Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 New rooftop pv system for an existing single family dwelling. Inverte Date: June 11, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-139 | |||||
SCORE 82 Pv1 single family dwelling total system size 5kw using 25 modules. Cen Date: July 31, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-203 | |||||
SCORE 82 Pv1 for single family dwelling. Total system size: 11. 22 kw. 44 module Date: August 13, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-151 | |||||
SCORE 82 Pv1 plan check for pv single family. 8. 2kw system. 33 panels and 1 inv Date: August 13, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-157 | |||||
SCORE 82 Pv1 single family dwelling. Total system size 3. 8 kw using 18 modules Date: September 20, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-222 | |||||
SCORE 82 Pv1 transformerless system. 3 strings for 1 inverter. 4. 2kwac Date: October 11, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-260 | |||||
SCORE 82 Pv1 transformerless system. Using solar optimizers. Total sysyem size Date: October 22, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288 | |||||
SCORE 82 Pv1 transformerless system. Total system size 11. 73. 46 modules and 2 Date: October 22, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288 | |||||
SCORE 82 Pv2 commercial installation. Total system size 33kw. 132 modules and 3 Date: October 30, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-20000-295 | |||||
SCORE 82 Pv1 central inverter standard plan. Date: December 17, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350 | |||||
SCORE 82 Pv1 transformerless inverter. Using solar optimizers. Total system siz Date: December 17, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328 | |||||
SCORE 82 Pv1 central inverter system with four strings. Total system size 9. 36k Date: December 17, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328 | |||||
SCORE 82 New rooftop pv system using dc-dc converters. System is ungrounded. Date: December 19, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345 | |||||
SCORE 82 Electrical Date: December 19, 2013 Contractor: Moein Lak Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350 | |||||
SCORE 82 Pv1 transformerless system with optimizers. Total system size 4. 16kw. Date: December 31, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345 | |||||
SCORE 82 New rooftop pv system for an existing sfr. System uses dc-dc converte Date: December 31, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345 | |||||
SCORE 82 New rooftop pv system using dc-dc converters for an existing single fa Date: December 31, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345 | |||||
SCORE 82 New 8. 5kw rooftop pv system for an existing single family dwelling. S Date: January 10, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007 | |||||
SCORE 82 New rooftop pv system with dc/dc converters. System is ungrounded. Date: January 22, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007 | |||||
SCORE 82 Pv1 transformerless system. Using optimizers. Total system size 5. 0kwa Date: January 22, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007 | |||||
SCORE 82 Pv1, roof-mounted solar installation, interconnecting with main servic Date: February 12, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-040 | |||||
SCORE 82 Pv1 transformerless system . Total system size 5. 0kwac wtih solar optim Date: March 21, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062 | |||||
SCORE 82 Pv1 transformerless system. Total system size 6. 0kwac Date: March 21, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068 | |||||
SCORE 82 Pv1. Roof mounted solar system. Standard transformer inverter. System Date: March 26, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080 | |||||
SCORE 82 Pv1. Roofmounted solar system. Transformerless standard plan. System s Date: March 26, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080 | |||||
SCORE 82 Pv1 transformerless system. 38 modules and 2 inverter Date: April 3, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068 | |||||
SCORE 82 Roof pv system with system size 7. 28kw. Date: April 3, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068 | |||||
SCORE 82 Pv1 transformerless system. Total system size 12. 0kwac permit fee Date: April 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062 | |||||
SCORE 82 Electrical Date: April 21, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-104 | |||||
SCORE 82 Pv1 roof mounted solar sysem 8. 32kw interconnect with main panel. (2) Date: May 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-124 | |||||
SCORE 82 Changes from previously approved plans. Change include one additional Date: May 21, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20001-040 | |||||
