SCORE

MARIO HERNANDEZ

ABOUT MARIO HERNANDEZ

Mario Hernandez specializes in:

Mario Hernandez offers services:

Based on the information received from , associated with Mario Hernandez over the past .

If you are considering hiring Mario Hernandez for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Mario Hernandez has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
97
232-234 Friend St Boston Ma 02114
Change some bolt scrape and paint fire escape (2 floors)
Date:  December 2, 2013
Value:   $2,600
Contractor: Mario Hernandez

Client: Mcgann Thomas G | Permit type: Other | Current use: Comm | Permit id: Sf309380 | Parcel: 301658000
2013/12/02260097232-234 Friend St Boston Ma 02114Mario Hernandez
SCORE
97
170 Saint Botolph St Boston Ma 02115
Replaces gratings the first floor and sencond floor on thase fire escape and change some screws
Date:  May 13, 2014
Value:   $2,900
Contractor: Mario Hernandez

Client: 170 Saint Botolph St Realty Trust | Permit type: Other | Current use: Multi | Permit id: Sf362161 | Parcel: 402369000
2014/05/13290097170 Saint Botolph St Boston Ma 02115Mario Hernandez
SCORE
97
1273 Massachusetts Av Dorchester Ma 02125
Repair an fire escapes 3 floor fire escape repair brakets replaces square head bolts replaces steps which is needed in the fire escape scrape and paint
Date:  July 1, 2014
Value:   $8,500
Contractor: Mario Hernandez

Client: Ifrah | Permit type: Other | Current use: 1-4fam | Permit id: Sf379722 | Parcel: 703587000
2014/07/018500971273 Massachusetts Av Dorchester Ma 02125Mario Hernandez
SCORE
97
1340 Commonwealth A Allston Ma 02134
Repair two fire escapes replaces all sq head bolts in all fire escape scrape & paint all fire escape and paint
Date:  August 19, 2014
Value:   $21,000
Contractor: Mario Hernandez

Client: Atlantic Realty | Permit type: Renovations - exteri | Current use: Apartment | Permit id: Sf397813 | Parcel: 2101512000
2014/08/1921000971340 Commonwealth A Allston Ma 02134Mario Hernandez
SCORE
97
430 Marlborough St Boston Ma 02115
Repair fire escape replace all sq heads bolts replaces all treads scrape & paint all fire escape
Date:  August 19, 2014
Value:   $11,500
Contractor: Mario Hernandez

Client: 430 Marlborough St | Permit type: Renovations - exteri | Current use: 1-4fam | Permit id: Sf397784 | Parcel: 503845000
2014/08/191150097430 Marlborough St Boston Ma 02115Mario Hernandez
SCORE
97
20-22 Lime St Boston Ma 02108
Replaces only sq hadl bolts
Date:  August 20, 2014
Value:   $3,750
Contractor: Mario Hernandez

Client: Twenty Lime Llc | Permit type: Renovations - exteri | Current use: Multi | Permit id: Sf397789 | Parcel: 502346000
2014/08/2037509720-22 Lime St Boston Ma 02108Mario Hernandez
SCORE
97
727-731 Boylston St Boston Ma 02116
Repair existing fire escape replaces sq head bolts repair steps and replaces 15 steps scrape and paint all fire escape at 729 boylston st boston ma
Date:  August 25, 2014
Value:   $16,000
Contractor: Mario Hernandez

Permit type: Renovations - exteri | Current use: Comm | Permit id: Sf400427
2014/08/251600097727-731 Boylston St Boston Ma 02116Mario Hernandez
SCORE
97
232 234 Friend St Boston Ma 02114
Change some bolt scrape and paint fire escape (2 floors)
Date:  December 2, 2013
Value:   $2,600
Contractor: Mario Hernandez

Client: Mcgann Thomas G | Permit type: Other | Permit status: Expired | Current use: Comm | Permit id: Sf309380 | Parcel: 0301658000
2013/12/02260097232 234 Friend St Boston Ma 02114Mario Hernandez
SCORE
97
2284 2288 Dorchester Av Dorchester Ma 02124
Replace two set of metal stairs 36 height undating code of mass with 2 sopports column 32 heiht and metal hand railins prime paint and install
Date:  July 30, 2015
Value:   $4,500
Contractor: Mario Hernandez

Permit type: Interior/exterior wo | Permit status: Open | Current use: Other | Permit id: Sf500562 | Parcel: 1703552000
2015/07/304500972284 2288 Dorchester Av Dorchester Ma 02124Mario Hernandez
SCORE
97
182 H St Boston Ma 02127
New frabrication of 3 floor metal deck 12ftx with sopports 4x4-14 post and concrete foundry and metal grate floor. All meatal handdrills would be 42" hg all work would be fabricated at the welding places in 69 norman st everett ma. And all work would be prime paint and installed
Date:  October 29, 2015
Value:   $24,500
Contractor: Mario Hernandez

Permit type: Interior/exterior wo | Permit status: Open | Current use: Other | Permit id: Alt531594 | Parcel: 0701935000
2015/10/292450097182 H St Boston Ma 02127Mario Hernandez
SCORE
97
65 67 Charter St Boston Ma 02113
Repair fire balconies fix all those supports brackets ans replaces all squeer heald bolts repair all which need to be repair fire balcony at sencond floor need to replaces all sq heald bolts and fix all supports brackets scrape all those 4 fire balconies and paint and provided an affidavit certificated for 5 years...
Date:  December 11, 2015
Value:   $20,500
Contractor: Mario Hernandez

Client: Tru-Realty Trust | Permit type: Renovations - exterior | Permit status: Open | Current use: Other | Permit id: Sf546916 | Parcel: 0302001000
2015/12/11205009765 67 Charter St Boston Ma 02113Mario Hernandez
SCORE
97
20 22 Lime St Boston Ma 02108
Replaces only sq hadl bolts
Date:  August 20, 2014
Value:   $3,750
Contractor: Mario Hernandez

Client: Twenty Lime Llc | Permit type: Renovations - exterior | Permit status: Expired | Current use: Multi | Permit id: Sf397789 | Parcel: 0502346000
2014/08/2037509720 22 Lime St Boston Ma 02108Mario Hernandez
SCORE
97
727 731 Boylston St Boston Ma 02116
Repair existing fire escape replaces sq head bolts repair steps and replaces 15 steps scrape and paint all fire escape at 729 boylston st boston ma
Date:  August 25, 2014
Value:   $16,000
Contractor: Mario Hernandez

