QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 69 3719 2nd Street Se Washington Dc The perimeter of the building will be excavated to install waterproofing, a drainage board, and an underdrain. The underdain must tie into a privately maintained existing storm drain in front of the building. To do so, excavation in public space is required. Date: August 11, 2017 Contractor: Juan Pablo GarzonClient: Keyoun Hamilton | Permit type: Excavation; storm lateral conn to 4" (trench) | Permit status: Revise and resubmit | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 69 3723 2nd Street Se Washington Dc The perimeter of the building must be excavated in order to install waterproofing, a drainage board, and an underdrain. The underdrain must tie in to an existing, privately maintained area drain in the front of the building. To do so, excavation along the front of the building in public space will be necessary. Date: August 11, 2017 Contractor: Juan Pablo GarzonClient: Keyoun Hamilton | Permit type: Excavation; water proofing in public space | Permit status: Revise and resubmit | Expiration date: March 1, 2018 | Permit id: 0 | |||||
SCORE 69 Contractor: Juan Pablo GarzonPermit status: 10 | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 69 Contractor: Juan Pablo GarzonPermit status: 10 | Expiration date: March 1, 2018 | Permit id: 0 | |||||
SCORE 69 3719 2nd Street Se Washington Dc The perimeter of the building will be excavated to install waterproofing, a drainage board, and an underdrain. The underdain must tie into a privately maintained existing storm drain in front of the building. To do so, excavation in public space is required. Contractor: Juan Pablo GarzonPermit status: Revise and resubmit | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 69 3723 2nd Street Se Washington Dc The perimeter of the building must be excavated in order to install waterproofing, a drainage board, and an underdrain. The underdrain must tie in to an existing, privately maintained area drain in the front of the building. To do so, excavation along the front of the building in public space will be necessary. Contractor: Juan Pablo GarzonPermit status: Revise and resubmit | Expiration date: March 1, 2018 | Permit id: 0 |