SCORE 82 Pv1. Roof mounted solar system. Standard transformerless central inve Date: May 22, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-115 | |||||
SCORE 82 Pv1. Install 7. 8 kw roof-mounted utility-interactive pv system. Tran Date: May 22, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-137 | |||||
SCORE 82 Pv1. Install 6. 88 kw roof-mounted, utility-interactive pv system. Tr Date: June 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Tra Date: June 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 Pv1 central transformerless inverter standard plan. Install roof-mount Date: June 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 Pv1 central transformerless inverter standard plan install roof-mounte Date: June 11, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 Pv1 install roof mounted pv system sized 7. 2kw interconnected with msp Date: June 19, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165 | |||||
SCORE 82 Pv1. Install 13. 52 kw roof-mounted, utility-interactive pv system. ( Date: July 8, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175 | |||||
SCORE 82 Pv1. Install 8. 32 kw roof-mounted, utility-interactive pv system. Tr Date: July 8, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175 | |||||
SCORE 82 Pv1. Install 6. 5 kw roof-mounted, utility-interactive pv system. Tra Date: July 8, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175 | |||||
SCORE 82 New roof mounted pv system with total system size 6kw . Date: July 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185 | |||||
SCORE 82 Pv1 install roof mounted solar array on sfd. System size: 3. 8kw (1) so Date: July 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185 | |||||
SCORE 82 10694 Somma Way Los Angeles Ca 90077 Pv1 for single family dwelling. Total system size: 11. 22 kw. 44 module Date: August 13, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-151 | |||||
SCORE 82 17054 Cantara St Los Angeles Ca 91406 Pv1. Install 6. 88 kw roof-mounted, utility-interactive pv system. Tr Date: June 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 3304 Bellevue Ave Los Angeles Ca 90026 Pv1 transformerless system. Using optimizers. Total system size 5. 0kwa Date: January 22, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007 | |||||
SCORE 82 4537 Tenango Dr Los Angeles Ca 91364 Pv1. Install 13. 52 kw roof-mounted, utility-interactive pv system. ( Date: July 8, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175 | |||||
SCORE 82 8938 Cadillac Ave Los Angeles Ca 90034 Pv1. Roofmounted solar system. Transformerless standard plan. System s Date: March 26, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080 | |||||
SCORE 82 18001 Terrafina St Los Angeles Ca 91344 Pv1 install roof mounted pv system sized 7. 2kw interconnected with msp Date: June 19, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165 | |||||
SCORE 82 3244 Greenfield Ave Los Angeles Ca 90034 Pv1. Roof mounted solar system. Standard transformer inverter. System Date: March 26, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080 | |||||
SCORE 82 16454 Knollwood Dr Los Angeles Ca 91344 Pv1 transformerless system. Total system size 11. 73. 46 modules and 2 Date: October 22, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288 | |||||
SCORE 82 Date: April 3, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068 | |||||
SCORE 82 7054 Tunney Ave Los Angeles Ca 91335 Pv1 single family dwelling total system size 5kw using 25 modules. Cen Date: July 31, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-203 | |||||
SCORE 82 6948 Tobias Ave Los Angeles Ca 91405 Changes from previously approved plans. Change include one additional Date: May 21, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20001-040 | |||||
SCORE 82 3245 Castle Heights Ave Los Angeles Ca 90034 Pv1. Roof mounted solar system. Standard transformerless central inve Date: May 22, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-115 | |||||
SCORE 82 7906 Melita Ave Los Angeles Ca 91605 New 8. 5kw rooftop pv system for an existing single family dwelling. S Date: January 10, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007 | |||||
SCORE 82 7412 Dorie Dr Los Angeles Ca 91304 Pv1 plan check for pv single family. 8. 2kw system. 33 panels and 1 inv Date: August 13, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-157 | |||||
SCORE 82 3304 Bellevue Ave Los Angeles Ca 90026 New rooftop pv system for an existing sfr. System uses dc-dc converte Date: December 31, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345 | |||||
SCORE 82 17734 Mayerling St Los Angeles Ca 91344 Pv1. Install 7. 8 kw roof-mounted utility-interactive pv system. Tran Date: May 22, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-137 | |||||