Permit type: Renovations - exterior | Permit status: Expired | Current use: Comm | Permit id: Sf400427
2014/08/251600097727 731 Boylston St Boston Ma 02116Mario Hernandez
SCORE
97
4 12 Perthshire Rd Brighton Ma 02135
Remove and replaces existing sq head bolts at steps and platform &; railings.. And repair stair balance scrape all fire escape and paint and provided an affidavit certificated
Date:  February 20, 2015
Value:   $10,500
Contractor: Mario Hernandez

Permit type: Interior/exterior work | Permit status: Expired | Current use: Other | Permit id: Sf448808
2015/02/2010500974 12 Perthshire Rd Brighton Ma 02135Mario Hernandez
SCORE
97
381 Dorchester St Boston Ma 02127
Repair 1pcs platform at the third floor and scrape and paint repair platform 5x13ft fix two supports brackest ans stair steps and hand railings at left side of building repair existign stair at back of building repair rails steps and brackets scrape and paint ....
Date:  March 31, 2015
Value:   $8,500
Contractor: Mario Hernandez

Permit type: Other | Permit status: Expired | Current use: Multi | Permit id: Sf458539 | Parcel: 0700089000
2015/03/31850097381 Dorchester St Boston Ma 02127Mario Hernandez
SCORE
97
2284 2288 Dorchester Dorchester Ma 02124
Replace two set of metal stairs 36 height undating code of mass with 2 sopports column 32 heiht and metal hand railins prime paint and install
Date:  July 30, 2015
Value:   $4,500
Contractor: Mario Hernandez

Client: Hadaya Louis S | Permit type: Interior/exterior work | Permit status: Expired | Current use: Other | Permit id: Sf500562 | Parcel: 1703552000
2015/07/304500972284 2288 Dorchester Dorchester Ma 02124Mario Hernandez
SCORE
97
229 Pearl St Cambridge, Ma
Stripped the afterreplaced architectura chingle
Date:  August 6, 2015
Value:   $9,600
Contractor: Mario Hernandez

Permit type: Roof | Completion date: August 11, 2015 | Parcel: 102119
2015/08/06960097229 Pearl St Cambridge, MaMario Hernandez
SCORE
97
9496a Tyler St Boston Ma 02111
Fire escape repair at front of the building will be 3 fire balconies at front and 3 fire balconies at the side is the building will be repair all areas which need to be repairs and replaces all sq head bolts and scrape and paint and provide an affidavit certificate.
Date:  January 18, 2017
Value:   $14,000
Contractor: Mario Hernandez

Permit type: Renovations - exterior | Permit status: Open | Current use: Multi | Permit id: Sf673694
2017/01/1814000979496a Tyler St Boston Ma 02111Mario Hernandez
SCORE
97
74 Tyler St Boston Ma 02111
Fabricate a new 4 floor fire escape steel deck with stairs up &; down deck 8w x 23 long and 7 supports columns with concrete footing and metal railings all work will be primer paint back and install fire escape would be fabricate by the professional engineer design
Date:  January 18, 2017
Value:   $38,000
Contractor: Mario Hernandez

Client: Seventy 4 - 76 Tyler St | Permit type: Renovations - exterior | Permit status: Open | Current use: Multi | Permit id: Alt665947 | Parcel: 0305134000
2017/01/18380009774 Tyler St Boston Ma 02111Mario Hernandez
SCORE
97
9 East St Boston Ma 02111
Fire escape repair at back of the building will be repair all areas which need to be repair and replaces all squared head bolts and fix all those supports brackets and scrape and paint and provide an affidavit
Date:  February 21, 2017
Value:   $6,000
Contractor: Mario Hernandez

Client: Hrt East Llc | Permit type: Renovations - exterior | Permit status: Open | Current use: Other | Permit id: Sf682272 | Parcel: 0304320000
2017/02/216000979 East St Boston Ma 02111Mario Hernandez
SCORE
97
243245 Dorchester S South Boston Ma 02127
Repair fire escape which is currently broken we will fix it and fix the first level balcony which is damaged to correct violation v335900
Date:  March 15, 2017
Value:   $7,800
Contractor: Mario Hernandez

Permit type: Application to correct a vi | Permit status: Open | Current use: Mixed | Permit id: Sf688713 | Parcel: 0700513000
2017/03/15780097243245 Dorchester S South Boston Ma 02127Mario Hernandez
SCORE
97
59 Broad St Boston Ma 02109
Fire escape repair add 3 brackets supports and fix 3 of those brackets and replaces all squared head bold which need to be replaces fix all those areas which need to be fix and scrape and paint all fire escape and provide and affidavit.
Date:  April 3, 2017
Value:   $8,000
Contractor: Mario Hernandez

Client: Nine Broad St Llc | Permit type: Renovations - exterior | Permit status: Open | Current use: Other | Permit id: Sf693467 | Parcel: 0303868010
2017/04/0380009759 Broad St Boston Ma 02109Mario Hernandez
SCORE
97
5 Beacon St Boston Ma 02215
5 ffloor fire escape repair replaces all square head bolts at all fire escape stairs and balconies and fix some supports brackets repair all which need to be repair and provided an affidavit and scrape and paint all fire escape
Date:  September 20, 2016
Value:   $12,850
Contractor: Mario Hernandez

Client: Five Twenty Beacon | Permit type: Renovations - exterior | Permit status: Open | Current use: Multi | Permit id: Sf631061 | Parcel: 0503698000
2016/09/2012850975 Beacon St Boston Ma 02215Mario Hernandez
SCORE
97
9999b Hudson St Boston Ma 02111
Fabricate 2 temporary stairs at front of building and install metal grating at those 3 existing fire balconies and extend 9 more at top of those existing wrought iron railings at front and back back of building fabricate 3 temporary stairs at front of those balconies those stairs will be with grating steps and railings at both sides
Date:  October 12, 2016
Value:   $27,280
Contractor: Mario Hernandez

Permit type: Renovations - exterior | Permit status: Open | Current use: Other | Permit id: Sf646378
2016/10/1227280979999b Hudson St Boston Ma 02111Mario Hernandez
SCORE
97
9 Cooper St Boston Ma 02113
Remove old treads and old platforms grating and re-install new treads & platforms at each floor and each building 9 & 7 cooper st all connection clips and treads & grating floor will be installed with screws and prime and paint. And we provide an affidavit certificate for 5 years inspection..
Date:  April 21, 2016
Value:   $18,500
Contractor: Mario Hernandez

