QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 92 Mary Ave Nw Seattle Wa Wiring of adu and single car garage, per construction permit 6128750. New 100amp sub-panel ( ft from 200a main house panel) will serve outlets, lights and appliances. Heat, hot water, stovetop will be gas. A rooftop 2100w (8a) pv system will input to a 240v breaker, and will run to a production meter on the side of the garage (per scl interconnection requirements). 6/9/08 mvc: renewal. 5/6/09 jnl - about to expire letter sent 6/8/09 jcb; renew permit Date: June 11, 2007 Contractor: Huber MichaelPermit type: Electrical | Permit status: Permit closed | Completion date: February 10, 2010 | Expiration date: June 10, 2010 | Current use: Single family / duplex | Permit id: 6142580 |