QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 Park Drive Se And Hillcrest Drive Se Washington Dc Doee is installing a stormwater conveyance system on an unnamed stream in alger park in se dc. The restoration work will involve providing a stable conveyance of stormwater through the stream valley by installing a series of weirs and step pools that will help dissipate the energy of storm flows and enhance recharge of the water table. Work will also include curb cuts to allow stormwater to enter the upper portion of the system from the street bypassing the storm drain. Date: March 17, 2017 Contractor: Department Of Energy And EnvironmentPermit type: Landscaping; stormwater mgmt (w/curb drain), excavation; storm lateral conn over 4" (trench) | Permit status: Permit expired | Expiration date: May 5, 2017 | Permit id: Pa200442 | |||||
SCORE 59 Park Drive Se And Hillcrest Drive Se Washington Dc Doee is installing a stormwater conveyance system on an unnamed stream in alger park in se dc. The restoration work will involve providing a stable conveyance of stormwater through the stream valley by installing a series of weirs and step pools that will help dissipate the energy of storm flows and enhance recharge of the water table. Work will also include curb cuts to allow stormwater to enter the upper portion of the system from the street bypassing the storm drain. Date: April 5, 2017 Contractor: Department Of Energy And EnvironmentPermit type: Landscaping; stormwater mgmt (w/curb drain), excavation; storm lateral conn over 4" (trench) | Permit status: Permit expired | Expiration date: July 4, 2017 | Permit id: Pa200442-R1 |