Client: Statires Realty Llc | Permit type: Renovations - exterior | Permit status: Expired | Current use: Other | Permit id: Sf582857 | Parcel: 0301294000
2016/04/2118500979 Cooper St Boston Ma 02113Mario Hernandez
SCORE
97
227227a Harrison Av Boston Ma 02111
Fire balconies repair at front of the building replaces all sq head bolt and scrape all those 3 fire balconies and paint and provide an affidavit certificate.
Date:  November 4, 2016
Value:   $6,800
Contractor: Mario Hernandez

Client: Lim Yuen Sim Ng | Permit type: Interior/exterior work | Permit status: Open | Current use: Multi | Permit id: Sf653503 | Parcel: 0305471000
2016/11/04680097227227a Harrison Av Boston Ma 02111Mario Hernandez
SCORE
97
1117 East St Boston Ma 02111
5 floor fire escape repair replaces all existing sq head bolts at all fire escape stairs & balconies and railings and fix all supports brackets and repair all which need to be repair and replaces some grating floor and scrape and paint all fire escape and provide an affidavit certificate
Date:  May 19, 2016
Value:   $16,550
Contractor: Mario Hernandez

Permit type: Interior/exterior work | Permit status: Expired | Current use: Other | Permit id: Sf593581
2016/05/1916550971117 East St Boston Ma 02111Mario Hernandez
SCORE
97
412 Perthshire Rd Brighton Ma 02135
Remove and replaces existing sq head bolts at steps and platform &; railings.. And repair stair balance scrape all fire escape and paint and provided an affidavit certificated
Date:  February 20, 2015
Value:   $10,500
Contractor: Mario Hernandez

Permit type: Interior/exterior work | Permit status: Expired | Current use: Other | Permit id: Sf448808
2015/02/201050097412 Perthshire Rd Brighton Ma 02135Mario Hernandez
SCORE
97
85 Park Dr Boston Ma 02215
Repair fire balconies replaces all existing square head bolts and scrape and paint and provide affidavit certificate
Date:  July 21, 2016
Value:   $9,400
Contractor: Mario Hernandez

Client: Fenview Condo Trust | Permit type: Renovations - exterior | Permit status: Expired | Current use: Multi | Permit id: Sf615612 | Parcel: 0504259000
2016/07/2194009785 Park Dr Boston Ma 02215Mario Hernandez
SCORE
97
14 Gloucester St Boston Ma 02115
Repair fire escape remove and replaces existing square head bolts at back of building scrape and paint. And replaces square head bolts at 3 fire balconies at front of building and scrape and paint..
Date:  September 2, 2015
Value:   $13,000
Contractor: Mario Hernandez

Client: Sw7 Partners Llc | Permit type: Renovations - exterior | Permit status: Open | Current use: 1-4fam | Permit id: Sf515684 | Parcel: 0503562000
2015/09/02130009714 Gloucester St Boston Ma 02115Mario Hernandez
SCORE
97
435 Columbia Rd Dorchester Ma 02125
Replacess all sq held bolts at all fire escape and scrape all fire eescape and new paint and provided and certification for 5 years
Date:  December 3, 2015
Value:   $4,500
Contractor: Mario Hernandez

Client: The Columbia Road Props | Permit type: Interior/exterior work | Permit status: Open | Current use: Other | Permit id: Sf544495 | Parcel: 1502723000
2015/12/03450097435 Columbia Rd Dorchester Ma 02125Mario Hernandez
SCORE
97
727731 Boylston St Boston Ma 02116
Repair existing fire escape replaces sq head bolts repair steps and replaces 15 steps scrape and paint all fire escape at 729 boylston st boston ma
Date:  August 25, 2014
Value:   $16,000
Contractor: Mario Hernandez

Client: Linear Retail Boston #12 Llc | Permit type: Renovations - exterior | Permit status: Expired | Current use: Comm | Permit id: Sf400427 | Parcel: 0503206002
2014/08/251600097727731 Boylston St Boston Ma 02116Mario Hernandez
SCORE
97
2022 Lime St Boston Ma 02108
Replaces only sq hadl bolts
Date:  August 20, 2014
Value:   $3,750
Contractor: Mario Hernandez

Client: Twenty Lime Llc | Permit type: Renovations - exterior | Permit status: Expired | Current use: Multi | Permit id: Sf397789 | Parcel: 0502346000
2014/08/203750972022 Lime St Boston Ma 02108Mario Hernandez
SCORE
97
97 Bay State Rd Boston Ma 02215
Re- instal steel grating at front of building at hird floor... Re-instal steel platform with existing sopports and steel grating at back of building and paint.
Date:  November 14, 2014
Value:   $3,700
Contractor: Mario Hernandez

Client: Mass/gamma Phi Delta | Permit type: Interior/exterior work | Current use: 1-2fam | Permit id: Sf427038 | Parcel: 503744000
2014/11/1437009797 Bay State Rd Boston Ma 02215Mario Hernandez
SCORE
97
1273 Massachusetts A Dorchester Ma 02125
Repair an fire escapes 3 floor fire escape repair brakets replaces square head bolts replaces steps which is needed in the fire escape scrape and paint
Date:  July 1, 2014
Value:   $8,500
Contractor: Mario Hernandez

Client: Ifrah Ron | Permit type: Other | Permit status: Expired | Current use: 1-4fam | Permit id: Sf379722 | Parcel: 0703587000
2014/07/018500971273 Massachusetts A Dorchester Ma 02125Mario Hernandez
SCORE
97
48 Pinckney St Boston Ma 02114
Repair all sq heald bolts repair evething that needs to be repaor in the fire escape
Date:  August 20, 2014
Value:   $6,300
Contractor: Mario Hernandez

Client: Fourty 8 Pinckney St Condo | Permit type: Renovations - exterior | Current use: Multi | Permit id: Sf397800 | Parcel: 501668000
2014/08/2063009748 Pinckney St Boston Ma 02114Mario Hernandez
SCORE
97
6567 Charter St Boston Ma 02113
Repair fire balconies fix all those supports brackets ans replaces all squeer heald bolts repair all which need to be repair fire balcony at sencond floor need to replaces all sq heald bolts and fix all supports brackets scrape all those 4 fire balconies and paint and provided an affidavit certificated for 5 years...
Date:  December 11, 2015
Value:   $20,500
Contractor: Mario Hernandez