SCORE 82 12133 Bellando Ct Los Angeles Ca 91344 Pv1 roof mounted solar sysem 8. 32kw interconnect with main panel. (2) Date: May 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-124 | |||||
SCORE 82 Date: December 19, 2013 Contractor: Moein Lak Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350 | |||||
SCORE 82 109 Walnut Dr Los Angeles Ca 91040 Pv1 transformerless system. Total system size 12. 0kwac permit fee Date: April 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062 | |||||
SCORE 82 4811 Adele Ct Los Angeles Ca 91364 Pv1 transformerless system. Using solar optimizers. Total sysyem size Date: October 22, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288 | |||||
SCORE 82 Date: October 11, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-260 | |||||
SCORE 82 5909 Wilkinson Ave Los Angeles Ca 91607 Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Tra Date: June 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 Date: May 23, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-138 | |||||
SCORE 82 4038 Stone Canyon Ave Los Angeles Ca 91403 Pv1, roof-mounted solar installation, interconnecting with main servic Date: February 12, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-040 | |||||
SCORE 82 Date: April 3, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068 | |||||
SCORE 82 18942 Plummer St Los Angeles Ca 91324 Pv1 central transformerless inverter standard plan. Install roof-mount Date: June 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 6948 Tobias Ave Los Angeles Ca 91405 Pv1, roof-mounted solar installation, interconnecting with main servic Date: February 12, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-040 | |||||
SCORE 82 Date: April 21, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-104 | |||||
SCORE 82 12641 Presnell St Los Angeles Ca 90066 Pv1 central inverter system with four strings. Total system size 9. 36k Date: December 17, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328 | |||||
SCORE 82 6358 Nancy St Los Angeles Ca 90045 Pv1 transformerless system with optimizers. Total system size 4. 16kw. Date: December 31, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345 | |||||
SCORE 82 Date: December 17, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350 | |||||
SCORE 82 Date: April 21, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-104 | |||||
SCORE 82 Date: March 21, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068 | |||||
SCORE 82 7506 Summitrose St Los Angeles Ca 91042 Pv1 central transformerless inverter standard plan install roof-mounte Date: June 11, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 2987 Ingledale Ter Los Angeles Ca 90039 Pv1 single family dwelling. Total system size 3. 8 kw using 18 modules Date: September 20, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-222 | |||||
SCORE 82 29 Danalda Dr Los Angeles Ca 90064 New rooftop pv system for an existing single family dwelling. Inverte Date: June 11, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-139 | |||||
SCORE 82 2421 Nalin Dr Los Angeles Ca 90077 Pv1 transformerless system . Total system size 5. 0kwac wtih solar optim Date: March 21, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062 | |||||
SCORE 82 Date: July 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185 | |||||
SCORE 82 6611 Valjean Ave Los Angeles Ca 91406 Pv2 commercial installation. Total system size 33kw. 132 modules and 3 Date: October 30, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-20000-295 | |||||
SCORE 82 12522 Milbank St Los Angeles Ca 91604 Pv1 transformerless inverter. Using solar optimizers. Total system siz Date: December 17, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328 | |||||
SCORE 82 Date: May 23, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-137 | |||||
SCORE 82 9145 Balcom Ave Los Angeles Ca 91325 Pv1. Install 6. 5 kw roof-mounted, utility-interactive pv system. Tra Date: July 8, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175 | |||||
SCORE 82 11593 Kling St Los Angeles Ca 91602 Pv1. Install 8. 32 kw roof-mounted, utility-interactive pv system. Tr Date: July 8, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175 | |||||
SCORE 82 10601 Valjean Ave Los Angeles Ca 91344 Pv1 install roof mounted solar array on sfd. System size: 3. 8kw (1) so Date: July 9, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185 | |||||
SCORE 82 5152 Topanga Canyon Blvd Los Angeles Ca 91364 New rooftop pv system using dc-dc converters for an existing single fa Date: December 31, 2013 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345 | |||||
SCORE 82 5333 Ventura Canyon Ave Los Angeles Ca 91401 New rooftop pv system with dc/dc converters. System is ungrounded. Date: January 22, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007 | |||||
