9, 2012 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Paving; roadway | Permit status: Cancel/withdrawn | Expiration date: December 24, 2013 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc 72" tunnel project between 201 tingey streeet se & 5 1/2 st se. Between 201 tingey and the intersection of 4th st se is within dedicated public space. Work in public space includes an excavation for the tunnel launch, permeation (low presssure) grouting, and associated utility relocation work. Project also includes a diversion chamber for cso-013 and a manhole in non-dedicated public space as shown on the plans, and a diversion chamber for cso-014 in gsa controlled space. Date: December 11, 2012 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Paving; roadway(s), paving; sidewalk(s), excavation; repair water main line, excavation; vault(s) lxw, mega projects; dc water combined sewer proj | Permit status: Cancel/withdrawn | Expiration date: December 31, 2013 | |||||
SCORE 82 3 Tingey Street Se Washington Dc Work will include the installation of a new dc water 72 inch tunnel along tingey street se from 2nd street to 5 1 2 street including the following work within public space: 16 ft by 28 ft 36 ft deep launching shaft at tingey street between new jersey avenue and 3rd street ground improvements by jet grouting at the intersection of 4th & tingey street, se 72" tunnel below tingey street between 2nd street and 4th steet se work that will be completed in space that is not dedicated public space: construction of a manhole on tingey street east of 4th street including a 16 ft by 16 ft 33 ft deep shaft csombined sewer overflow 013 diversion chamber including a 28 ft by 24 ft, 24 ft deep shaft on 4th street south of tingey street Date: October 31, 2012 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Paving; curb & gutter | Permit status: Cancel/withdrawn | Expiration date: December 13, 2013 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc Construct dc clean rivers div. B: tingey street diversion sewer from nj ave se to 5 1 2 st se including cso-013 & cso-014 diversion chambers and 72-inch tunnel. Public space from 2 to 4 tingey street se, then gsa owned property. Date: November 9, 2012 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Paving; roadway | Permit status: Cancel/withdrawn | Expiration date: December 24, 2013 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc 72" tunnel project between 201 tingey streeet se & 5 1 2 st se. Between 201 tingey and the intersection of 4th st se is within dedicated public space. Work in public space includes an excavation for the tunnel launch, permeation (low presssure) grouting, and associated utility relocation work. Project also includes a diversion chamber for cso-013 and a manhole in non-dedicated public space as shown on the plans, and a diversion chamber for cso-014 in gsa controlled space. Date: December 11, 2012 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Paving; roadway(s), paving; sidewalk(s), excavation; repair water main line, excavation; vault(s) lxw, mega projects; dc water combined sewer proj | Permit status: Cancel/withdrawn | Expiration date: December 31, 2013 | |||||
SCORE 82 Contractor: Northeast Remsco Construction Incorporated Permit status: 3 | Expiration date: August 31, 2013 | Permit id: 0 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc Paving; roadway(s), paving; sidewalk(s), excavation; repair water main line, excavation; vault(s) lxw, mega projects; dc water combined sewer proj Contractor: Northeast Remsco Construction Incorporated Permit status: 3 | Expiration date: December 31, 2013 | Permit id: 0 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc Paving; roadway(s), paving; sidewalk(s), excavation; vault(s) lxw, excavation; repair water main line, occupancy; staging area(s), occupancy; mobile crane(s), occupancy; parking meter, occupancy; temp construction fence Contractor: Northeast Remsco Construction Incorporated Permit status: 3 | Expiration date: December 24, 2013 | Permit id: 0 | |||||
SCORE 82 3 Tingey Street Se Washington Dc Paving; curb & gutter(s), paving; roadway(s), excavation; manhole installation, excavation; monitoring well (each addl), excavation; monitoring well (single), excavation; telecom ml conduits (trench), excavation; water ml (trench), mega projects; dc water combined sewer proj, paving; sidewalk(s), excavation; sewer ml (trench) Contractor: Northeast Remsco Construction Incorporated Permit status: 3 | Expiration date: December 13, 2013 | Permit id: 0 | |||||
SCORE 82 3 Tingey Street Se Washington Dc Work will include the installation of a new dc water 72 inch tunnel along tingey street se from 2nd street to 5 1 2 street including the following work within public space: 16 ft by 28 ft 36 ft deep launching shaft at tingey street between new jersey avenue and 3rd street ground improvements by jet grouting at the intersection of 4th & tingey street, se 72" tunnel below tingey street between 2nd street and 4th steet se work that will be completed in space that is not dedicated public space: construction of a manhole on tingey street east of 4th street including a 16 ft by 16 ft 33 ft deep shaft csombined sewer overflow 013 diversion chamber including a 28 ft by 24 ft, 24 ft deep shaft on 4th street south of tingey street Contractor: Northeast Remsco Construction Incorporated Permit status: Cancel/withdrawn | Expiration date: December 13, 2013 | Permit id: 0 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc Construct dc clean rivers div. B: tingey street diversion sewer from nj ave se to 5 1 2 st se including cso-013 & cso-014 diversion chambers and 72-inch tunnel. Public space from 2 to 4 tingey street se, then gsa owned property. Contractor: Northeast Remsco Construction Incorporated Permit status: Cancel/withdrawn | Expiration date: December 24, 2013 | Permit id: 0 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc 72" tunnel project between 201 tingey streeet se & 5 1 2 st se. Between 201 tingey and the intersection of 4th st se is within dedicated public space. Work in public space includes an excavation for the tunnel launch, permeation (low presssure) grouting, and associated utility relocation work. Project also includes a diversion chamber for cso-013 and a manhole in non-dedicated public space as shown on the plans, and a diversion chamber for cso-014 in gsa controlled space. Contractor: Northeast Remsco Construction Incorporated Permit status: Cancel/withdrawn | Expiration date: December 31, 2013 | Permit id: 0 | |||||