Client: Trulli Alphonse J Trst | Permit type: Renovations - exterior | Permit status: Expired | Current use: Other | Permit id: Sf546916 | Parcel: 0302001000
2015/12/1120500976567 Charter St Boston Ma 02113Mario Hernandez
SCORE
97
461 Columbia Rd Dorchester Ma 02125
Replaces all sq held bolt at all fire escape and repaiar sopports brackets and new paint and provided an certificated for 5 years
Date:  December 3, 2015
Value:   $6,900
Contractor: Mario Hernandez

Client: The Columbia Road Props | Permit type: Interior/exterior work | Permit status: Open | Current use: Other | Permit id: Sf544505 | Parcel: 1502615000
2015/12/03690097461 Columbia Rd Dorchester Ma 02125Mario Hernandez
SCORE
97
182 H St South Boston Ma 02127
New frabrication of 3 floor metal deck 12ftx with sopports 4x4-1/4 post and concrete foundry and metal grate floor. All meatal handdrills would be 42" hg all work would be fabricated at the welding places in 69 norman st everett ma. And all work would be prime paint and installed
Date:  October 29, 2015
Value:   $24,500
Contractor: Mario Hernandez

Client: Hanley Catherine M | Permit type: Interior/exterior work | Permit status: Expired | Current use: Other | Permit id: Alt531594 | Parcel: 0701935000
2015/10/292450097182 H St South Boston Ma 02127Mario Hernandez
SCORE
97
4 Garden Court St Boston Ma 02113
Replase sq heald bolts at the fire balconies at 2-3-4-5 floors repair brackets sopports scrape all those fire balconies and paint and provided an certificated of fire escape
Date:  May 20, 2015
Value:   $7,700
Contractor: Mario Hernandez

Client: Howell Diane Marino | Permit type: Renovations - exterior | Permit status: Expired | Current use: Multi | Permit id: Sf474903 | Parcel: 0303204000
2015/05/207700974 Garden Court St Boston Ma 02113Mario Hernandez
SCORE
97
17 Cumberland St Boston Ma 02115
Repair fire balconies at third floor and replaces sq head bolts repair brackets and scrape and paint and priveded an certification
Date:  February 4, 2015
Value:   $4,550
Contractor: Mario Hernandez

Client: Rothermel Sarah A | Permit type: Interior/exterior work | Permit status: Expired | Current use: 1-2fam | Permit id: Sf445727 | Parcel: 0402392000
2015/02/0445509717 Cumberland St Boston Ma 02115Mario Hernandez
SCORE
97
13 Commonwealth Av Allston Ma 02134
Repair two fire escapes replaces all sq head bolts in all fire escape scrape & paint all fire escape and paint
Date:  August 19, 2014
Value:   $21,000
Contractor: Mario Hernandez

Client: Katz Jonathan M Trst | Permit type: Renovations - exterior | Permit status: Expired | Current use: Multi | Permit id: Sf397813 | Parcel: 2101512000
2014/08/19210009713 Commonwealth Av Allston Ma 02134Mario Hernandez
SCORE
97
232234 Friend St Boston Ma 02114
Change some bolt scrape and paint fire escape (2 floors)
Date:  December 2, 2013
Value:   $2,600
Contractor: Mario Hernandez

Permit type: Other | Permit status: Expired | Current use: Comm | Permit id: Sf309380 | Parcel: 0301658000
2013/12/02260097232234 Friend St Boston Ma 02114Mario Hernandez
SCORE
97
14 Marlborough St Boston Ma 02116
Repair fire escape replaces 1 section of realing fix 2 brackets sopports and replaces a angular on hand railing re- install 1 pcs grate floor
Date:  July 17, 2015
Value:   $4,500
Contractor: Mario Hernandez

Client: Fourteen Marlborough St Llc | Permit type: Interior/exterior work | Permit status: Open | Current use: Multi | Permit id: Sf495903 | Parcel: 0502849000
2015/07/1745009714 Marlborough St Boston Ma 02116Mario Hernandez
SCORE
97
1 Saint Botolph St Boston Ma 02115
Replaces gratings the first floor and sencond floor on thase fire escape and change some screws
Date:  May 13, 2014
Value:   $2,900
Contractor: Mario Hernandez

Client: Deph Realty Llc | Permit type: Other | Permit status: Expired | Current use: Multi | Permit id: Sf362161 | Parcel: 0402369000
2014/05/132900971 Saint Botolph St Boston Ma 02115Mario Hernandez
SCORE
97
16 Essex St Charlestown Ma 02129
Restore fire exits supports staircase two balconies repairs second and third floor securing brackets balconies do all that is necessary primer and paint
Date:  July 7, 2014
Value:   $16,500
Contractor: Mario Hernandez

Client: Gould Joseph F | Permit type: Renovations - exterior | Current use: 1-3fam | Permit id: Sf381097 | Parcel: 202504000
2014/07/07165009716 Essex St Charlestown Ma 02129Mario Hernandez
SCORE
97
4 Marlborough St Boston Ma 02115
Repair fire escape replace all sq heads bolts replaces all treads scrape & paint all fire escape
Date:  August 19, 2014
Value:   $11,500
Contractor: Mario Hernandez

Client: Kelly Stephen M Trsts | Permit type: Renovations - exterior | Permit status: Expired | Current use: 1-4fam | Permit id: Sf397784 | Parcel: 0503845000
2014/08/1911500974 Marlborough St Boston Ma 02115Mario Hernandez
SCORE
97
311 Beacon St Boston Ma 02116
Fire escape repair replaces all square botls screp and paint 2 floors
Date:  April 4, 2014
Value:   $6,800
Contractor: Mario Hernandez

Client: Palmisciano Denis | Permit type: Other | Current use: 1-4fam | Permit id: Sf349953 | Parcel: 503311000
2014/04/04680097311 Beacon St Boston Ma 02116Mario Hernandez
SCORE
97
2 Garden Court St Boston Ma 02113
Repair 3 fire balconies replacess all sq heald bolts and check steel supports and conecting railings and platforms scrape all those 3 balconies and paint and provide an certificate of inspection
Date:  June 2, 2015
Value:   $2,900
Contractor: Mario Hernandez

Client: Cornell Concetta D | Permit type: Interior/exterior work | Permit status: Expired | Current use: Multi | Permit id: Sf479359 | Parcel: 0303203000
2015/06/022900972 Garden Court St Boston Ma 02113Mario Hernandez
SCORE
97
381 Dorchester St South Boston Ma 02127
Repair 1pcs platform at the third floor and scrape and paint repair platform 5x13ft fix two supports brackest ans stair steps and hand railings at left side of building repair existign stair at back of building repair rails steps and brackets scrape and paint ....
Date:  March 31, 2015
Value:   $8,500
Contractor: Mario Hernandez

