Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 82 Client: Gillette Manufacturing Usa | Permit type: Plumbing | Permit status: Open | Current use: Comm | Permit id: Pl663172 | Parcel: 0601169000 | |||||
SCORE 82 450458 Brookline Av Boston Ma Brazing;only to relocate co2 and medical vacuum lines in;lab space;dpl ;12 1 16 bfd paid detail required Date: October 7, 2016 Contractor: David Newbitt Client: Dana-Farber Cancer | Permit type: Bfd cutting-burning-welding | Permit id: Cbw644104 | Parcel: 0401916000 | |||||
SCORE 82 2355 Northern Av Boston Ma Cutting burning and welding to install water sanitary and gas piping for a plumbing system in new open unenclosed unoccupied construction. Bfd paid detail required Date: October 7, 2016 Contractor: David Newbitt Client: Ms Boston Seaport Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw641954 | Parcel: 0602640020 | |||||
SCORE 82 219 Western Av Allston Ma Welding and soldering to relocate water and gas lines (dpl) bfd paid detail required... No devirtion from prescribed safeguards &; conditions Date: October 14, 2016 Contractor: David Newbitt Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw645858 | Parcel: 2200534000 | |||||
SCORE 82 Summer St Boston Ma Soldering of steel and copper piping to install hot water chilled water and condenser pipe and supports (dpl) bfd paid detail required Date: October 21, 2016 Contractor: David Newbitt Client: Four 26 Washington St Owner | Permit type: Bfd cutting-burning-welding | Permit id: Cbw648526 | Parcel: 0304584010 | |||||
SCORE 82 1 Franklin St Boston Ma Soldering of steel and copper piping in installation of piping and supports for hot water chilled water and condenser in office expansion renovation.(dpl) bfd paid detail required Date: November 7, 2016 Contractor: David Newbitt Client: Four 26 Washington St Owner | Permit type: Bfd cutting-burning-welding | Permit id: Cbw645367 | Parcel: 0304584010 | |||||
SCORE 82 44 Binney St Boston Ma Soldering and brazing operations for the installation of;copper water pipe and med gas pipe Date: April 3, 2017 Contractor: David Newbitt Client: Children Cancer Research | Permit type: Bfd cutting-burning-welding | Permit id: Cbw694194 | Parcel: 0401913000 | |||||
SCORE 82 77 Avenue Louis Past Boston Ma Soldering and brazing copper fittings to facilitate relocation of co2 tank room from one room to another in the basement level of harvard medical school nrb (dpl) Date: April 4, 2017 Contractor: David Newbitt Client: President And Fellows | Permit type: Bfd cutting-burning-welding | Permit id: Cbw687336 | Parcel: 0401849000 | |||||
SCORE 82 4 Fenway Boston Ma Soldering of water and sanitary pipe associated with the installation of;plumbing system (dpl) Date: May 10, 2017 Contractor: David Newbitt Client: Emmanuel College Trustees | Permit type: Bfd cutting-burning-welding | Permit id: Cbw706789 | Parcel: 0401847000 | |||||
SCORE 82 6 W Broadway South Boston Ma Cutting welding and soldering for the;installation of;new plumbing and gas service (dpl) Date: May 10, 2017 Contractor: David Newbitt Client: Six West Broadway Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw706853 | Parcel: 0600032000 | |||||
SCORE 82 2022 Liberty Dr Boston Ma Welding and soldering to install water pipe sanitary pipe kitchen waste pipe and gas lines in a restaurant fit out on the first floor of an existing building. Bfd paid detail required Date: May 11, 2017 Contractor: David Newbitt Client: Fan Pier Development Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw706407 | Parcel: 0602671025 | |||||
SCORE 82 1 Emerson Pl Boston Ma Soldering to install water pipe traps and stops to tie in with building water supply in 1st floor office renovation. Date: May 12, 2017 Contractor: David Newbitt Client: Erp Operating Lp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw699728 | Parcel: 0300449000 | |||||
