QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 93 Union St (105) Newton Ma Remove existing suspended ceiling system; remove two partion walls; install tile floor in bathroom; cover existing floor with plywood. Parcel: 61036 0009 |