Client: The Hearthstone Corporation | Permit type: Other | Permit status: Expired | Current use: Multi | Permit id: Sf458539 | Parcel: 0700089000
2015/03/31850097381 Dorchester St South Boston Ma 02127Mario Hernandez
SCORE
97
22842288 Dorchester Dorchester Ma 02124
Replace two set of metal stairs 36 height undating code of mass with 2 sopports column 32 heiht and metal hand railins prime paint and install
Date:  July 30, 2015
Value:   $4,500
Contractor: Mario Hernandez

Client: Adams Lower Mills Llc | Permit type: Interior/exterior work | Permit status: Expired | Current use: Other | Permit id: Sf500562 | Parcel: 1703552000
2015/07/3045009722842288 Dorchester Dorchester Ma 02124Mario Hernandez
SCORE
97
712 Troy St Chicago Il
Replace 1 furnace
Date:  December 7, 2007
Contractor: Mario Hernandez

Permit type: Permit - easy permit | Permit id: 100215333
2007/12/07097712 Troy St Chicago IlMario Hernandez
SCORE
97
97 Bay State Rd Boston Ma
Re- instal steel grating at front of building at hird floor... Re-instal steel platform with existing sopports and steel grating at back of building and paint.
Date:  November 14, 2014
Value:   $3,700
Contractor: Mario Hernandez

Client: Massgamma Phi Delta | Permit type: Short form bldg permit | Expiration date: May 14, 2015 | Current use: 1-2fam | Permit id: Sf427038 | Parcel: 0503744000
2014/11/1437009797 Bay State Rd Boston MaMario Hernandez
SCORE
97
17 Cumberland St Boston Ma
Repair fire balconies at third floor and replaces sq head bolts repair brackets and scrape and paint and priveded an certification
Date:  February 4, 2015
Value:   $4,550
Contractor: Mario Hernandez

Client: Rothermel Sara | Permit type: Short form bldg permit | Expiration date: August 4, 2015 | Current use: 1-2fam | Permit id: Sf445727 | Parcel: 0402392000
2015/02/0445509717 Cumberland St Boston MaMario Hernandez
SCORE
97
232 234 Friend St Boston Ma
Change some bolt scrape and paint fire escape (2 floors)
Date:  December 2, 2013
Value:   $2,600
Contractor: Mario Hernandez

Client: Mcgann Thomas G | Permit type: Short form bldg permit | Expiration date: June 2, 2014 | Current use: Comm | Permit id: Sf309380 | Parcel: 0301658000
2013/12/02260097232 234 Friend St Boston MaMario Hernandez
SCORE
97
14 Gloucester St Boston Ma
Repair fire escape remove and replaces existing square head bolts at back of building scrape and paint. And replaces square head bolts at 3 fire balconies at front of building and scrape and paint..
Date:  September 2, 2015
Value:   $13,000
Contractor: Mario Hernandez

Client: Sw7 Partners Llc | Permit type: Short form bldg permit | Expiration date: March 2, 2016 | Current use: 1-4fam | Permit id: Sf515684 | Parcel: 0503562000
2015/09/02130009714 Gloucester St Boston MaMario Hernandez
SCORE
97
4 Garden Court St Boston Ma
Replase sq heald bolts at the fire balconies at 2-3-4-5 floors repair brackets sopports scrape all those fire balconies and paint and provided an certificated of fire escape
Date:  May 20, 2015
Value:   $7,700
Contractor: Mario Hernandez

Client: Howell Diane Marino | Permit type: Short form bldg permit | Expiration date: November 20, 2015 | Current use: Multi | Permit id: Sf474903 | Parcel: 0303204000
2015/05/207700974 Garden Court St Boston MaMario Hernandez
SCORE
97
2 Garden Court St Boston Ma
Repair 3 fire balconies replacess all sq heald bolts and check steel supports and conecting railings and platforms scrape all those 3 balconies and paint and provide an certificate of inspection
Date:  June 2, 2015
Value:   $2,900
Contractor: Mario Hernandez

Client: Cornell Concet | Permit type: Short form bldg permit | Expiration date: December 2, 2015 | Current use: Multi | Permit id: Sf479359 | Parcel: 0303203000
2015/06/022900972 Garden Court St Boston MaMario Hernandez
SCORE
97
435 Columbia Rd Dorchester Ma
Replacess all sq held bolts at all fire escape and scrape all fire eescape and new paint and provided and certification for 5 years
Date:  December 3, 2015
Value:   $4,500
Contractor: Mario Hernandez

Client: The Columbia Road Props | Permit type: Short form bldg permit | Expiration date: June 3, 2016 | Current use: Other | Permit id: Sf544495 | Parcel: 1502723000
2015/12/03450097435 Columbia Rd Dorchester MaMario Hernandez
SCORE
97
461 Columbia Rd Dorchester Ma
Replaces all sq held bolt at all fire escape and repaiar sopports brackets and new paint and provided an certificated for 5 years
Date:  December 3, 2015
Value:   $6,900
Contractor: Mario Hernandez

Client: The Columbia Road Props | Permit type: Short form bldg permit | Expiration date: June 3, 2016 | Current use: Other | Permit id: Sf544505 | Parcel: 1502615000
2015/12/03690097461 Columbia Rd Dorchester MaMario Hernandez
SCORE
97
65 67 Charter St Boston Ma
Repair fire balconies fix all those supports brackets ans replaces all squeer heald bolts repair all which need to be repair fire balcony at sencond floor need to replaces all sq heald bolts and fix all supports brackets scrape all those 4 fire balconies and paint and provided an affidavit certificated for 5 years...
Date:  December 11, 2015
Value:   $20,500
Contractor: Mario Hernandez

Client: Tru-Realty Trust | Permit type: Short form bldg permit | Expiration date: June 11, 2016 | Current use: Other | Permit id: Sf546916 | Parcel: 0302001000
2015/12/11205009765 67 Charter St Boston MaMario Hernandez
SCORE
97
14 Marlborough St Boston Ma
Repair fire escape replaces 1 section of realing fix 2 brackets sopports and replaces a angular on hand railing re- install 1 pcs grate floor
Date:  July 17, 2015
Value:   $4,500
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: January 17, 2016 | Current use: Multi | Permit id: Sf495903 | Parcel: 0502849000
2015/07/1745009714 Marlborough St Boston MaMario Hernandez
SCORE
97
2284 2288 Dorchester Dorchester Ma
Replace two set of metal stairs 36 height undating code of mass with 2 sopports column 32 heiht and metal hand railins prime paint and install
Date:  July 30, 2015
Value:   $4,500
Contractor: Mario Hernandez

