QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 82 1 Huntington Ave Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa 13. All impairments shall be coordinated with the buildings listed impairment coordinator (per nfpa 241) so that only one zone is impaired. Date: September 19, 2016 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk627595 | |||||
SCORE 82 19 Myrtle St Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa 13 bfd paid detail required -- 1;officer &; 3 firefighters with pump; Date: September 19, 2016 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk624831 | |||||
SCORE 82 855 Commonwealth Av Boston Ma Replace existing electric fire pump and controller with new of same rating and capacity. Bfd paid detail required - 1 officer &; 4 firefighters w pump; Date: September 21, 2016 Contractor: Jeffrey A FergusonClient: Boston University | Permit type: Bfd sprinkler system | Permit id: Sprk627622 | Parcel: 2100397000 | |||||
SCORE 82 1135 Tremont St Boston Ma Coordinate sprinkler impairment with the building listed impairment coordinator (required by nfpa 241) so that only one zone shall be impaired. Date: September 22, 2016 Contractor: Jeffrey A FergusonClient: Northeastern University | Permit type: Bfd sprinkler system | Permit id: Sprk631295 | Parcel: 0902704021 | |||||
SCORE 82 25 Mission Park Dr Boston Ma Modify existing wet sprinkler system for new ceiling and partition layout for handicap access upgrades to unit. Date: October 26, 2016 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk647872 | |||||
SCORE 82 1 Ashford St Allston Ma Modify existing wet sprinkler system for new ceiling and partition layout for physical therapy lab space. Date: October 26, 2016 Contractor: Jeffrey A FergusonClient: Trustees Of Boston Univ | Permit type: Bfd sprinkler system | Permit id: Sprk647715 | Parcel: 2100415000 | |||||
SCORE 82 595 Commonwealth Av Boston Ma Installation per 7 cmr and nfpa 13 only one zone shall be impaired in the building at any given time Date: August 1, 2016 Contractor: Jeffrey A FergusonClient: Trustees Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk613565 | Parcel: 0503991000 | |||||
SCORE 82 99 Summer St Boston Ma Only one zone shall be impaired at any given time in the building coordinate impairment with the buildings listed impairment coordinator. Date: August 19, 2016 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk619460 | Parcel: 0304576000 | |||||
SCORE 82 Ashburton Pl Boston Ma Modify existing sprinkler system for new tenant on 7th 8th and 9th floors. Existing sprinkler heads to be turned up for temporary protection while work being done on floors. Date: September 7, 2016 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk621925 | |||||
SCORE 82 Ashburton Pl Boston Ma Modify existing sprinkler system for new ceiling and partition layout on the 1st floor. Existing sprinkler heads to be turned up for temporary protection while work being done on floor. Date: September 9, 2016 Contractor: Jeffrey A FergusonClient: Faros Ashburton Llc | Permit type: Bfd sprinkler system | Permit id: Sprk625713 | Parcel: 0302814000 | |||||
SCORE 82 71 E Concord St Boston Ma Installation and testing shall be in-accordance with nfpa bfd paid detail required -- 1 officer &; 3 ffs w pump; Date: August 18, 2016 Contractor: Jeffrey A FergusonClient: Boston University Trsts | Permit type: Bfd sprinkler system | Permit id: Sprk618317 | Parcel: 0801420010 | |||||
SCORE 82 595 Commonwealth Av Boston Ma Installation per 7 cmr and nfpa 13... Only one zone shall be impaired at any given time within the building Date: August 1, 2016 Contractor: Jeffrey A FergusonClient: Trustees Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk613567 | Parcel: 0503991000 | |||||
SCORE 82 3 Brookline Av Boston Ma Relocate existing fire department connection and fp test header aprox. 35 for repairs and waterproofing to concrete deck at east campus main entrance. Coordinate impairment with the building owners listed;nfpa 241 impairment coordinator. Date: April 1, 2017 Contractor: Jeffrey A FergusonClient: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk683345 | Parcel: 0401862000 | |||||
