QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 80 10 1099 Block Of North Capitol Street Washington Dc Please contact d. C. R. A. For after hours permit; working hours;are between 10: pm to 4: am sunday to thursday, 7: am to 7: pm saturday. Five test pits (each measuring approximately 2. 5lx2. 5wx6d) shall be performed on the east side of north capitol street between k street, ne and l street, ne. The test pits will be performed in the sidewalk/landscaped area adjacent to the vacant grass-covered lot (square 0674 / lot 0439). The test pits will be performed with an air knife and vacuum truck to a depth of approximately 6 feet to attempt to visually confirm the location of below-grade utilities. Miss utility locator will be used prior to work start in addition to a private utility locator. Each test pit test hole will be 2. 5ft by 2. 5ft and will extend to a depth of approximately 6 feet below the existing ground surface. The test pits will be back filled (with excavated soils) and the concrete sidewalk patched with bag mix concrete of equivalent depth. The duration of the partial closure of th Date: February 18, 2014 Contractor: Michael VeneziaClient: Michael Saunders | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: July 31, 2014 | Permit id: Pa92127 | |||||
SCORE 80 Contractor: Michael VeneziaPermit status: Notpaid | Expiration date: June 26, 2014 | Permit id: 0 | |||||
SCORE 80 Contractor: Michael VeneziaPermit status: Not paid | Expiration date: June 26, 2014 | Permit id: 0 | |||||
SCORE 80 23 H Street Nw Washington Dc Two soil test borings shall be performed within the sidewalk adjacent to the existing building located at 23 h street, nw, washington, dc. Specifically, one boring will be sited on h street near the intersection with 23rd street, and one boring will be sited along 23rd street, south of h street (reference the attached site plan). The borings will be performed with a single atv-mounted drill rig (8 wide x 15 long). The miss utility locator service will be contacted and used prior to work start, in addition to a private utility locator. The boring test holes will be 6 inches in diameter to a depth of approximately 45 feet below the existing ground surface. The borings will be backfilled (with bentonite slurry) in accordance with ddoe requirements, and the concrete sidewalk will be patched with an equivalent thickness of bag mix concrete. The two borings will not be conducted simultaneously, and will be staged so that only one work zone is occupied at a time. The pedestrian traffic will b Date: May 1, 2014 Contractor: Michael VeneziaClient: Michael Burns Hillel At George Washington University | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: August 7, 2014 | Permit id: Pa94979 | |||||
SCORE 80 Contractor: Michael VeneziaPermit status: Notpaid | Expiration date: June 26, 2014 | Permit id: 0 | |||||
SCORE 80 1849 C Street Nw Washington Dc One soil boring shall be performed on the east side of 19th street to the north of c street. The boring will be performed in the sidewalk/landscaped planter area adjacent to the existing building (1849 c street, nw). The boring will be performed with a single atv mounted drill rig ( wide x long). Prior to performing the soil boring, the boring location will be pre-cleared using a vacuum truck to a depth of feet to attempt to visually confirm the location is clear of below-grade utilities. Miss utility locator will be used prior to work start in addition to a private utility locator. The boring test hole will be 6" in diameter to a depth of approximately feet below the existing ground surface. The boring will be backfilled (with bentonite slurry) and patched in accordance with ddoe requirements. The duration of the partial closure of the sidewalk will be for a period of approximately 8 hours. The pedestrian traffic will be routed around the outside of the work area (a minimum six-foot p Date: August 20, 2013 Contractor: Michael VeneziaClient: Pradip Patel | Permit type: Excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: November 7, 2013 | Permit id: Pa85914 | |||||
SCORE 80 10 1099 Block Of North Capitol Street Washington Dc Please contact d. C. R. A. For after hours permit; working hours;are between 10: pm to 4: am sunday to thursday, 7: am to 7: pm saturday. Five test pits (each measuring approximately 2. 5lx2. 5wx6d) shall be performed on the east side of north capitol street between k street, ne and l street, ne. The test pits will be performed in the sidewalk/landscaped area adjacent to the vacant grass-covered lot (square 0674 / lot 0439). The test pits will be performed with an air knife and vacuum truck to a depth of approximately 6 feet to attempt to visually confirm the location of below-grade utilities. Miss utility locator will be used prior to work start in addition to a private utility locator. Each test pit test hole will be 2. 5ft by 2. 5ft and will extend to a depth of approximately 6 feet below the existing ground surface. The test pits will be back filled (with excavated soils) and the concrete sidewalk patched with bag mix concrete of equivalent depth. The duration of the partial closure of th Date: February 18, 2014 Contractor: Michael VeneziaClient: Michael Saunders | Permit type: Excavation; boring test pit (each addl), excavation; boring test pit (single) | Permit status: Permit expired | Expiration date: July 31, 2014 | Permit id: Pa92127 | |||||
SCORE 80 Date: September 16, 2013 Contractor: Michael VeneziaPermit status: Permit expired | Expiration date: October 15, 2013 | Permit id: Pa10113293 | |||||
SCORE 80 Contractor: Michael VeneziaPermit status: Not paid | Expiration date: June 26, 2014 | Permit id: 0 |