Client: Hadaya Louis S | Permit type: Short form bldg permit | Expiration date: January 30, 2016 | Current use: Other | Permit id: Sf500562 | Parcel: 1703552000
2015/07/304500972284 2288 Dorchester Dorchester MaMario Hernandez
SCORE
97
48 Pinckney St Boston Ma
Repair all sq heald bolts repair evething that needs to be repaor in the fire escape
Date:  August 20, 2014
Value:   $6,300
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: February 20, 2015 | Current use: Multi | Permit id: Sf397800 | Parcel: 0501668000
2014/08/2063009748 Pinckney St Boston MaMario Hernandez
SCORE
97
20 22 Lime St Boston Ma
Replaces only sq hadl bolts
Date:  August 20, 2014
Value:   $3,750
Contractor: Mario Hernandez

Client: Twenty Lime Llc | Permit type: Short form bldg permit | Expiration date: February 20, 2015 | Current use: Multi | Permit id: Sf397789 | Parcel: 0502346000
2014/08/2037509720 22 Lime St Boston MaMario Hernandez
SCORE
97
727 731 Boylston St Boston Ma
Repair existing fire escape replaces sq head bolts repair steps and replaces 15 steps scrape and paint all fire escape at 729 boylston st boston ma
Date:  August 25, 2014
Value:   $16,000
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: February 25, 2015 | Current use: Comm | Permit id: Sf400427
2014/08/251600097727 731 Boylston St Boston MaMario Hernandez
SCORE
97
1273 Massachusetts A Dorchester Ma
Repair an fire escapes 3 floor fire escape repair brakets replaces square head bolts replaces steps which is needed in the fire escape scrape and paint
Date:  July 1, 2014
Value:   $8,500
Contractor: Mario Hernandez

Client: Ifrah | Permit type: Short form bldg permit | Expiration date: January 1, 2015 | Current use: 1-4fam | Permit id: Sf379722 | Parcel: 0703587000
2014/07/018500971273 Massachusetts A Dorchester MaMario Hernandez
SCORE
97
4 Marlborough St Boston Ma
Repair fire escape replace all sq heads bolts replaces all treads scrape & paint all fire escape
Date:  August 19, 2014
Value:   $11,500
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: February 19, 2015 | Current use: 1-4fam | Permit id: Sf397784 | Parcel: 0503845000
2014/08/1911500974 Marlborough St Boston MaMario Hernandez
SCORE
97
16 Essex St Charlestown Ma
Restore fire exits supports staircase two balconies repairs second and third floor securing brackets balconies do all that is necessary primer and paint
Date:  July 7, 2014
Value:   $16,500
Contractor: Mario Hernandez

Client: Gould Joseph F | Permit type: Short form bldg permit | Expiration date: January 7, 2015 | Current use: 1-3fam | Permit id: Sf381097 | Parcel: 0202504000
2014/07/07165009716 Essex St Charlestown MaMario Hernandez
SCORE
97
4 12 Perthshire Rd Brighton Ma
Remove and replaces existing sq head bolts at steps and platform &; railings.. And repair stair balance scrape all fire escape and paint and provided an affidavit certificated
Date:  February 20, 2015
Value:   $10,500
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: August 20, 2015 | Current use: Other | Permit id: Sf448808
2015/02/2010500974 12 Perthshire Rd Brighton MaMario Hernandez
SCORE
97
13 Commonwealth Av Allston Ma
Repair two fire escapes replaces all sq head bolts in all fire escape scrape & paint all fire escape and paint
Date:  August 19, 2014
Value:   $21,000
Contractor: Mario Hernandez

Client: Atlantic Realty | Permit type: Short form bldg permit | Expiration date: February 19, 2015 | Current use: Multi | Permit id: Sf397813 | Parcel: 2101512000
2014/08/19210009713 Commonwealth Av Allston MaMario Hernandez
SCORE
97
381 Dorchester St South Boston Ma
Repair 1pcs platform at the third floor and scrape and paint repair platform 5x13ft fix two supports brackest ans stair steps and hand railings at left side of building repair existign stair at back of building repair rails steps and brackets scrape and paint ....
Date:  March 31, 2015
Value:   $8,500
Contractor: Mario Hernandez

Client: The Hearthstone Corporation | Permit type: Short form bldg permit | Expiration date: September 30, 2015 | Current use: Multi | Permit id: Sf458539 | Parcel: 0700089000
2015/03/31850097381 Dorchester St South Boston MaMario Hernandez
SCORE
97
727731 Boylston St Boston Ma
Repair existing fire escape replaces sq head bolts repair steps and replaces 15 steps scrape and paint all fire escape at 729 boylston st boston ma
Date:  August 25, 2014
Value:   $16,000
Contractor: Mario Hernandez

Client: Boylston 729 Llc | Permit type: Short form bldg permit | Expiration date: February 25, 2015 | Current use: Comm | Permit id: Sf400427 | Parcel: 0503206004
2014/08/251600097727731 Boylston St Boston MaMario Hernandez
SCORE
97
22842288 Dorchester Dorchester Ma
Replace two set of metal stairs 36 height undating code of mass with 2 sopports column 32 heiht and metal hand railins prime paint and install
Date:  July 30, 2015
Value:   $4,500
Contractor: Mario Hernandez

Client: Adams Lower Mills Llc | Permit type: Short form bldg permit | Expiration date: January 30, 2016 | Current use: Other | Permit id: Sf500562 | Parcel: 1703552000
2015/07/3045009722842288 Dorchester Dorchester MaMario Hernandez
SCORE
97
2022 Lime St Boston Ma
Replaces only sq hadl bolts
Date:  August 20, 2014
Value:   $3,750
Contractor: Mario Hernandez