SCORE 82 3304 Bellevue Ave Los Angeles Ca 90026 San Diego Ca Pv1 transformerless system. Using optimizers. Total system size 5. 0kwa Date: January 22, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007 | |||||
SCORE 82 10694 Somma Way Los Angeles Ca 90077 San Diego Ca Pv1 for single family dwelling. Total system size: 11. 22 kw. 44 module Date: August 13, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-151 | |||||
SCORE 82 17054 Cantara St Los Angeles Ca 91406 San Diego Ca Pv1. Install 6. 88 kw roof-mounted, utility-interactive pv system. Tr Date: June 9, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 4038 Stone Canyon Ave Los Angeles Ca 91403 San Diego Ca Pv1, roof-mounted solar installation, interconnecting with main servic Date: February 12, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-040 | |||||
SCORE 82 Date: April 3, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068 | |||||
SCORE 82 18942 Plummer St Los Angeles Ca 91324 San Diego Ca Pv1 central transformerless inverter standard plan. Install roof-mount Date: June 9, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 6948 Tobias Ave Los Angeles Ca 91405 San Diego Ca Pv1, roof-mounted solar installation, interconnecting with main servic Date: February 12, 2014 Contractor: Moein Lak Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-040 | |||||
SCORE 82 Date: April 21, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-104 | |||||
SCORE 82 12641 Presnell St Los Angeles Ca 90066 San Diego Ca Pv1 central inverter system with four strings. Total system size 9. 36k Date: December 17, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328 | |||||
SCORE 82 6358 Nancy St Los Angeles Ca 90045 San Diego Ca Pv1 transformerless system with optimizers. Total system size 4. 16kw. Date: December 31, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345 | |||||
SCORE 82 Date: December 17, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350 | |||||
SCORE 82 Date: April 21, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-104 | |||||
SCORE 82 17816 Sidwell St Los Angeles Ca 91344 San Diego Ca Pv1 transformerless system. Total system size 6. 0kwac Date: March 21, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068 | |||||
SCORE 82 7506 Summitrose St Los Angeles Ca 91042 San Diego Ca Pv1 central transformerless inverter standard plan install roof-mounte Date: June 11, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 2987 Ingledale Ter Los Angeles Ca 90039 San Diego Ca Pv1 single family dwelling. Total system size 3. 8 kw using 18 modules Date: September 20, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-222 | |||||
SCORE 82 29 Danalda Dr Los Angeles Ca 90064 San Diego Ca New rooftop pv system for an existing single family dwelling. Inverte Date: June 11, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-139 | |||||
SCORE 82 2421 Nalin Dr Los Angeles Ca 90077 San Diego Ca Pv1 transformerless system . Total system size 5. 0kwac wtih solar optim Date: March 21, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062 | |||||
SCORE 82 5333 Ventura Canyon Ave Los Angeles Ca 91401 San Diego Ca New rooftop pv system with dc dc converters. System is ungrounded. Date: January 22, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007 | |||||
SCORE 82 11201 Ravenna Lane Los Angeles Ca 91326 San Diego Ca New roof mounted pv system with total system size 6kw . Date: July 9, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185 | |||||
SCORE 82 6611 Valjean Ave Los Angeles Ca 91406 San Diego Ca Pv2 commercial installation. Total system size 33kw. 132 modules and 3 Date: October 30, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: Commercial | Permit id: 13041-20000-295 | |||||
SCORE 82 12522 Milbank St Los Angeles Ca 91604 San Diego Ca Pv1 transformerless inverter. Using solar optimizers. Total system siz Date: December 17, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-328 | |||||
SCORE 82 Date: May 23, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-137 | |||||
SCORE 82 9145 Balcom Ave Los Angeles Ca 91325 San Diego Ca Pv1. Install 6. 5 kw roof-mounted, utility-interactive pv system. Tra Date: July 8, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175 | |||||
SCORE 82 11593 Kling St Los Angeles Ca 91602 San Diego Ca Pv1. Install 8. 32 kw roof-mounted, utility-interactive pv system. Tr Date: July 8, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175 | |||||
SCORE 82 10601 Valjean Ave Los Angeles Ca 91344 San Diego Ca Pv1 install roof mounted solar array on sfd. System size: 3. 8kw (1) so Date: July 9, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-185 | |||||
SCORE 82 4537 Tenango Dr Los Angeles Ca 91364 San Diego Ca Pv1. Install 13. 52 kw roof-mounted, utility-interactive pv system. ( Date: July 8, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-175 | |||||
