Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 77 1805 11th St Boulder Co Interior remodel of suite a for gnip into general offce space. 2942 sq. Ft. And associated meps space is in mixed use building below residential. On 7 14 14 a resubmittal (after the permit was issued) has been taken in due to twitter purchasing gnip - the scope of this resubmittal is changes to mechanical, electrical, plumbing, and building (non-structural). Client: Canyon 1095.0 | Applicant: Edifice Builders Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: September 9, 2014 | Current use: Office - admini | |||||
SCORE 77 1805 11th St Boulder Co Suite a: interior non-structural demolition of interior finishes and non-loadbearing partitions in preparation for tenant remodel permitted separately (pmt2014-01779). No construction, demo only. Date: April 23, 2014 Contractor: Edifice Builders Inc Client: Canyon 1095.0 | Applicant: Edifice Builders Inc | Permit type: Demolition | Permit status: Iss | Current use: Office - admini | |||||
SCORE 77 54 Airport Bl Boulder Co Office remodel - interior remodel of existing technical office building to leave in gray-shell condition for future tenants. Scope includes demolition of existing non-structural walls and bulkheads, and electrical decomission of server room panels and minor new construction including drywall repair, new ceilings, and restoring the storefront to original appearance. Scope includes associated mep. Client: Highpoint | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2016-03504 | |||||
SCORE 77 47 Walnut St Boulder Co Suite 2 - interior tenant remodel of existing office space. Scope includes demo of non-load bearing partition walls, new partition walls, new lighting, additional mechanical equipment, ductwork, and reconfiguration of break room, reconfiguration of ada compliant menfoots room to include new urinal, and the addition of one sink in area #8. Client: Tierra | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2016-03915 | |||||
SCORE 77 25 55th St Boulder Co Tenant remodel to establish an outdoor community facilitation office. Area of work is approx. 4,5 sq. Ft. To include an open office area, break room, and meeting room. Scope of work includes associated meps. Proposed overhead door removed from scope due to minor modification implications of 55th street plaza pud. Client: P7 Upi | Permit type: Building, electrical, mechanical, plumbing, flood accessory/remodel | Permit status: Iss | Current use: Office - professional, remodel | Permit id: Pmt2016-04691 | |||||
SCORE 77 1805 11th St Boulder Co Interior remodel of suite a for gnip into general offce space. 2942 sq. Ft. And associated meps space is in mixed use building below residential. On 7 14 14 a resubmittal (after the permit was issued) has been taken in due to twitter purchasing gnip - the scope of this resubmittal is changes to mechanical, electrical, plumbing, and building (non-structural). Client: Canyon | Permit type: Building, electrical, mechanical, plumbing, flood nonsubstantial mod/add | Permit status: Cmp | Completion date: September 9, 2014 | Current use: Office - administrative, remodel | Permit id: Pmt2014-01779 | |||||
SCORE 77 54 Airport Bl Boulder Co Interior tenant remodel for an existing technical office suite. Scope includes renovated office spaces, bathrooms, break room, assembly areas, and storage. Client: Highpoint | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2017-01592 |