SCORE 82 2601 Beacon St Brighton Ma Replace existing sprinkler mains and line piping with new schedule galvanized pipe due to corrosion issues. Per dfc: any hot work will require a separate permit (hot work permit);w fire detail Date: April 7, 2017 Contractor: Jeffrey A FergusonClient: Boston College Trs Of | Permit type: Bfd sprinkler system | Permit id: Sprk687323 | Parcel: 2102473001 | |||||
SCORE 82 1 Waverly Pl Boston Ma Replace defective sprinkler control valves with new. Remove replace (4) sprinkler heads per floor and submit for testing per nfpa 25 perform internal exam of sprinkler system piping while removing heads for testing. Date: April 24, 2017 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk694555 | |||||
SCORE 82 41 Avenue Louis Past Boston Ma Replace two defective os&y on fire service before fire pump. Bfd paid detail required Date: May 5, 2017 Contractor: Jeffrey A FergusonClient: Emmanuel College Trustees | Permit type: Bfd sprinkler system | Permit id: Sprk694556 | Parcel: 0401847000 | |||||
SCORE 82 610626 Beacon St Boston Ma Install temporary fire pump test header in pump room to permit testing of fire pump while building exterior being renovated. Directed by lt. Fitzpatrick to pull permit for temporary test header. Work separate from building renovation project. Work was already done on 5 10 17. Date: May 11, 2017 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk705621 | |||||
SCORE 82 602 Commonwealth Av Boston Ma Coordinate impairment with buildings listed nfpa 241 impairment coordinator. Bfd paid detail required 1 officer &; 3 firefighters w pump - detail required while system is down until tested approved and back in service Date: May 11, 2017 Contractor: Jeffrey A FergusonClient: Boston University Trsts | Permit type: Bfd sprinkler system | Permit id: Sprk697171 | Parcel: 2100351000 | |||||
SCORE 82 836 Beacon St Boston Ma Replace defective 4" butterfly control valves on the system and supply side of the fire service backflow prevention device. Bfd paid detail required Date: May 22, 2017 Contractor: Jeffrey A FergusonClient: Boston University Trsts Of | Permit type: Bfd sprinkler system | Permit id: Sprk699742 | Parcel: 2100192000 | |||||
SCORE 82 Date: May 30, 2017 Contractor: Jeffrey A FergusonClient: Boston College Trs Of | Permit type: Bfd sprinkler system | Permit id: Sprk707503 | Parcel: 2102473001 | |||||
SCORE 82 862 Beacon St Boston Ma Replace existing fire pump and controller with new of same size and capacity. Bfd paid detail required - 1 officer &; 3 firefighters w pump Date: May 30, 2017 Contractor: Jeffrey A FergusonClient: Trustees Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk705988 | Parcel: 2100213000 | |||||
SCORE 82 11 New Whitney St Boston Ma Only one zone shall be impaired at any given time within the building coordinate impairment with the buildings owners nfpa 241 impairment coordinator. Date: June 1, 2017 Contractor: Jeffrey A FergusonClient: Rth Mission Park Realty | Permit type: Bfd sprinkler system | Permit id: Sprk709296 | Parcel: 1000290000 | |||||
SCORE 82 11 New Whitney St Boston Ma Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and isd approved plans. Sprinkler impairment shall be coordinated with the buildings nfpa 241 impairment coordinator so that no other sprinkler zone is impaired during this scheduled impairment. Date: July 11, 2017 Contractor: Jeffrey A FergusonClient: Rth Mission Park Realty | Permit type: Bfd sprinkler system | Permit id: Sprk728623 | Parcel: 1000290000 | |||||
SCORE 82 1 Waverly Pl Boston Ma Sprinkler impairment shall be coordinated with the buildings nfpa 241 impairment coordinator. Bfd paid detail required Date: June 27, 2017 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk719071 | |||||
SCORE 82 635 Commonwealth Av Boston Ma Modify existing wet sprinkler system for new ceiling and partition layout 5th floor kumar lab space. Date: November 16, 2016 Contractor: Jeffrey A FergusonClient: Boston University Trs Of | Permit type: Bfd sprinkler system | Permit id: Sprk647713 | Parcel: 0504089000 | |||||
