SCORE

DAVID JACKOWITZ

ABOUT DAVID JACKOWITZ

David Jackowitz specializes in:

David Jackowitz offers services:

Based on the information received from , associated with David Jackowitz over the past .

If you are considering hiring David Jackowitz for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


David Jackowitz has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
93
291 Saint Botolph S Boston Ma 02115
Subdivide existing 68 606 square foot lot into two lots a (316 huntington ave) and b (291 saint botolph). Lot a will contain 45 214 square feet of land with 176 113 gross square feet of buildings. The floor area ratio of lot a will be 3. 90. Lot b will contain 23 392 square feet of land with 59 539 g
Date:  June 20, 2012
Value:   $1
Contractor: David Jackowitz

Client: Boston Y. M.C .A. | Permit type: Subdivision combinin | Current use: Mixed | Permit id: Alt136498 | Parcel: 402245000
2012/06/20193291 Saint Botolph S Boston Ma 02115David Jackowitz
SCORE
93
312-320 Huntington A Boston Ma 02115
On desk at kens area. The design of the new branch proposes to demolish the existing block of the building housing the pool and squash courts a small segment of the lower rear portion of the building (which consists only of a basement and two stories) and a portion of an original light well that wa
Date:  January 14, 2013
Value:   $21,200,000
Contractor: David Jackowitz

Client: Boston Y. M.C .A. | Permit type: Addition | Current use: Other | Permit id: Alt113727 | Parcel: 402245000
2013/01/142120000093312-320 Huntington A Boston Ma 02115David Jackowitz
SCORE
93
15 Bellevue St West Roxbury Ma 02132
Addition to and renovation of existing ymca facility demolition of one structure on centre street and create parking all in accordance with the plans filed herewith and lot combination;per plan
Date:  June 5, 2014
Value:   $14,321,250
Contractor: David Jackowitz

Client: Boston Y. M.C .A. | Permit type: Addition | Current use: Other | Permit id: Alt275851 | Parcel: 2002296000
2014/06/05143212509315 Bellevue St West Roxbury Ma 02132David Jackowitz
SCORE
93
312 3 Huntington Av Boston Ma 02115
On desk at kens area. The design of the new branch proposes to demolish the existing block of the building housing the pool and squash courts a small segment of the lower rear portion of the building (which consists only of a basement and two stories) and a portion of an original light well that was infilled on the basement level. The approximate total of the areas of the building to be demolished is 22 7 gfa. These areas are on the side of the property adjacent to the new england conservatory. The existing huntington ave. Tower will be left intact. A new block will be built in place of the demolished areas which will include a pool and handball court on the basement level a gym and second handball court on an intermediate level and new ymca offices on a third level over the gym. A new stair and elevator will be constructed in the original lightwell and a new fire stair will be installed at the intersection of the new block and the huntington tower. These new areas add up to approximat
Date:  January 14, 2013
Value:   $21,200,000
Contractor: David Jackowitz

Client: Boston Y. M.C .A. | Permit type: Addition | Permit status: Expired | Current use: Other | Permit id: Alt113727 | Parcel: 0402245000
2013/01/142120000093312 3 Huntington Av Boston Ma 02115David Jackowitz
SCORE
93
15 Bellevue St Roxbury Ma 02132
Addition to and renovation of existing ymca facility demolition of one structure on centre street and create parking all in accordance with the plans filed herewith and lot combination;per plan
Date:  June 5, 2014
Value:   $14,321,250
Contractor: David Jackowitz

Permit type: Addition | Permit status: Expired | Current use: Other | Permit id: Alt275851 | Parcel: 2002296000
2014/06/05143212509315 Bellevue St Roxbury Ma 02132David Jackowitz
SCORE
93
15 Bellevue St Roxbury Ma 02132
Subdivide existing 78 088 square foot lot into two lots one at 1972 centre street containing 6 321 square feet the other at 15 bellevue street containing 71 767 square feet all in accordance with the plans filed herewith.; subdivision plans filed under 1972 centre street ( alt443568 )
Date:  February 27, 2015
Contractor: David Jackowitz