SCORE 82 8938 Cadillac Ave Los Angeles Ca 90034 San Diego Ca Pv1. Roofmounted solar system. Transformerless standard plan. System s Date: March 26, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080 | |||||
SCORE 82 18001 Terrafina St Los Angeles Ca 91344 San Diego Ca Pv1 install roof mounted pv system sized 7. 2kw interconnected with msp Date: June 19, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165 | |||||
SCORE 82 3244 Greenfield Ave Los Angeles Ca 90034 San Diego Ca Pv1. Roof mounted solar system. Standard transformer inverter. System Date: March 26, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-10000-080 | |||||
SCORE 82 16454 Knollwood Dr Los Angeles Ca 91344 San Diego Ca Pv1 transformerless system. Total system size 11. 73. 46 modules and 2 Date: October 22, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288 | |||||
SCORE 82 5809 Melvin Ave Los Angeles Ca 91356 San Diego Ca Pv1 transformerless system. 38 modules and 2 inverter Date: April 3, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-068 | |||||
SCORE 82 7054 Tunney Ave Los Angeles Ca 91335 San Diego Ca Pv1 single family dwelling total system size 5kw using 25 modules. Cen Date: July 31, 2013 Contractor: Moein Lak Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-203 | |||||
SCORE 82 6948 Tobias Ave Los Angeles Ca 91405 San Diego Ca Changes from previously approved plans. Change include one additional Date: May 21, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20001-040 | |||||
SCORE 82 3245 Castle Heights Ave Los Angeles Ca 90034 San Diego Ca Pv1. Roof mounted solar system. Standard transformerless central inve Date: May 22, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-115 | |||||
SCORE 82 7906 Melita Ave Los Angeles Ca 91605 San Diego Ca New 8. 5kw rooftop pv system for an existing single family dwelling. S Date: January 10, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-007 | |||||
SCORE 82 7412 Dorie Dr Los Angeles Ca 91304 San Diego Ca Pv1 plan check for pv single family. 8. 2kw system. 33 panels and 1 inv Date: August 13, 2013 Contractor: Moein Lak Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-157 | |||||
SCORE 82 3304 Bellevue Ave Los Angeles Ca 90026 San Diego Ca New rooftop pv system for an existing sfr. System uses dc-dc converte Date: December 31, 2013 Contractor: Moein Lak Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345 | |||||
SCORE 82 17734 Mayerling St Los Angeles Ca 91344 San Diego Ca Pv1. Install 7. 8 kw roof-mounted utility-interactive pv system. Tran Date: May 22, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-137 | |||||
SCORE 82 12133 Bellando Ct Los Angeles Ca 91344 San Diego Ca Pv1 roof mounted solar sysem 8. 32kw interconnect with main panel. (2) Date: May 9, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-124 | |||||
SCORE 82 Date: December 19, 2013 Contractor: Moein Lak Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-350 | |||||
SCORE 82 109 Walnut Dr Los Angeles Ca 91040 San Diego Ca Pv1 transformerless system. Total system size 12. 0kwac permit fee Date: April 9, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-062 | |||||
SCORE 82 5152 Topanga Canyon Blvd Los Angeles Ca 91364 San Diego Ca New rooftop pv system using dc-dc converters for an existing single fa Date: December 19, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-345 | |||||
SCORE 82 4811 Adele Ct Los Angeles Ca 91364 San Diego Ca Pv1 transformerless system. Using solar optimizers. Total sysyem size Date: October 22, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-288 | |||||
SCORE 82 167 Rinaldi St Los Angeles Ca 91344 San Diego Ca Pv1 transformerless system. 3 strings for 1 inverter. 4. 2kwac Date: October 11, 2013 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 13041-20000-260 | |||||
SCORE 82 5909 Wilkinson Ave Los Angeles Ca 91607 San Diego Ca Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Tra Date: June 9, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-153 | |||||
SCORE 82 Date: May 23, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-138 | |||||
SCORE 82 Pv1 install roof mounted solar array on sfd. System size: 6kw central Date: June 20, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165 | |||||
SCORE 82 Pv1 single family dwelling. Total system size 6. 8kw ac using 2 central Date: July 16, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-191 | |||||
SCORE 82 Standard plan: 5. 72kw pv1 roof-mounted system with (22) rec solar 260p Date: July 18, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-194 | |||||
SCORE 82 Pv1 central transformerless inverter standard plan. Install roof-mount Date: July 25, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200 | |||||
