QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 67 1057 Thomas Jefferson Street Nw Washington Dc The national park service (nps) has been provided funding to repair lock 3 and provide maintenance operations to lock 4. In order for the contractors to gain access to both locks, a portion of the entrances will be required to be located where pedestrian walkways (brick paver) exists. In addition, lock 3 will require occupying a portion of the sidewalk on the west side of 30th street nw in order to install sheeting and shoring required during the removal and replacement of the lock 3 stones. Lock 3: complete dis-assembly and reconstruction of the lock 3 is necessary to repair the foundation and place existing stones (or duplicates) back in their original place (in-kind). Disturbance within the existing right-of-way is 2 s. F. And will require the removal of the brick walkway and one existing tree. During construction, either temporary asphalt or the typical gravel construction entrance will be located in this area. The access is located on 30th street, north of the lock 3 and the 30th s Date: April 27, 2016 Contractor: Gregory KnieslerPermit type: Paving; sidewalk(s), fixture; fence to 42" (open design), landscaping; tree planting, landscaping; tree removal, excavation; sheeting & shoring (for buildings) | Permit status: Revise and resubmit | Expiration date: April 28, 2017 | |||||
SCORE 67 1057 Thomas Jefferson Street Nw Washington Dc The national park service (nps) has been provided funding to repair lock 3 and provide maintenance operations to lock 4. In order for the contractors to gain access to both locks, a portion of the temporary construction entrances will be required to be located where pedestrian walkways (brick paver) exists. Lock 3: complete dis-assembly and reconstruction of the lock 3 is necessary to repair the foundation and place existing stones (or duplicates) back in their original place (in-kind). Temporary disturbance within the existing right-of-way is 2 s. F. And will require the removal of the brick walkway, provide a curb cut for vehicles, and remove one existing tree which a new one will be installed. During construction, either temporary asphalt or the typical temporary gravel construction entrance will be located in this area. The access is located on 30th street, north of the lock 3 and the 30th street bridge over the lock. Lock 4: this lock does not require significant work, the foundati Contractor: Gregory KnieslerPermit status: Approved (pending payment | Expiration date: September 16, 2017 | Permit id: 0 | |||||
SCORE 67 1057 Thomas Jefferson Street Nw Washington Dc The national park service (nps) has been provided funding to repair lock 3 and provide maintenance operations to lock 4. In order for the contractors to gain access to both locks, a portion of the temporary construction entrances will be required to be located where pedestrian walkways (brick paver) exists. Lock 3: complete dis-assembly and reconstruction of the lock 3 is necessary to repair the foundation and place existing stones (or duplicates) back in their original place (in-kind). Temporary disturbance within the existing right-of-way is 2 s. F. And will require the removal of the brick walkway, provide a curb cut for vehicles, and remove one existing tree which a new one will be installed. During construction, either temporary asphalt or the typical temporary gravel construction entrance will be located in this area. The access is located on 30th street, north of the lock 3 and the 30th street bridge over the lock. Lock 4: this lock does not require significant work, the foundati Date: April 27, 2016 Contractor: Gregory KnieslerClient: Nps Co Gregory Kniesler | Permit type: Paving; sidewalk(s), landscaping; tree planting, landscaping; tree removal, landscaping; new tree space(s) | Permit status: Issued | Expiration date: January 19, 2017 | Permit id: Pa136929 | |||||
SCORE 67 1057 Thomas Jefferson Street Nw Washington Dc The national park service (nps) has been provided funding to repair lock 3 and provide maintenance operations to lock 4. In order for the contractors to gain access to both locks, a portion of the temporary construction entrances will be required to be located where pedestrian walkways (brick paver) exists. Lock 3: complete dis-assembly and reconstruction of the lock 3 is necessary to repair the foundation and place existing stones (or duplicates) back in their original place (in-kind). Temporary disturbance within the existing right-of-way is 2 s. F. And will require the removal of the brick walkway, provide a curb cut for vehicles, and remove one existing tree which a new one will be installed. During construction, either temporary asphalt or the typical temporary gravel construction entrance will be located in this area. The access is located on 30th street, north of the lock 3 and the 30th street bridge over the lock. Lock 4: this lock does not require significant work, the foundati Date: January 20, 2017 Contractor: Gregory KnieslerClient: Nps C O Gregory Kniesler | Permit type: Paving; sidewalk(s), landscaping; tree planting, landscaping; tree removal, landscaping; new tree space(s) | Permit status: Permit expired | Expiration date: March 20, 2017 | Permit id: Pa136929-R1 |