Permit type: Subdivision combinin | Permit status: Expired | Current use: Other | Permit id: Alt443632 | Parcel: 2011694000
2015/02/2709315 Bellevue St Roxbury Ma 02132David Jackowitz
SCORE
93
1972 Centre St Roxbury Ma 02132
Subdivide existing 78 088 square foot lot into two lots one at 1972 centre street containing 6 321 square feet the other at 15 bellevue street containing 71 767 square feet all in accordance with the plans filed herewith. This lot to no have 6 321 sq ft; subdivision plans filed under this address
Date:  February 27, 2015
Contractor: David Jackowitz

Permit type: Subdivision combinin | Permit status: Expired | Current use: Other | Permit id: Alt443568 | Parcel: 2002317000
2015/02/270931972 Centre St Roxbury Ma 02132David Jackowitz
SCORE
93
316 Huntington Av Boston Ma 02115
Amend permit alt113727 to eliminate intumescent varnish in first floor reception first floor lobby second floor balcony as well as window casings on first and second floor. The premise is listed on the national register of historic places. The massachusetts historical commission the boston landmarks commission and the boston preservation alliance seek to have the lobby area remain substantially in its present condition. Applicant proposes a compliance alternative to the intumescent varnish which is detailed in the attached memorandum which in substance proposes the removal of certain portions of the existing wood paneling in combination with sprinklering of the affected areas. Substitute unrated framing and glass at glazed wall areas between new main stair and cafÚ/lobby new main stair and gymnasium new main stair and 2nd floor wellness. Install additional sprinkler heads as shown. Cost reflects on alt113727 ;per plan
Date:  April 4, 2013
Contractor: David Jackowitz

Client: Greater Boston Young Mens | Permit type: Other | Permit status: Expired | Current use: Mixed | Permit id: A224194 | Parcel: 0402245010
2013/04/04093316 Huntington Av Boston Ma 02115David Jackowitz
SCORE
93
316 Huntington Av Boston Ma 02115
Relocate existing sanitary sewer lines to accommodate proposed future construction install sanitary pump chamber and sewer manhole per plans filed herewith. Property located in groundwater protection overlay district. Work implicates article 32 and will require a conditional use permit from the boston zoning board of appeals.
Date:  March 30, 2012
Value:   $70,000
Contractor: David Jackowitz

Client: Greater Boston Young Mens | Permit type: Plumbing | Permit status: Expired | Current use: Mixed | Permit id: Alt72674 | Parcel: 0402245010
2012/03/307000093316 Huntington Av Boston Ma 02115David Jackowitz
SCORE
93
3123 Huntington Av Boston Ma 02115
On desk at kens area. The design of the new branch proposes to demolish the existing block of the building housing the pool and squash courts a small segment of the lower rear portion of the building (which consists only of a basement and two stories) and a portion of an original light well that was infilled on the basement level. The approximate total of the areas of the building to be demolished is 22 7 gfa. These areas are on the side of the property adjacent to the new england conservatory. The existing huntington ave. Tower will be left intact. A new block will be built in place of the demolished areas which will include a pool and handball court on the basement level a gym and second handball court on an intermediate level and new ymca offices on a third level over the gym. A new stair and elevator will be constructed in the original lightwell and a new fire stair will be installed at the intersection of the new block and the huntington tower. These new areas add up to approximat
Date:  January 14, 2013
Value:   $21,200,000
Contractor: David Jackowitz

Client: Ymca Of Greater Boston Inc | Permit type: Addition | Permit status: Expired | Current use: Other | Permit id: Alt113727 | Parcel: 0402245000
2013/01/1421200000933123 Huntington Av Boston Ma 02115David Jackowitz
SCORE
93
15 Bellevue St Boston Ma 02132
Subdivide existing 78 088 square foot lot into two lots one at 1972 centre street containing 6 321 square feet the other at 15 bellevue street containing 71 767 square feet all in accordance with the plans filed herewith.; subdivision plans filed under 1972 centre street ( alt443568 )
Date:  February 27, 2015
Contractor: David Jackowitz

