QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 65 5 Blk Of Mass Ave Nw Washington Dc Video and inspection of sanitary lines manhole access permission required Date: October 20, 2005 Contractor: DcwasaPermit status: Permit expired | Expiration date: October 29, 2005 | Permit id: Pa15504 | |||||
SCORE 65 Date: October 20, 2005 Contractor: DcwasaPermit status: 8 | Expiration date: October 29, 2005 | Permit id: Pa15504 | |||||
SCORE 65 Various Location Washington Dc Dcwasa will use agreed upon tsa typicals-per ddot traffic control plan, where applicable. Scope of the work covers citywide fire hydrant replacement or upgrade pipe service line-separate line. Street cut restoraton-per specifications approved by ddot. All permanent restoration must be completed within 45 calendar days after hydrant work is completed. Permit work must be implemented in close consultation with ipma to complete work before ddot projects are initiated. Per wintor moritorium restrictions temporary restoration can be put in before required permanent restoration takes place. 5 year moritorium streets will require extensive restoration as determined by ipma. "no parking" signs must be accurate and provide comprehensive dates, contact names and phone numbers, project name, permit number, and be posted 72 hours before start of work, and removed if work is suspended. Citywide permit is valid for 12 months, with the set amount of of hydrants allowed being 500. Notification of Date: April 27, 2007 Contractor: DcwasaPermit type: Fixture; fire hydrant replacement/repair | Permit status: Permit expired | Expiration date: January 1, 2009 | Permit id: Pa26628 | |||||
SCORE 65 Various Locations Throughout Dc Washington Dc Work will be at multiple addresses as norified to ddot. Test pit; replace lead water services throughout the city. Contractor to perform self tapping. Work hours 7: a. M. Through 7: p. M. Monday through saturday, with rush hour restrictions applied. Where specifically agreed, final restoration by ddot in all other cases final restoration : roadway-within days of start of work on a block; behind curbs within 14 days for each individual excavation. Permit duration is through 10 31 08. Attached additional conditions apply, per letter from public space manager. Notification signs must be up to date, comprehensive, and removed upon completion must inform neighbors, anc as appropriate per ddot. Must complete first 1,2 ft and fully restore before completing and fully restoring subsequent 1,2 ft. Portions. Must coordinate with other utilities, and ddot regarding access to row. Must follow attached additional conditions Date: September 17, 2007 Contractor: DcwasaPermit type: Excavation; underutility_dcwasa, excavation; lead service replacement, excavation; excavation_watersewer, excavation; lead service replacement | Permit status: Permit expired | Expiration date: October 31, 2008 | Permit id: Pa30484 |