SCORE

DAVID O. TREADWELL CENTRAL UNION MISSION

ABOUT DAVID O. TREADWELL CENTRAL UNION MISSION

David O. Treadwell Central Union Mission specializes in:

David O. Treadwell Central Union Mission offers services:

Based on the information received from , associated with David O. Treadwell Central Union Mission over the past .

If you are considering hiring David O. Treadwell Central Union Mission for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


David O. Treadwell Central Union Mission has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
73
65 Massachusetts Avenue Nw Washington Dc
Revisions to previously approved pa67515. All items being revised (removed or value engineered) were proposed improvements that due to budget constraints cannot be done at this time. Complete original approved drawings can be found under tops 67515. Original sheets for reference with their revised versions in this application as well. Per the discussions that cgs architects had in may 2013 with chris shaheen at op and juan amaya at ddot, the significant changes to the approved site package are as follows: 1. Removal of the proposed brick piers (9) 2. Elimination of proposed raised concrete curbs at walkways and parking 3. Substitute asphalt in lieu of proposed asphalt pavers at parking lot 4. Delete proposed brick pavers & provide scored concrete on all walkways within the interior of the site (not street sidewalks) in addition, there were some minor revisions to the proposed north stair (eliminated brick cheek walls) and the proposed handicap ramp (simplification of retaining wall and
Date:  November 27, 2013

Permit type: Paving; driveway behind sidewalk (porous/pervious only), paving; leadwalk only, paving; sidewalk(s), fixture; coping to 18" | Permit status: Approved (pending payment | Expiration date: January 9, 2015
2013/11/2707365 Massachusetts Avenue Nw Washington DcDavid O. Treadwell Central Union Mission
SCORE
73
65 Massachusetts Avenue Nw Washington Dc
Paving; driveway behind sidewalk (porous pervious only), paving; leadwalk only, paving; sidewalk(s), fixture; coping to 18"

Permit status: 3 | Expiration date: January 9, 2015 | Permit id: 0
07365 Massachusetts Avenue Nw Washington DcDavid O. Treadwell Central Union Mission
SCORE
73
65 Massachusetts Avenue Nw Washington Dc
Revisions to previously approved pa67515. All items being revised (removed or value engineered) were proposed improvements that due to budget constraints cannot be done at this time. Complete original approved drawings can be found under tops 67515. Original sheets for reference with their revised versions in this application as well. Per the discussions that cgs architects had in may 2013 with chris shaheen at op and juan amaya at ddot, the significant changes to the approved site package are as follows: 1. Removal of the proposed brick piers (9) 2. Elimination of proposed raised concrete curbs at walkways and parking 3. Substitute asphalt in lieu of proposed asphalt pavers at parking lot 4. Delete proposed brick pavers & provide scored concrete on all walkways within the interior of the site (not street sidewalks) in addition, there were some minor revisions to the proposed north stair (eliminated brick cheek walls) and the proposed handicap ramp (simplification of retaining wall and

Permit status: Cancel/withdrawn | Expiration date: January 9, 2015 | Permit id: 0
07365 Massachusetts Avenue Nw Washington DcDavid O. Treadwell Central Union Mission
SCORE
73
65 Massachusetts Avenue Nw Washington Dc
Paving; driveway behind sidewalk (porous pervious only), paving; leadwalk only, paving; sidewalk(s), fixture; coping to 18"

Permit status: 3 | Expiration date: January 9, 2015 | Permit id: 0
07365 Massachusetts Avenue Nw Washington DcDavid O. Treadwell Central Union Mission
SCORE
73
65 Massachusetts Avenue Nw Washington Dc
Paving; driveway(s) repair or replace, paving; driveway(s) close existing, paving; driveway(s) new- commercial, paving; leadwalk w steps, paving; leadwalk only, paving; patio (porous concrete pervious pavers only), fixture; bench(es), fixture; bike rack(s), fixture; sign (w footings)(exception), fixture; table (except for commercial), fixture; wall, free standing (exception over 30"), fixture; wall fence combo (exception over 42"), landscaping; hedge to 36" tall, landscaping; tree planting, landscaping; new tree space(s), landscaping; stormwater mgmt (exception serve private), projections; window well(s), ps rental; parking on public space
Date:  November 23, 2011

Permit type: Paving; driveway | Permit status: Permit expired | Expiration date: January 30, 2013 | Permit id: Pa67515
2011/11/2307365 Massachusetts Avenue Nw Washington DcDavid O. Treadwell Central Union Mission
SCORE
73
65 Massachusetts Avenue Nw Washington Dc
Paving; driveway(s) repair or replace, paving; driveway(s) close existing, paving; driveway(s) new- commercial, paving; leadwalk w steps, paving; leadwalk only, paving; patio (porous concrete pervious pavers only), fixture; bench(es), fixture; bike rack(s), fixture; sign (w footings)(exception), fixture; table (except for commercial), fixture; wall, free standing (exception over 30"), fixture; wall fence combo (exception over 42"), landscaping; hedge to 36" tall, landscaping; tree planting, landscaping; new tree space(s), landscaping; stormwater mgmt (exception serve private), projections; window well(s), ps rental; parking on public space
Date:  January 23, 2013

Permit type: Paving; driveway | Permit status: Permit expired | Expiration date: July 29, 2013 | Permit id: Pa67515-R1
2013/01/2307365 Massachusetts Avenue Nw Washington DcDavid O. Treadwell Central Union Mission
SCORE
73
65 Massachusetts Avenue Nw Washington Dc
Revisions to previously approved pa67515. All items being revised (removed or value engineered) were proposed improvements that due to budget constraints cannot be done at this time. Complete original approved drawings can be found under tops 67515. Original sheets for reference with their revised versions in this application as well. Per the discussions that cgs architects had in may 2013 with chris shaheen at op and juan amaya at ddot, the significant changes to the approved site package are as follows: 1. Removal of the proposed brick piers (9) 2. Elimination of proposed raised concrete curbs at walkways and parking 3. Substitute asphalt in lieu of proposed asphalt pavers at parking lot 4. Delete proposed brick pavers & provide scored concrete on all walkways within the interior of the site (not street sidewalks) in addition, there were some minor revisions to the proposed north stair (eliminated brick cheek walls) and the proposed handicap ramp (simplification of retaining wall and

Permit status: Cancel/withdrawn | Expiration date: January 9, 2015 | Permit id: 0
07365 Massachusetts Avenue Nw Washington DcDavid O. Treadwell Central Union Mission
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.