SCORE 82 Standard plan: 7. 8kw roof-mounted system with (2) power one pvi-3. 0-ou Date: July 25, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200 | |||||
SCORE 82 Permit fee due to senate bill 1222 from 2012 14. 3kw pv1 roof-mount Date: August 4, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200 | |||||
SCORE 82 Pv1. Install 6. 24 kw roof-mounted, utility-interactive pv system. Ce Date: August 5, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 82 Pv1. Install 5. 46 kw roof-mounted, utility-interactive pv system. Ce Date: August 5, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 82 Pv1. Install 7. 8 kw roof-mounted, utility-interactive pv system. Cen Date: August 5, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 82 Pv1 install roof mounted pv system sized 5. 0kw interconnected with msp Date: August 7, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-213 | |||||
SCORE 82 Pv1. Install 9. 36 kw roof-mounted, utility-interactive pv system. Date: August 12, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-210 | |||||
SCORE 82 Pv1 central transformerless inverter standard plan install roof-mounte Date: August 15, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222 | |||||
SCORE 82 Pv1 central/string inverterter standard plan. Install roof-mounted sol Date: August 15, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222 | |||||
SCORE 82 13849 Eldridge Ave Los Angeles Ca 91342 Pv1. Install 4. 16 kw roof-mounted, utility-interactive pv system. Ce Date: August 20, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-226 | |||||
SCORE 82 Pv1. Install 7. 54 kw roof-mounted, utility-interactive pv system. Ce Date: August 20, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-226 | |||||
SCORE 82 Pv1 sfd. Total system size 5kw ac using transformerless inverters. Usi Date: August 22, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230 | |||||
SCORE 82 Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Cen Date: August 29, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-237 | |||||
SCORE 82 Electrical Date: August 29, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-232 | |||||
SCORE 82 Pv1 install roof-mounted solar array on sfd, interconnect with msp. Sy Date: September 16, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-242 | |||||
SCORE 82 Permit fee is due to senate bill sb-1222. Pv1 single family. Tot Date: October 6, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230 | |||||
SCORE 82 Pv1. Install 7. 28 kw dc roof-moutned, utility-interactive pv system. Date: October 16, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287 | |||||
SCORE 82 Pv1. Install 8. 84 kw roof-mounted, utility-interactive pv system. Ce Date: October 16, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287 | |||||
SCORE 82 19336 Vista Grande Way Los Angeles Ca 91326 Pv1 central transformerless inverter standard plan. Install roof-mount Date: August 12, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-218 | |||||
SCORE 82 Date: October 8, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-279 | |||||
SCORE 82 1433 Summitridge Dr Los Angeles Ca 90210 Permit fee due to senate bill 1222 from 2012 14. 3kw pv1 roof-mount Date: August 4, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200 | |||||
SCORE 82 4027 Rock Hampton Dr Los Angeles Ca 91356 Permit fee is due to senate bill sb-1222. Pv1 single family. Tot Date: October 6, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230 | |||||
SCORE 82 19801 Linnet St Los Angeles Ca 91364 Pv1. Install 9. 36 kw roof-mounted, utility-interactive pv system. Date: August 12, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-210 | |||||
SCORE 82 Date: October 10, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-281 | |||||
SCORE 82 16964 Paulette Pl Los Angeles Ca 91344 Pv1. Install 8. 84 kw roof-mounted, utility-interactive pv system. Ce Date: October 16, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287 | |||||
SCORE 82 11846 Garber St Los Angeles Ca 91342 Pv1. Install 5. 46 kw roof-mounted, utility-interactive pv system. Ce Date: August 5, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 82 17955 Calvert St Los Angeles Ca 91335 Pv1. Install 7. 8 kw roof-mounted, utility-interactive pv system. Cen Date: August 5, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 82 10464 Penrose St Los Angeles Ca 91352 Pv1 install roof-mounted solar array on sfd, interconnect with msp. Sy Date: September 16, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-242 | |||||
SCORE 82 89 Enfield Ave Los Angeles Ca 91325 Pv1 single family dwelling. Total system size 6. 8kw ac using 2 central Date: July 16, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-191 | |||||
SCORE 82 Date: October 8, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-279 | |||||
