QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 62 7300 Kedzie Ave Chicago Il Install one gea 249 ton chiller, self contained, water cooled, r717, located in the existing machine room. Install associated brine, glycol, and water piping. Date: June 14, 2013 Contractor: Mondelez InternationalPermit type: Permit - easy permit | Permit id: 100495523 | |||||
SCORE 62 73 Kedzie Ave Chicago Il Install one gea 249 ton chiller, self contained, water cooled, r717, located in the existing machine room. Install associated brine, glycol, and water piping. Date: June 14, 2013 Contractor: Mondelez InternationalPermit type: Permit - easy permit process | Permit id: 100495523 | |||||
SCORE 62 73 Kedzie Ave Chicago Il Interior renovations to second floor of existing manufacturing building to include cafeteria, locker room, toilet room and conference room renovations as well as structural reinforcement for (1) new operable partition. No change in use. Certified corrections- - subject to field inspections & audit Permit type: Permit - renovation/alteration | Permit id: 100699481 |