SCORE 61 2228 1st St Nw, Washington, Dc 20001 Dccrp proposed one geotechnical boring, nebbc-48, located in the eastbound lane of adams st. Nw, 65 feet west of 1st st. Nw intersection the location is north of address 2228 1st st. Nw. The boring will be 6 inches diameter and 172 feet deep. The boring will be completed using mud rotary drilling methods. A monitoring well will be installed at 1 feet bgs upon boring completion. Date: December 17, 2012 Contractor: Ddot Nic Patterson Dc Clean Rivers ProjectClient: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300071 | |||||
SCORE 61 2429 1st St Nw, Washington, Dc 20001 Dccrp proposed one geotechnical boring, nebbc-53, located in the westbound lane of channing st. Nw, feet east of 1st st. Nw intersection the location is north of address 2429 1st st. Nw. The boring will be 6 inches diameter and 221 feet deep. The boring will be completed using mud rotary drilling methods. A monitoring well will be installed at 179 feet bgs upon boring completion. Date: December 10, 2012 Contractor: Ddot Nic Patterson Dc Clean Rivers ProjectClient: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300055 | |||||
SCORE 61 83 U St Nw, Washington, Dc 20001 Dccrp proposed one geotechnical boring, nebbc-45, located in the westbound lane of u st. Nw, 75 feet east of 1st st. Nw intersection the location is south of address 83 u st. Nw. The boring will be 6 inches diameter and 142 feet deep. The boring will be completed using mud rotary drilling methods. A monitoring well will be installed at 1 bgs upon completion. Date: December 17, 2012 Contractor: Ddot Nic Patterson Dc Clean Rivers ProjectClient: Ddot | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1300070 |