SCORE 82 113129 Seaport Bl Boston Ma Cutting and burning of metal decking and welding of iron pipe during initial phase of installing a plumbing system in new construction.(dpl 4 1 18) bfd paid detail required Date: June 13, 2017 Contractor: David Newbitt Client: Ms Boston Seaport Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw717669 | Parcel: 0602640030 | |||||
SCORE 82 136 Harrison Av Boston Ma Soldering to install potable water piping in renovation project. (dpl) bfd paid detail required Date: May 22, 2017 Contractor: David Newbitt Client: Tufts University Trst | Permit type: Bfd cutting-burning-welding | Permit id: Cbw710703 | Parcel: 0305251000 | |||||
SCORE 82 3 Brookline Av Boston Ma Solder copper pipe for domestic water and brazing for compressed air lines for water heater relocation in the feldberg kirstein basement at bidmc (dpl) Date: May 25, 2017 Contractor: David Newbitt Client: Beth Israel Deaconess | Permit type: Bfd cutting-burning-welding | Permit id: Cbw709879 | Parcel: 0401862000 | |||||
SCORE 82 Gillette Pk Boston Ma Orbital welding to connect new argon bottle manifold to new manufacturing equipment (dpl) bfd paid detail required Date: May 25, 2017 Contractor: David Newbitt Client: Gillette Manufacturing Usa | Permit type: Bfd cutting-burning-welding | Permit id: Cbw711476 | Parcel: 0601169000 | |||||
SCORE 82 Date: January 10, 2017 Contractor: David Newbitt Client: Dana-Farber Cancer | Permit type: Bfd cutting-burning-welding | Permit id: Cbw670528 | Parcel: 0401919000 | |||||
SCORE 82 Client: Gillette Manufacturing Usa | Permit type: Plumbing permit | Expiration date: June 7, 2017 | Current use: Comm | Permit id: Pl663172 | Parcel: 0601169000 | |||||
SCORE 82 219 Western Av Allston Ma Welding related to the installation of 3" gas line from the outside meter to trader joes on 1st floor and capped for future use. Pipe will run between garage level and 1st floor at trader joes. (dpl) bfd paid detail required Date: June 9, 2017 Contractor: David Newbitt Client: President And Fellows Of | Permit type: Bfd cutting-burning-welding | Permit id: Cbw717415 | Parcel: 2200534000 | |||||
SCORE 82 77 Avenue Louis Past Boston Ma Soldering and brazing copper fittings to facilitate relocation of co2 tank room from one room to another in basement level of harvard medical school nrb building (dpl) Date: June 20, 2017 Contractor: David Newbitt Client: President And Fellows | Permit type: Bfd cutting-burning-welding | Permit id: Cbw720779 | Parcel: 0401849000 | |||||
SCORE 82 1 Legends Wa Boston Ma Welding burning and cutting to install gas risers and associated supporting steel to facilitate plumbing and gas fitting in building expansion. Bfd paid detail required Date: June 23, 2017 Contractor: David Newbitt Permit type: Bfd cutting-burning-welding | Permit id: Cbw721070 | |||||
SCORE 82 3 Brookline Av Boston Ma Soldering and brazing of copper tubing and fittings in the installation of water and lab gas piping in a lab renovation within an existing lab in the feldberg reisman complex. Date: November 23, 2016 Contractor: David Newbitt Client: Beth Israel Deaconess | Permit type: Bfd cutting-burning-welding | Permit id: Cbw655528 | Parcel: 0401862000 | |||||
SCORE 82 25 Dry Dock Av Boston Ma Welding soldering and brazing to facilitate installation of water pipe sanitary pipe and lab gas pipe in 8th floor lab renovation project (dpl) bfd paid detail required Date: June 30, 2017 Contractor: David Newbitt Client: Jamestown 21-23-25 Drydock | Permit type: Bfd cutting-burning-welding | Permit id: Cbw725223 | Parcel: 0602674013 | |||||
SCORE 82 4 Yawkey Wy Boston Ma Cutting of metal deck and welding and soldering of gas pipe water pipe and drains for plumbing (dpl) bfd paid detail required Date: November 21, 2016 Contractor: David Newbitt Client: Henry John W Ts | Permit type: Bfd cutting-burning-welding | Permit id: Cbw653771 | Parcel: 0504199000 | |||||
