QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 49 Compton Dr, Asheville, Nc 28806 July 30, 2008 3:50:42 pm ssalyer. Commercial grading & zoning for oil wasting area in horse pasture near back of property for eliada home; owner stated he has emailed site plan to mccray and john gavin, no site plan attached with application submittal;sls; approval of the grading permit is pending until the following have been accomplished: 1. Contractor picks up the approved plan from the development services center. 2. Approved plan is posted at the construction site. 3. Preliminary grading and erosion control inspection has been held, and the erosion control devices have been accepted as installed properly. Engineering inspections requests must be made at least 24 hours in advance of inspections. Inspector assigned to this project is danny guthrie who can be reached at redacted phone number. Date: August 5, 2008 Contractor: Fairview ExcavatingClient: Eliada Home Horse Pasture | Permit type: Planning level i | Permit status: Issued | Current use: Development | Permit id: 08-04467 | Parcel: 20436 |