QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 64 1159 E 1st Ave, Salt Lake City, Ut, 84103 4109 Project description for cement work at jones/ hummel residence 1159 e. 1st ave slc, ut. 84103 1. Replace cement stairs that lead from the sidewalk to grade of house (photo 1). Remove existing broken and damaged concrete steps and pour new, grey concrete steps to replicate as closely as possible existing steps. Concrete edges of steps will not be removed or changed. 2. Replace cement steps that lead from the grade of house to porch level (photo 2). Remove existing, broken and damaged concrete steps and pour new, grey concrete steps to replicate as closely as possible existing steps. Stone terraced edges of steps will not be removed or changed. 3. Remove existing culvert that goes over city gutter and leads to driveway (photo 3). Replace with new metal culvert tube and new concrete layer to as closely as possible replicate existing culvert. 4. Remove all existing asphalt for circular driveway (photo 4). Pour concrete for east side of driveway adding wider area for parking on e/ne side of Date: April 8, 2015 Contractor: Ezra Thomas Jonesconcrete Work At 1159Permit type: Driveway | Permit status: Pass | Completion date: April 21, 2015 | Current use: Residential | Permit id: Bld2015-02318 | |||||
SCORE 64 1159 E 1st Ave Salt Lake City, Ut 84103 4109 Project description for cement work at jones/ hummel residence 1159 e. 1st ave slc, ut. 84103 1. Replace cement stairs that lead from the sidewalk to grade of house (photo 1). Remove existing broken and damaged concrete steps and pour new, grey concrete steps to replicate as closely as possible existing steps. Concrete edges of steps will not be removed or changed. 2. Replace cement steps that lead from the grade of house to porch level (photo 2). Remove existing, broken and damaged concrete steps and pour new, grey concrete steps to replicate as closely as possible existing steps. Stone terraced edges of steps will not be removed or changed. 3. Remove existing culvert that goes over city gutter and leads to driveway (photo 3). Replace with new metal culvert tube and new concrete layer to as closely as possible replicate existing culvert. 4. Remove all existing asphalt for circular driveway (photo 4). Pour concrete for east side of driveway adding wider area for parking on e/ne side of Date: April 8, 2015 Contractor: Ezra Thomas Jonesconcrete Work At 1159Permit type: Driveway | Permit status: Pass with conditions | Completion date: April 21, 2015 | Current use: Residential | Permit id: Bld2015-02318 | |||||
SCORE 64 1159 E 1st Ave, Salt Lake City, Ut, 841034109 Project description for cement work at jones hummel residence 1159 e. 1st ave slc, ut. 84103 1. Replace cement stairs that lead from the sidewalk to grade of house (photo 1). Remove existing broken and damaged concrete steps and pour new, grey concrete steps to replicate as closely as possible existing steps. Concrete edges of steps will not be removed or changed. 2. Replace cement steps that lead from the grade of house to porch level (photo 2). Remove existing, broken and damaged concrete steps and pour new, grey concrete steps to replicate as closely as possible existing steps. Stone terraced edges of steps will not be removed or changed. 3. Remove existing culvert that goes over city gutter and leads to driveway (photo 3). Replace with new metal culvert tube and new concrete layer to as closely as possible replicate existing culvert. 4. Remove all existing asphalt for circular driveway (photo 4). Pour concrete for east side of driveway adding wider area for parking on e ne side of Date: April 8, 2015 Contractor: Ezra Thomas Jonesconcrete Work At 1159Permit type: Driveway | Permit status: Pass | Completion date: April 21, 2015 | Current use: Residential | Permit id: Bld2015-02318 | |||||
SCORE 64 1159 E 1st Ave Salt Lake City, Ut 841034109 Project description for cement work at jones hummel residence 1159 e. 1st ave slc, ut. 84103 1. Replace cement stairs that lead from the sidewalk to grade of house (photo 1). Remove existing broken and damaged concrete steps and pour new, grey concrete steps to replicate as closely as possible existing steps. Concrete edges of steps will not be removed or changed. 2. Replace cement steps that lead from the grade of house to porch level (photo 2). Remove existing, broken and damaged concrete steps and pour new, grey concrete steps to replicate as closely as possible existing steps. Stone terraced edges of steps will not be removed or changed. 3. Remove existing culvert that goes over city gutter and leads to driveway (photo 3). Replace with new metal culvert tube and new concrete layer to as closely as possible replicate existing culvert. 4. Remove all existing asphalt for circular driveway (photo 4). Pour concrete for east side of driveway adding wider area for parking on e ne side of Date: April 8, 2015 Contractor: Ezra Thomas Jonesconcrete Work At 1159Permit type: Driveway | Permit status: Inspections | Completion date: April 21, 2015 | Current use: Residential | Permit id: Bld2015-02318 |