Client: Twenty Lime Llc | Permit type: Short form bldg permit | Expiration date: February 20, 2015 | Current use: Multi | Permit id: Sf397789 | Parcel: 0502346000
2014/08/203750972022 Lime St Boston MaMario Hernandez
SCORE
97
412 Perthshire Rd Brighton Ma
Remove and replaces existing sq head bolts at steps and platform &; railings.. And repair stair balance scrape all fire escape and paint and provided an affidavit certificated
Date:  February 20, 2015
Value:   $10,500
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: August 20, 2015 | Current use: Other | Permit id: Sf448808
2015/02/201050097412 Perthshire Rd Brighton MaMario Hernandez
SCORE
97
232234 Friend St Boston Ma
Change some bolt scrape and paint fire escape (2 floors)
Date:  December 2, 2013
Value:   $2,600
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: June 2, 2014 | Current use: Comm | Permit id: Sf309380 | Parcel: 0301658000
2013/12/02260097232234 Friend St Boston MaMario Hernandez
SCORE
97
6567 Charter St Boston Ma
Repair fire balconies fix all those supports brackets ans replaces all squeer heald bolts repair all which need to be repair fire balcony at sencond floor need to replaces all sq heald bolts and fix all supports brackets scrape all those 4 fire balconies and paint and provided an affidavit certificated for 5 years...
Date:  December 11, 2015
Value:   $20,500
Contractor: Mario Hernandez

Client: Trulli Alphonse J Trst | Permit type: Short form bldg permit | Expiration date: June 11, 2016 | Current use: Other | Permit id: Sf546916 | Parcel: 0302001000
2015/12/1120500976567 Charter St Boston MaMario Hernandez
SCORE
97
182 H St South Boston Ma
New frabrication of 3 floor metal deck 12ftx with sopports 4x4-1/4 post and concrete foundry and metal grate floor. All meatal handdrills would be 42" hg all work would be fabricated at the welding places in 69 norman st everett ma. And all work would be prime paint and installed
Date:  October 29, 2015
Value:   $24,500
Contractor: Mario Hernandez

Client: Hanley Catherine M | Permit type: Long form/alteration permit | Expiration date: April 29, 2016 | Current use: Other | Permit id: Alt531594 | Parcel: 0701935000
2015/10/292450097182 H St South Boston MaMario Hernandez
SCORE
97
1 Saint Botolph St Boston Ma
Replaces gratings the first floor and sencond floor on thase fire escape and change some screws
Date:  May 13, 2014
Value:   $2,900
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: November 13, 2014 | Current use: Multi | Permit id: Sf362161 | Parcel: 0402369000
2014/05/132900971 Saint Botolph St Boston MaMario Hernandez
SCORE
97
311 Beacon St Boston Ma
Fire escape repair replaces all square botls screp and paint 2 floors
Date:  April 4, 2014
Value:   $6,800
Contractor: Mario Hernandez

Client: Abacus | Permit type: Short form bldg permit | Expiration date: October 4, 2014 | Current use: 1-4fam | Permit id: Sf349953 | Parcel: 0503311000
2014/04/04680097311 Beacon St Boston MaMario Hernandez
SCORE
97
Date:  October 27, 2014
Contractor: Mario Hernandez

Permit status: Issued | Current use: Commercial | Permit id: 14042-10000-209
2014/10/27097275 Center Way Los Angeles Ca 90045Mario Hernandez
SCORE
97
Date:  January 14, 2015
Contractor: Mario Hernandez

Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10001-209
2015/01/14097275 Center Way Los Angeles Ca 90045Mario Hernandez
SCORE
97

Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10001-209
2015/01/14097275 Center Way Los Angeles Ca 90045 San Diego CaMario Hernandez
SCORE
97

Permit status: Permit finaled | Current use: Commercial | Permit id: 14042-10000-209
2014/10/27097275 Center Way Los Angeles Ca 90045 San Diego CaMario Hernandez
SCORE
97

Permit status: Permit finaled | Current use: Commercial | Permit id: 17043-10000-022
2017/05/040973 World Way Los Angeles Ca 90045 San Diego CaMario Hernandez
SCORE
97
Date:  October 5, 2005
Contractor: Mario Hernandez

Client: Angel Vargas | Client Address: 2748 Paulding Avenue Bronx Ny 10469 | Client Phone: (718) 654-2848 | Client Company: Ave Of St John Holding Corp | Permit status: Initial | Permit id: 200996388
2005/10/05097905 Avenue St Johns Bronx Ny 10455Mario Hernandez
SCORE
97
Date:  October 5, 2005
Contractor: Mario Hernandez

Client: Angel Vargas | Client Address: 2748 Paulding Avenue Bronx Ny 10469 | Client Phone: (718) 654-2848 | Client Company: Ave Of St John Holding Corp | Permit status: Initial | Permit id: 200996388
2005/10/05097905 Avenue St Johns Bronx NyMario Hernandez
SCORE
97
Date:  October 13, 1994
Contractor: Mario Hernandez

Client: James Mccann | Client Address: 2309 Seventh Avenue Nyc Ny 10030 | Client Phone: (212) 918-9844 | Permit status: Initial | Permit id: 100894524
1994/10/130972309 Seventh Avenue Manhattan Ny 10030Mario Hernandez
SCORE
97
Date:  October 13, 1994
Contractor: Mario Hernandez

Client: James Mccann | Client Address: 2309 Seventh Avenue Nyc Ny 10030 | Client Phone: (212) 918-9844 | Permit status: Initial | Permit id: 100894524
1994/10/130972309 Seventh Avenue Manhattan NyMario Hernandez
SCORE
97
Date:  March 15, 2006
Contractor: Mario Hernandez

Client: Gladys Rivera | Client Address: 1312 Purdy Street Bronx Ny 10462 | Client Phone: (718) 931-7873 | Client Company: Na | Permit status: Initial | Permit id: 201031980
2006/03/150971312 Purdy Street Bronx Ny 10462Mario Hernandez
SCORE
97
Date:  March 15, 2006
Contractor: Mario Hernandez

Client: Gladys Rivera | Client Address: 1312 Purdy Street Bronx Ny 10462 | Client Phone: (718) 931-7873 | Client Company: Na | Permit status: Initial | Permit id: 201031980
2006/03/150971312 Purdy Street Bronx NyMario Hernandez
SCORE
97

Client: Jose Martinez | Client Address: 239 West 14th St. Ny Ny 10011 | Client Phone: (212) 929-7873 | Client Company: Spanish Benevolent Socity | Permit status: Initial | Permit id: 100383201
1992/05/14097239 West 14 Street Manhattan Ny 10011Mario Hernandez
SCORE
97
Date:  May 14, 1992
Contractor: Mario Hernandez