SCORE 82 401 Tingey Street Se Washington Dc Complete work in gsa owned, forest city owned property previously reviewed and approved under tops permit 77692 Contractor: Northeast Remsco Construction Incorporated Permit status: Cancel/withdrawn | Expiration date: August 31, 2013 | Permit id: 0 | |||||
SCORE 82 3 Tingey Street Se Washington Dc Paving; curb & gutter(s), paving; roadway(s), excavation; manhole installation, excavation; monitoring well (each addl), excavation; monitoring well (single), excavation; telecom ml conduits (trench), excavation; water ml (trench), mega projects; dc water combined sewer proj, paving; sidewalk(s), excavation; sewer ml (trench) Contractor: Northeast Remsco Construction Incorporated Permit status: 3 | Expiration date: December 13, 2013 | Permit id: 0 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc Paving; roadway(s), paving; sidewalk(s), excavation; vault(s) lxw, excavation; repair water main line, occupancy; staging area(s), occupancy; mobile crane(s), occupancy; parking meter, occupancy; temp construction fence Contractor: Northeast Remsco Construction Incorporated Permit status: 3 | Expiration date: December 24, 2013 | Permit id: 0 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc Paving; roadway(s), paving; sidewalk(s), excavation; repair water main line, excavation; vault(s) lxw, mega projects; dc water combined sewer proj Contractor: Northeast Remsco Construction Incorporated Permit status: 3 | Expiration date: December 31, 2013 | Permit id: 0 | |||||
SCORE 82 Contractor: Northeast Remsco Construction Incorporated Permit status: 3 | Expiration date: August 31, 2013 | Permit id: 0 | |||||
SCORE 82 3 Tingey Street Se Washington Dc Work will include the installation of a new dc water 72 inch tunnel along tingey street se from 2nd street to 5 1 2 street including the following work within public space: 16 ft by 28 ft 36 ft deep launching shaft at tingey street between new jersey avenue and 3rd street ground improvements by jet grouting at the intersection of 4th & tingey street, se 72" tunnel below tingey street between 2nd street and 4th steet se work that will be completed in space that is not dedicated public space: construction of a manhole on tingey street east of 4th street including a 16 ft by 16 ft 33 ft deep shaft csombined sewer overflow 013 diversion chamber including a 28 ft by 24 ft, 24 ft deep shaft on 4th street south of tingey street Contractor: Northeast Remsco Construction Incorporated Permit status: Cancel/withdrawn | Expiration date: December 13, 2013 | Permit id: 0 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc Construct dc clean rivers div. B: tingey street diversion sewer from nj ave se to 5 1 2 st se including cso-013 & cso-014 diversion chambers and 72-inch tunnel. Public space from 2 to 4 tingey street se, then gsa owned property. Contractor: Northeast Remsco Construction Incorporated Permit status: Cancel/withdrawn | Expiration date: December 24, 2013 | Permit id: 0 | |||||
SCORE 82 201 Tingey Street Se Washington Dc Water line relocation associated with dc water tingey street diversion sewer previously reviewed under tops #77692 Date: February 5, 2013 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Excavation; repair water main line | Permit status: Permit expired | Expiration date: February 18, 2013 | Permit id: Pa79180 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc Previously submitted and reviewed under tops permit #77692, permit withdrawl after us dot traffic objections. Same work as previously submitted for dc clean rivers div. B except tunnel launch shaft has been revised to provide 2 lanes of traffic on tingey street between new jersey avenue and 3rd street. Work includes launch shaft at 2nd and tingey, work within the intersection of 4th and tingey for ground improvement. Space east of 4th street and south of tingey street is gsa property: not dc public space. 72" tunnel project between 201 tingey streeet se & 5 1/2 st se. Between 201 tingey and the intersection of 4th st se is within dedicated public space. Date: March 12, 2013 Contractor: Northeast Remsco Construction Incorporated Client: Dc Water And Sewer Authority Dc Clean Rivers Project | Permit type: Mega projects; dc water combined sewer proj, paving; roadway(s), paving; sidewalk(s), excavation; repair water main line, excavation; vault(s) lxw | Permit status: Permit expired | Expiration date: March 17, 2014 | Permit id: Pa80354 | |||||
SCORE 82 2 299 Block Of Tingey Street Se Washington Dc 72" tunnel project between 201 tingey streeet se & 5 1 2 st se. Between 201 tingey and the intersection of 4th st se is within dedicated public space. Work in public space includes an excavation for the tunnel launch, permeation (low presssure) grouting, and associated utility relocation work. Project also includes a diversion chamber for cso-013 and a manhole in non-dedicated public space as shown on the plans, and a diversion chamber for cso-014 in gsa controlled space. Contractor: Northeast Remsco Construction Incorporated Permit status: Cancel/withdrawn | Expiration date: December 31, 2013 | Permit id: 0 | |||||