SCORE 82 3253 Malcolm Ave Los Angeles Ca 90034 Pv1 install roof mounted pv system sized 5. 0kw interconnected with msp Date: August 7, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-213 | |||||
SCORE 82 Date: October 15, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-285 | |||||
SCORE 82 Date: August 29, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-232 | |||||
SCORE 82 227 Covello St Los Angeles Ca 91307 Pv1 central transformerless inverter standard plan. Install roof-mount Date: July 25, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200 | |||||
SCORE 82 12813 League St Los Angeles Ca 91605 Standard plan: 5. 72kw pv1 roof-mounted system with (22) rec solar 260p Date: July 18, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-194 | |||||
SCORE 82 11852 Fellows Ave Los Angeles Ca 91340 Pv1 install roof mounted pv system sized 5. 0kw interconnected with msp Date: August 7, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-213 | |||||
SCORE 82 9958 Calvin Ave Los Angeles Ca 91324 Pv1. Install 7. 28 kw dc roof-moutned, utility-interactive pv system. Date: October 16, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287 | |||||
SCORE 82 Date: October 10, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-281 | |||||
SCORE 82 12245 Via Santa Barbara Los Angeles Ca 91342 Pv1 central transformerless inverter standard plan install roof-mounte Date: August 15, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222 | |||||
SCORE 82 10219 Melvin Ave Los Angeles Ca 91324 Pv1. Install 6. 24 kw roof-mounted, utility-interactive pv system. Ce Date: August 5, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 82 69 Bianca Ave Los Angeles Ca 91406 Standard plan: 7. 8kw roof-mounted system with (2) power one pvi-3. 0-ou Date: July 25, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200 | |||||
SCORE 82 3783 Wade St Los Angeles Ca 90066 Pv1 sfd. Total system size 5kw ac using transformerless inverters. Usi Date: August 22, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230 | |||||
SCORE 82 Permit type: Bldg-alter/repair | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14016-20000-153 | |||||
SCORE 82 70 Deveron Ridge Road Los Angeles Ca 91307 Pv1. Install 7. 54 kw roof-mounted, utility-interactive pv system. Ce Date: August 20, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-226 | |||||
SCORE 82 17201 Index St Los Angeles Ca 91344 Pv1. Install 7. 54 kw roof-mounted, utility-interactive pv system. Ce Date: October 16, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287 | |||||
SCORE 82 3343 Mountain View Ave Los Angeles Ca 90066 Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Cen Date: August 29, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-237 | |||||
SCORE 82 Date: October 15, 2014 Contractor: Moein Lak Permit status: Issued | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-286 | |||||
SCORE 82 4322 Cezanne Ave Los Angeles Ca 91364 Pv1 install roof mounted solar array on sfd. System size: 6kw central Date: June 20, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165 | |||||
SCORE 82 10051 Hillgrove Dr Los Angeles Ca 90210 Pv1. Install 7. 8 kw roof-mounted, utility-interactive pv system. Cen Date: August 29, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-237 | |||||
SCORE 82 5533 Allott Ave Los Angeles Ca 91401 Pv1 central/string inverterter standard plan. Install roof-mounted sol Date: August 15, 2014 Contractor: Moein Lak Permit type: Electrical | Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222 | |||||
SCORE 82 19336 Vista Grande Way Los Angeles Ca 91326 San Diego Ca Pv1 central transformerless inverter standard plan. Install roof-mount Date: August 12, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-218 | |||||
SCORE 82 10219 Melvin Ave Los Angeles Ca 91324 San Diego Ca Pv1. Install 6. 24 kw roof-mounted, utility-interactive pv system. Ce Date: August 5, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 82 69 Bianca Ave Los Angeles Ca 91406 San Diego Ca Standard plan: 7. 8kw roof-mounted system with (2) power one pvi-3. 0-ou Date: July 25, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200 | |||||
SCORE 82 3783 Wade St Los Angeles Ca 90066 San Diego Ca Pv1 sfd. Total system size 5kw ac using transformerless inverters. Usi Date: August 22, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230 | |||||
SCORE 82 Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14016-20000-153 | |||||
SCORE 82 70 Deveron Ridge Road Los Angeles Ca 91307 San Diego Ca Pv1. Install 7. 54 kw roof-mounted, utility-interactive pv system. Ce Date: August 20, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-226 | |||||
SCORE 82 17201 Index St Los Angeles Ca 91344 San Diego Ca Pv1. Install 7. 54 kw roof-mounted, utility-interactive pv system. Ce Date: October 16, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287 | |||||