SCORE 82 805 Huntington Av Boston Ma Modify existing wet sprinkler system for new ceiling and partition layout for handicap access upgrades. Date: November 21, 2016 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk656926 | |||||
SCORE 82 1 Francis St Boston Ma Furnish and install new fire department connection for west campus fire loop. New fdc to be located after discharge of fire pumps that supply fire loop. New connection to enable fire loop to be supported by fdc. Date: December 15, 2016 Contractor: Jeffrey A FergusonClient: Beth Israel Deaconess Inc | Permit type: Bfd sprinkler system | Permit id: Sprk663264 | Parcel: 0401964000 | |||||
SCORE 82 7 Lansdowne St Boston Ma Furnish and install new double-interlock preaction system at 4th floor verizon space. Existing wet system to remain is service until new preaction system is installed. Date: January 30, 2017 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk672904 | |||||
SCORE 82 185 Pilgrim Rd Boston Ma Replace corroded section of 8" fire service before first valve in the sprinkler valve room at the farr building west campus best israel deaconess medical center. Bfd paid detail required - 1 officer &; 3 firefighters w pump Date: February 27, 2017 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk675681 | |||||
SCORE 82 11 New Whitney St Boston Ma Modify existing wet sprinkler system for partition and ceiling changes for handicap access upgrades to unit. Date: February 17, 2017 Contractor: Jeffrey A FergusonClient: Rth Mission Park Realty | Permit type: Bfd sprinkler system | Permit id: Sprk674794 | Parcel: 1000290000 | |||||
SCORE 82 2609 Beacon St Brighton Ma Perform necessary maintenance on fire pump. Work to include full repack of fire pump retaining glands replacement of shaft sleeves and pump end bearings. Date: December 15, 2016 Contractor: Jeffrey A FergusonClient: Boston College Trs Of | Permit type: Bfd sprinkler system | Permit id: Sprk663053 | Parcel: 2102473001 | |||||
SCORE 82 37 Buswell St Boston Ma Replace existing back-flow prevention device on fire service with new due to maintenance issues. Date: February 2, 2017 Contractor: Jeffrey A FergusonClient: Boston University Trsts Of | Permit type: Bfd sprinkler system | Permit id: Sprk673153 | Parcel: 2100248000 | |||||
SCORE 82 805 Huntington Av Boston Ma Modify existing wet sprinkler system in unit 205 for handicap access upgrades. Date: November 21, 2016 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk658011 | |||||
SCORE 82 6 Albany St Boston Ma Emergency repair to fire service pipe inside of building before first control valve. Advised district 4 fire chief of impairment. Work completed and district advised systems back in service. Fire detector system must be monitored during impairment Date: December 8, 2016 Contractor: Jeffrey A FergusonClient: Six- Albany Medical Realty | Permit type: Bfd sprinkler system | Permit id: Sprk659748 | Parcel: 0801066200 | |||||
SCORE 82 7 Albany St Boston Ma Relocate two sprinkler heads for demo and removal of a cold box (walk-in cooler). Date: March 3, 2017 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk676521 | |||||
SCORE 82 25 Mission Park Dr Boston Ma Modify existing wet sprinkler system for modifications to ceiling and partition layout for handicap access upgrades to unit. (no more than one floor off at a time - comply with requirement of nfpa 13 (2013)) Date: March 20, 2017 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk681912 | |||||
SCORE 82 8 Harrison Ave Boston Ma Convert existing wet sprinkler system currently protecting generator room to a double action preaction system. Date: December 15, 2016 Contractor: Jeffrey A FergusonPermit type: Bfd sprinkler system | Permit id: Sprk663278 | |||||
SCORE 82 1 Deaconess Rd Boston Ma Replace corroded trim on main wet alarm valve. Bfd paid detail required - 1 officer &; 3 firefighters w pump Date: February 21, 2017 Contractor: Jeffrey A FergusonClient: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk672914 | Parcel: 0401954001 |