SCORE 82 Blossom St Boston Ma Soldering and brazing to facilitate installation of medical gas and water piping in a pathology lab fit-out on 1st and 2nd floors (dpl) bfd paid detail required Date: July 3, 2017 Contractor: David Newbitt Client: General Hospital Corp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw724829 | Parcel: 0300370000 | |||||
SCORE 82 Date: December 14, 2016 Contractor: David Newbitt Client: Two25 Franklin Owner Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw664979 | Parcel: 0304134000 | |||||
SCORE 82 25 Dry Dock Av Boston Ma Welding cutting and burning to install gas pipe and soldering and brazing to installwater pipe sanitary pipe and lab air pipe to facilitate a new plumbing system in an office lab renovation project on floors 1 thru 5 (dpl) bfd paid detail required... 1or 2 firefighters for each separate location; Date: July 7, 2017 Contractor: David Newbitt Client: Jamestown 21-23-25 Drydock | Permit type: Bfd cutting-burning-welding | Permit id: Cbw727478 | Parcel: 0602674013 | |||||
SCORE 82 Liberty Dr Boston Ma Cutting welding soldering and brazing to install gas main for permanent heating temporary heating and plumbing installation (dpl) bfd paid detail required Date: January 25, 2017 Contractor: David Newbitt Client: Fan Pier Development Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw674414 | Parcel: 0602671025 | |||||
SCORE 82 1325 Boylston St Boston Ma Welding soldering and brazing to install water pipe sanitary pipe gas pipe and lab gas pipe for new plumbing system in tenant fit out in existing building at 1325 boylston street. Bfd paid detail required Date: November 9, 2016 Contractor: David Newbitt Client: Thirteen 25 Fe Boylston Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw654086 | Parcel: 0504321000 | |||||
SCORE 82 Date: January 18, 2017 Contractor: David Newbitt Client: General Hospital Corp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw672975 | Parcel: 0300370000 | |||||
SCORE 82 805 Columbus Av Boston Ma Soldering and brazing to install air lines lab gas and vacuum piping in lab fit-out in existing building. Date: December 8, 2016 Contractor: David Newbitt Client: Northeastern University | Permit type: Bfd cutting-burning-welding | Permit id: Cbw663346 | Parcel: 0901340000 | |||||
SCORE 82 Fenwood Rd Boston Ma Sweating of pipes to complete the installation infrastructure and fitout plumbing associated with the installation of the plumbing system (dpl) bfd paid detail required Date: January 31, 2017 Contractor: David Newbitt Client: Commonwealth Of Mass | Permit type: Bfd cutting-burning-welding | Permit id: Cbw677099 | Parcel: 1000319000 | |||||
SCORE 82 Blossom St Boston Ma Soldering to install medical gas and water piping (dpl) bfd paid detail required Date: January 18, 2017 Contractor: David Newbitt Client: General Hospital Corp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw672767 | Parcel: 0300370000 | |||||
SCORE 82 Gillette Pk Boston Ma Brazing and soldering on existing nitrogen and chilled water lines to connect new manufacturing equipment. Bfd paid detail required Date: January 11, 2017 Contractor: David Newbitt Client: Gillette Manufacturing Usa | Permit type: Bfd cutting-burning-welding | Permit id: Cbw671306 | Parcel: 0601169000 | |||||
SCORE 82 2022 Liberty Dr Boston Ma Welding and soldering to install water pipe sanitary pipe kitchen waste pipe and gas lines in in a restaurant fit-out (dpl) bfd paid detail required Date: January 17, 2017 Contractor: David Newbitt Client: Fan Pier Development Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw671319 | Parcel: 0602671025 | |||||