SCORE 82 13849 Eldridge Ave Los Angeles Ca 91342 San Diego Ca Pv1. Install 4. 16 kw roof-mounted, utility-interactive pv system. Ce Date: August 20, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-226 | |||||
SCORE 82 3343 Mountain View Ave Los Angeles Ca 90066 San Diego Ca Pv1. Install 5. 2 kw roof-mounted, utility-interactive pv system. Cen Date: August 29, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-237 | |||||
SCORE 82 4322 Cezanne Ave Los Angeles Ca 91364 San Diego Ca Pv1 install roof mounted solar array on sfd. System size: 6kw central Date: June 20, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-165 | |||||
SCORE 82 10051 Hillgrove Dr Los Angeles Ca 90210 San Diego Ca Pv1. Install 7. 8 kw roof-mounted, utility-interactive pv system. Cen Date: August 29, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-237 | |||||
SCORE 82 Date: October 8, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-279 | |||||
SCORE 82 1433 Summitridge Dr Los Angeles Ca 90210 San Diego Ca Permit fee due to senate bill 1222 from 2012 14. 3kw pv1 roof-mount Date: August 4, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200 | |||||
SCORE 82 4027 Rock Hampton Dr Los Angeles Ca 91356 San Diego Ca Permit fee is due to senate bill sb-1222. Pv1 single family. Tot Date: October 6, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-230 | |||||
SCORE 82 19801 Linnet St Los Angeles Ca 91364 San Diego Ca Pv1. Install 9. 36 kw roof-mounted, utility-interactive pv system. Date: August 12, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-210 | |||||
SCORE 82 Date: October 10, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-281 | |||||
SCORE 82 16964 Paulette Pl Los Angeles Ca 91344 San Diego Ca Pv1. Install 8. 84 kw roof-mounted, utility-interactive pv system. Ce Date: October 16, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287 | |||||
SCORE 82 11846 Garber St Los Angeles Ca 91342 San Diego Ca Pv1. Install 5. 46 kw roof-mounted, utility-interactive pv system. Ce Date: August 5, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 82 17955 Calvert St Los Angeles Ca 91335 San Diego Ca Pv1. Install 7. 8 kw roof-mounted, utility-interactive pv system. Cen Date: August 5, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-211 | |||||
SCORE 82 10464 Penrose St Los Angeles Ca 91352 San Diego Ca Pv1 install roof-mounted solar array on sfd, interconnect with msp. Sy Date: September 16, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-242 | |||||
SCORE 82 5533 Allott Ave Los Angeles Ca 91401 San Diego Ca Pv1 central string inverterter standard plan. Install roof-mounted sol Date: August 15, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222 | |||||
SCORE 82 89 Enfield Ave Los Angeles Ca 91325 San Diego Ca Pv1 single family dwelling. Total system size 6. 8kw ac using 2 central Date: July 16, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-191 | |||||
SCORE 82 Date: October 15, 2014 Contractor: Moein Lak Permit status: Permit expired | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-286 | |||||
SCORE 82 Date: October 8, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-279 | |||||
SCORE 82 3253 Malcolm Ave Los Angeles Ca 90034 San Diego Ca Pv1 install roof mounted pv system sized 5. 0kw interconnected with msp Date: August 7, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-213 | |||||
SCORE 82 Date: October 15, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-285 | |||||
SCORE 82 Date: August 29, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-232 | |||||
SCORE 82 227 Covello St Los Angeles Ca 91307 San Diego Ca Pv1 central transformerless inverter standard plan. Install roof-mount Date: July 25, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-200 | |||||
SCORE 82 12813 League St Los Angeles Ca 91605 San Diego Ca Standard plan: 5. 72kw pv1 roof-mounted system with (22) rec solar 260p Date: July 18, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-194 | |||||
SCORE 82 11852 Fellows Ave Los Angeles Ca 91340 San Diego Ca Pv1 install roof mounted pv system sized 5. 0kw interconnected with msp Date: August 7, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-213 | |||||
SCORE 82 9958 Calvin Ave Los Angeles Ca 91324 San Diego Ca Pv1. Install 7. 28 kw dc roof-moutned, utility-interactive pv system. Date: October 16, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-287 | |||||
SCORE 82 Date: October 10, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-90000-281 | |||||
SCORE 82 12245 Via Santa Barbara Los Angeles Ca 91342 San Diego Ca Pv1 central transformerless inverter standard plan install roof-mounte Date: August 15, 2014 Contractor: Moein Lak Permit status: Permit finaled | Current use: 1 or 2 family dwelling | Permit id: 14041-20000-222 |