Client: Jose Martinez | Client Address: 239 West 14th St. Ny Ny 10011 | Client Phone: (212) 929-7873 | Client Company: Spanish Benevolent Socity | Permit status: Initial | Permit id: 100383201
1992/05/14097239 West 14 Street Manhattan NyMario Hernandez
SCORE
97
5 Beacon St Boston Ma
5 ffloor fire escape repair replaces all square head bolts at all fire escape stairs and balconies and fix some supports brackets repair all which need to be repair and provided an affidavit and scrape and paint all fire escape
Date:  September 20, 2016
Value:   $12,850
Contractor: Mario Hernandez

Client: Five Twenty Beacon | Permit type: Short form bldg permit | Expiration date: March 20, 2017 | Current use: Multi | Permit id: Sf631061 | Parcel: 0503698000
2016/09/2012850975 Beacon St Boston MaMario Hernandez
SCORE
97
9999b Hudson St Boston Ma
Fabricate 2 temporary stairs at front of building and install metal grating at those 3 existing fire balconies and extend 9 more at top of those existing wrought iron railings at front and back back of building fabricate 3 temporary stairs at front of those balconies those stairs will be with grating steps and railings at both sides
Date:  October 12, 2016
Value:   $27,280
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: April 12, 2017 | Current use: Other | Permit id: Sf646378
2016/10/1227280979999b Hudson St Boston MaMario Hernandez
SCORE
97
9 Cooper St Boston Ma
Remove old treads and old platforms grating and re-install new treads & platforms at each floor and each building 9 & 7 cooper st all connection clips and treads & grating floor will be installed with screws and prime and paint. And we provide an affidavit certificate for 5 years inspection..
Date:  April 21, 2016
Value:   $18,500
Contractor: Mario Hernandez

Client: Statires Realty Llc | Permit type: Short form bldg permit | Expiration date: October 21, 2016 | Current use: Other | Permit id: Sf582857 | Parcel: 0301294000
2016/04/2118500979 Cooper St Boston MaMario Hernandez
SCORE
97
227227a Harrison Av Boston Ma
Fire balconies repair at front of the building replaces all sq head bolt and scrape all those 3 fire balconies and paint and provide an affidavit certificate.
Date:  November 4, 2016
Value:   $6,800
Contractor: Mario Hernandez

Client: Lim Yuen Sim Ng | Permit type: Short form bldg permit | Expiration date: May 4, 2017 | Current use: Multi | Permit id: Sf653503 | Parcel: 0305471000
2016/11/04680097227227a Harrison Av Boston MaMario Hernandez
SCORE
97
85 Park Dr Boston Ma
Repair fire balconies replaces all existing square head bolts and scrape and paint and provide affidavit certificate
Date:  July 21, 2016
Value:   $9,400
Contractor: Mario Hernandez

Client: Fenview Condo Trust | Permit type: Short form bldg permit | Expiration date: January 21, 2017 | Current use: Multi | Permit id: Sf615612 | Parcel: 0504259000
2016/07/2194009785 Park Dr Boston MaMario Hernandez
SCORE
97
1117 East St Boston Ma
5 floor fire escape repair replaces all existing sq head bolts at all fire escape stairs & balconies and railings and fix all supports brackets and repair all which need to be repair and replaces some grating floor and scrape and paint all fire escape and provide an affidavit certificate
Date:  May 19, 2016
Value:   $16,550
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: November 19, 2016 | Current use: Other | Permit id: Sf593581
2016/05/1916550971117 East St Boston MaMario Hernandez
SCORE
97
59 Broad St Boston Ma
Fire escape repair add 3 brackets supports and fix 3 of those brackets and replaces all squared head bold which need to be replaces fix all those areas which need to be fix and scrape and paint all fire escape and provide and affidavit.
Date:  April 3, 2017
Value:   $8,000
Contractor: Mario Hernandez

Client: Nine Broad St Llc | Permit type: Short form bldg permit | Expiration date: October 3, 2017 | Current use: Other | Permit id: Sf693467 | Parcel: 0303868010
2017/04/0380009759 Broad St Boston MaMario Hernandez
SCORE
97
9 East St Boston Ma
Fire escape repair at back of the building will be repair all areas which need to be repair and replaces all squared head bolts and fix all those supports brackets and scrape and paint and provide an affidavit
Date:  February 21, 2017
Value:   $6,000
Contractor: Mario Hernandez

Client: Hrt East Llc | Permit type: Short form bldg permit | Expiration date: August 21, 2017 | Current use: Other | Permit id: Sf682272 | Parcel: 0304320000
2017/02/216000979 East St Boston MaMario Hernandez
SCORE
97
243245 Dorchester S South Boston Ma
Repair fire escape which is currently broken we will fix it and fix the first level balcony which is damaged to correct violation v335900
Date:  March 15, 2017
Value:   $7,800
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: September 15, 2017 | Current use: Mixed | Permit id: Sf688713 | Parcel: 0700513000
2017/03/15780097243245 Dorchester S South Boston MaMario Hernandez
SCORE
97
74 Tyler St Boston Ma
Fabricate a new 4 floor fire escape steel deck with stairs up &; down deck 8w x 23 long and 7 supports columns with concrete footing and metal railings all work will be primer paint back and install fire escape would be fabricate by the professional engineer design
Date:  January 18, 2017
Value:   $38,000
Contractor: Mario Hernandez

Client: Seventy 4 - 76 Tyler St | Permit type: Long form/alteration permit | Expiration date: July 18, 2017 | Current use: Multi | Permit id: Alt665947 | Parcel: 0305134000
2017/01/18380009774 Tyler St Boston MaMario Hernandez
SCORE
97
9496a Tyler St Boston Ma
Fire escape repair at front of the building will be 3 fire balconies at front and 3 fire balconies at the side is the building will be repair all areas which need to be repairs and replaces all sq head bolts and scrape and paint and provide an affidavit certificate.
Date:  January 18, 2017
Value:   $14,000
Contractor: Mario Hernandez

Permit type: Short form bldg permit | Expiration date: July 18, 2017 | Current use: Multi | Permit id: Sf673694
2017/01/1814000979496a Tyler St Boston MaMario Hernandez
SCORE
97
6 Leroy Pl San Francisco Ca
Repair in kind and improvements to extg deck.
Date:  July 20, 2017
Contractor: Mario Hernandez

Permit type: Building permit | Current use: Apartments | Permit id: #201707202533
2017/07/200976 Leroy Pl San Francisco CaMario Hernandez
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.