SCORE 82 113129 Seaport Bl Boston Ma Cutting and burning of metal decking and welding of iron piping during the initial phase of installing plumbing system (dpl) Date: December 5, 2016 Contractor: David Newbitt Client: Ms Boston Seaport Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw662213 | Parcel: 0602640030 | |||||
SCORE 82 3 Brookline Av Boston Ma Cutting and welding of gas pipe and soldering of water pipe;for the;installation of new plumbing system (dpl) Date: January 18, 2017 Contractor: David Newbitt Client: Emmanuel College Trustees | Permit type: Bfd cutting-burning-welding | Permit id: Cbw672320 | Parcel: 0401862030 | |||||
SCORE 82 2355 Northern Av Boston Ma Cutting burning and welding to install water sanitary and gas piping in seaport square building b in garage levels p1 p2 and p3 and floors 1 through 23 for a permanent plumbing system in new open unoccupied construction (dpl) bfd paid detail required Date: March 28, 2017 Contractor: David Newbitt Client: Ms Boston Seaport Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw692098 | Parcel: 0602640020 | |||||
SCORE 82 3 Brookline Av Boston Ma Soldering and brazing to install copper water pipe and med gas pipe in a pulmonary clinic renovation (dpl) Date: March 28, 2017 Contractor: David Newbitt Client: Beth Israel Deaconess | Permit type: Bfd cutting-burning-welding | Permit id: Cbw691478 | Parcel: 0401862000 | |||||
SCORE 82 416418 W Broadway South Boston Ma Cutting and welding to install vertical gas lines and risers along rear wall and installation of;horizontal gas line in ceiling (dpl) bfd paid detail required Date: December 2, 2016 Contractor: David Newbitt Client: Smiley West Broadway Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw660343 | Parcel: 0601881000 | |||||
SCORE 82 267 Charles St Boston Ma Soldering and brazing to install water pipe and medical gas pipe (dpl) bfd paid detail required Date: December 21, 2016 Contractor: David Newbitt Client: General Hospital Corp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw666528 | Parcel: 0300370000 | |||||
SCORE 82 2355 Northern Av Boston Ma Welding cutting burning on ;gas lines for heating and sweating of copper pipe for water; and sweating of copper pipe for water lines dpl 9 1 17 bfd paid detail required Date: February 27, 2017 Contractor: David Newbitt Client: Ms Boston Seaport Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw681456 | Parcel: 0602640020 | |||||
SCORE 82 3 Brookline Av Boston Ma Soldering and brazing to install medical gas pipe and domestic water pipe (dpl) Date: March 21, 2017 Contractor: David Newbitt Client: Beth Israel Deaconess | Permit type: Bfd cutting-burning-welding | Permit id: Cbw689624 | Parcel: 0401862000 | |||||
SCORE 82 2355 Northern Av Boston Ma Cutting burning and welding to install water sanitary and gas pipe at seaport square building c in garage levels p1 p2 and p3 and floors 1 through 22 for a permanent plumbing system in new open unoccupied construction (dpl) bfd paid detail required Date: March 28, 2017 Contractor: David Newbitt Client: Ms Boston Seaport Llc | Permit type: Bfd cutting-burning-welding | Permit id: Cbw692106 | Parcel: 0602640020 | |||||
SCORE 82 201 Washington St Boston Ma Soldering to install water and sanitary pipe (dpl) bfd paid detail required Date: January 17, 2017 Contractor: David Newbitt Permit type: Bfd cutting-burning-welding | Permit id: Cbw668313 | |||||
SCORE 82 2 State St Boston Ma Soldering only of water pipes to connect to new sinks being installed in break room;(dpl) bfd paid detail required Date: March 23, 2017 Contractor: David Newbitt Client: Two Hundred State Condo Tr | Permit type: Bfd cutting-burning-welding | Permit id: Cbw688409 | Parcel: 0303790000 | |||||
SCORE 82 Date: December 14, 2016 Contractor: David Newbitt Client: Beth Israel Deaconess | Permit type: Bfd cutting-burning-welding | Permit id: Cbw662909 | Parcel: 0401862000 |