SCORE

NIC PATTERSON DCCR PROJECT AECOM

ABOUT NIC PATTERSON DCCR PROJECT AECOM

Nic Patterson Dccr Project Aecom specializes in:

Nic Patterson Dccr Project Aecom offers services:

Based on the information received from , associated with Nic Patterson Dccr Project Aecom over the past .

If you are considering hiring Nic Patterson Dccr Project Aecom for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Nic Patterson Dccr Project Aecom has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
59
27 F St Nw, Washington, Dc 20566
Dc clean rivers proposes to drill twelve geotechnical borings, inc-1, inc-2, inc-3, bx-1, bx-2, bx-3, bx-4, bx-5, pz-1, pz-2, ow-1, ow-2, located in the parking lot and green space south of the kennedy center and north of i-66. The borings will be 6 inches in diameter and range between 67 and 82 feet in depth, drilled by mud rotary methods. Temporary casing will be used to install inclonometers, borehole extensometers and vibrating wire piezometers. Permanent casing will be socketed and grouted in rock before proceeding with drilling. Temporary casing will be set before proceeding with drilling. All drilling generated wastes will be drummed, and tested for proper disposal. All borings will be protected from surface water drainage and the vertical migration of contaminants and other materials down the borehole.
Date:  April 7, 2016

Client: Tom Whitaker- Kennedy Center | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600141
2016/04/0705927 F St Nw, Washington, Dc 20566Nic Patterson Dccr Project Aecom
SCORE
59
27 F St Nw, Washington, Dc 20566
Dc clean rivers project proposes to drill 1 secant piles, identified as s-1 through s-130, to support excavation of the cso-21 diversion chamber and drop shaft located in the parking lot and green space south of the kennedy center and north of i-66. The secant piles will be inches in diameter 67 feet deep and drilled by auger methods. Temporary steel casing will be advanced to top of rock and grouted before continued drilling. See attached work plan and schematics for additional information. All drilling generated waste will be contained: solids and liquids, tested and properly disposed. The boring will be covered and protected from surface water drainage and the vertical migration of contaminants and other materials during construction.
Date:  April 25, 2016

Client: Tom Whitaker Kenendy Center | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1600140
2016/04/2505927 F St Nw, Washington, Dc 20566Nic Patterson Dccr Project Aecom
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.