QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 3 E St Boston Ma 02210 The purpose of this application is to subdivide a 14 419 sq. Ft. Lot from the parcel located at 3 e street (boston assessors parcel 06-2838-035). The remaining lot will be 58 849 sq. Ft. And contain a four story storage building and associated improvements. The new lot will be vacant. The massachusetts port authority currently has a r. O. W. Easement over the entirely of the proposed lot (srd deed book 45558 page 252). The new lot will be conveyed to massport in fee to support the prosed construction of a driveway to connect massport properties on e street to new cypher street and the south boston by-pass. Included in the electronic submission is a pdf containing the subdivision plan the architectural floor plans and cover sheet for the existing building a letter from the architect regarding floor area the may 2012 boa decision a letter related to the project from the bra the current deed and the deed establishing the r. O. W. Easement. Date: March 1, 2017 Contractor: Mike HammerClient: Plymouth & Brockton Station | Permit type: Subdivision combining lot | Permit status: Open | Current use: Comm | Permit id: Alt683465 | Parcel: 0602683005 | |||||
SCORE 59 3 E St Boston Ma The purpose of this application is to subdivide a 14 419 sq. Ft. Lot from the parcel located at 3 e street (boston assessors parcel 06-2838-035). The remaining lot will be 58 849 sq. Ft. And contain a four story storage building and associated improvements. The new lot will be vacant. The massachusetts port authority currently has a r. O. W. Easement over the entirely of the proposed lot (srd deed book 45558 page 252). The new lot will be conveyed to massport in fee to support the prosed construction of a driveway to connect massport properties on e street to new cypher street and the south boston by-pass. Included in the electronic submission is a pdf containing the subdivision plan the architectural floor plans and cover sheet for the existing building a letter from the architect regarding floor area the may 2012 boa decision a letter related to the project from the bra the current deed and the deed establishing the r. O. W. Easement. Date: March 1, 2017 Contractor: Mike HammerClient: Plymouth & Brockton Station | Permit type: Long form/alteration permit | Expiration date: September 1, 2017 | Current use: Comm | Permit id: Alt683465 | Parcel: 0602683005 |