QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 1001 4th Street Sw Washington Dc 4 excavations: sewer lateral connection over 4 pipe (trench), storm lateral conn over 4 (trench), water lateral conn over 2 pipe (trench), water meter manhole (over 2 pipe) description of proposed work in detail: o james g. Davis construction, along with w. B. Hopke, need to install the following within the public right of way: 2 new sanitary manholes on 4th st sw, 1 new 6" sanitary cleanout on 4th st sw, 8" lateral pipe to connect existing sanitary line to the new proposed structures on 4th st sw, 2 storm drain manholes on 4th st sw, 15" rcp pipe to connect existing storm line to the new proposed structures and vaults on 4th st sw, 4" domestic water line connecting to the existing water line on 4th st sw, 6" fire safety line connecting to existing water line on 4th st sw, relocate existing fire hydrant approximately 5 north on makemie pl sw, water meter manhole=2, sewer lateral connection over 4 pipe (trench)= 90ft x 8ft, storm lateral connection over 4= 82ft x 15ft, water lateral con Date: September 2, 2016 Contractor: James G. Davis Constructor CorporationClient: Waterfront 1001 4th Street, Llc 4th Street, Llc | Permit type: Excavation; clean out | Permit status: Permit expired | Expiration date: November 14, 2016 | Permit id: Pa168510-R1 | |||||
SCORE 59 1001 4th Street Sw Washington Dc 4 excavations: sewer lateral connection over 4 pipe (trench), storm lateral conn over 4 (trench), water lateral conn over 2 pipe (trench), water meter manhole (over 2 pipe) description of proposed work in detail: o james g. Davis construction, along with w. B. Hopke, need to install the following within the public right of way: 2 new sanitary manholes on 4th st sw, 1 new 6" sanitary cleanout on 4th st sw, 8" lateral pipe to connect existing sanitary line to the new proposed structures on 4th st sw, 2 storm drain manholes on 4th st sw, 15" rcp pipe to connect existing storm line to the new proposed structures and vaults on 4th st sw, 4" domestic water line connecting to the existing water line on 4th st sw, 6" fire safety line connecting to existing water line on 4th st sw, relocate existing fire hydrant approximately 5 north on makemie pl sw, water meter manhole=2, sewer lateral connection over 4 pipe (trench)= 90ft x 8ft, storm lateral connection over 4= 82ft x 15ft, water lateral con Date: June 1, 2016 Contractor: James G. Davis Constructor CorporationClient: Waterfront 1001 4th Street, Llc 4th Street, Llc | Permit type: Excavation; clean out | Permit status: Issued | Expiration date: September 15, 2016 | Permit id: Pa168510 |