QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 333 6th St Se, Washington, Dc 20003 Work is to include new nonbearing walls, and finishes throughout for plan reconfiguration. A new master bathroom has been added on the second floor. Rear exterior facade brick is to be re-pointed. Repair and repalce rear stair. Existing kitchens are to get new cabinets, appliances, and fixtures. Bathrooms to get new fixtures and finishes. New mechanical systems and duct work is to be installed in each unit. Current building has 2 separate units with 1 hour fire separation between the units. Units have separate water, gas and electric meters. Units have separate and new mechanical systems. Date: February 6, 2015 Contractor: Duncan BoothbyClient: Duncan Boothby | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1503455 |