QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 Various Locations Washington Dc No work permitted before 9:30am and all material must be removed from public space by 3:30pm during installation of signs. This permit is valid for the life of the signs installed. Expiration date is for the actual installation of the signs only. This permit is valid for signs listed in the july, 2006 sign location plan submitted to and approved by the district of columbia. Installation as per approved site plans. Installation must follow typical traffic control plans, which are a part of this permit. If any sign location does not fit the typical traffic control plans, permit holder must submit a traffic control plan for the specific location. Such plan must be approved before work to install the sign may take place. Date: October 17, 2006 Contractor: EcomediaPermit type: Fixture; sign (w/footings)(exception) | Permit status: Permit expired | Expiration date: October 17, 2007 | Permit id: Pa23212 |