Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 5 17th St Nw, Washington, Dc 20006 Reovations, alterations and repoaris to gwu corcoran school of arts and design as shown and noted for construction as phase 1. 3, ada work includes addition and or renovations to interior ramps on levels b2,b1, 1st & 2nd fls. Modernization of an existing elevator, elevator cab, machine upgrades, elev. Pit. Addition of ada seating in exist auditorium, add new egress corridor in auditorium, construction of new metal stair in courtyard,enlargement of 2 exist. Egress stairs,retrofit an exist metal egress stair for code compliance. Addition of 3 combination standpipes as infrastructure for fully sprinklered building, new fire pump, incoming water fire service, new fire detection and alarm system and related infrastructure including addressable fire alarm control panel, visual notification devices, manual pull stations smoke sensors, removal of the existing fire alarm sys. Assoc. Mechanical, electrical, plumbing work in assoc. With all plan scopes shown on the mech. Plumb., elect., fire prote Date: November 2, 2016 Contractor: George Washingt University; John Giuseppe Ramco Client: George Washington University | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1605229 |