QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 3 Western Av Brighton Ma 02135 The star market brighton location 3 western avenue is proposed to have updates and renovation of the existing space . The updates consist of storewide updates demo of existing brueggers bagel shop (which is part of the interior of the supermarket) exterior faade repairs and updates and repairs to the existing interior pharmacy. The intended project timeline is january 2017 april 2017. The updates are as follows 1. The scope of storewide updates includes the following: a. The removal and installation of refrigerated food cases. New drain lines will need to be installed to any new or relocated cases. While any demolished cases must be removed and properly disposed of. As a result of this work the flooring will require infill and repairs. Additionally the new cases may require new refrigerant lines to the roof and repairs to the roof as needed. B. The removal of existing lighting and replacement with new fixtures c. Repairs and updates to existing hvac supply return air system d. Repair Client: Harvard Re Allston Inc | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Comm | Permit id: Sf669352 | Parcel: 2200863010 | |||||
SCORE 59 3 Western Av Brighton Ma The star market brighton location 3 western avenue is proposed to have updates and renovation of the existing space . The updates consist of storewide updates demo of existing brueggers bagel shop (which is part of the interior of the supermarket) exterior faade repairs and updates and repairs to the existing interior pharmacy. The intended project timeline is january 2017 april 2017. The updates are as follows 1. The scope of storewide updates includes the following: a. The removal and installation of refrigerated food cases. New drain lines will need to be installed to any new or relocated cases. While any demolished cases must be removed and properly disposed of. As a result of this work the flooring will require infill and repairs. Additionally the new cases may require new refrigerant lines to the roof and repairs to the roof as needed. B. The removal of existing lighting and replacement with new fixtures c. Repairs and updates to existing hvac supply return air system d. Repair Client: Harvard Re Allston Inc | Permit type: Short form bldg permit | Expiration date: July 6, 2017 | Current use: Comm | Permit id: Sf669352 | Parcel: 2200862000 |