Client: Forty-6 Rockland St Bldg Cp | Permit type: Subdivision combining lot | Permit status: Expired | Current use: Other | Permit id: Alt443632 | Parcel: 2002296000
2015/02/2709315 Bellevue St Boston Ma 02132David Jackowitz
SCORE
93
316 Huntington Av Boston Ma 02115
Install elevator (accesses first floor and basement only). Elevator pit will be below art. 32 threshold of 7 ft. Above the boston city base. Install exterior access ramp platform and stairs to access existing egress. Install pre-cast concrete drywell in accordance with article 32. Also fire alarm work as shown on construction drawings.
Date:  February 13, 2012
Value:   $50,000
Contractor: David Jackowitz

Client: Greater Boston Young Mens | Permit type: Other | Permit status: Expired | Current use: Mixed | Permit id: Alt63308 | Parcel: 0402245010
2012/02/135000093316 Huntington Av Boston Ma 02115David Jackowitz
SCORE
93
15 Bellevue St Boston Ma 02132
Addition to and renovation of existing ymca facility demolition of one structure on centre street and create parking all in accordance with the plans filed herewith and lot combination;per plan
Date:  June 5, 2014
Value:   $14,321,250
Contractor: David Jackowitz

Client: Forty-6 Rockland St Bldg Cp | Permit type: Addition | Permit status: Expired | Current use: Other | Permit id: Alt275851 | Parcel: 2011694000
2014/06/05143212509315 Bellevue St Boston Ma 02132David Jackowitz
SCORE
93
1972 Centre St Boston Ma 02132
Subdivide existing 78 088 square foot lot into two lots one at 1972 centre street containing 6 321 square feet the other at 15 bellevue street containing 71 767 square feet all in accordance with the plans filed herewith. This lot to no have 6 321 sq ft; subdivision plans filed under this address
Date:  February 27, 2015
Contractor: David Jackowitz

Client: Ymca Of Greater Boston Inc | Permit type: Subdivision combining lot | Permit status: Expired | Current use: Other | Permit id: Alt443568 | Parcel: 2002316000
2015/02/270931972 Centre St Boston Ma 02132David Jackowitz
SCORE
93
316 Huntington Av Boston Ma 02115
Subdivide existing 68 606 square foot lot into two lots a (316 huntington avenue) and b (291 saint botolph). Lot a will contain 45 214 square feet of land with 176 113 gross square feet of buildings. The floor area ratio of lot a will be 3. 90. Lot b will contain 23 392 square feet of land with 59 539 gross square feet of buildings. The floor area ratio on lot b will be 2. 55.
Date:  June 20, 2012
Value:   $1
Contractor: David Jackowitz

Client: Greater Boston Young Mens | Permit type: Subdivision combining lot | Permit status: Expired | Current use: Mixed | Permit id: Alt136207 | Parcel: 0402245010
2012/06/20193316 Huntington Av Boston Ma 02115David Jackowitz
SCORE
93
291 Saint Botolph St Boston Ma 02115
Subdivide existing 68 606 square foot lot into two lots a (316 huntington ave) and b (291 saint botolph). Lot a will contain 45 214 square feet of land with 176 113 gross square feet of buildings. The floor area ratio of lot a will be 3. 90. Lot b will contain 23 392 square feet of land with 59 539 gross square feet of buildings. The floor area ratio on lot b will be 2. 55 note: plans attached to 316 huntington ave alt 136207.
Date:  June 20, 2012
Value:   $1
Contractor: David Jackowitz

Client: Ymca Of Greater Boston Inc | Permit type: Subdivision combining lot | Permit status: Expired | Current use: Mixed | Permit id: Alt136498 | Parcel: 0402245000
2012/06/20193291 Saint Botolph St Boston Ma 02115David Jackowitz
SCORE
93
316 Huntington Av Boston Ma
Relocate existing sanitary sewer lines to accommodate proposed future construction install sanitary pump chamber and sewer manhole per plans filed herewith. Property located in groundwater protection overlay district. Work implicates article 32 and will require a conditional use permit from the boston zoning board of appeals.
Date:  March 30, 2012
Value:   $70,000
Contractor: David Jackowitz

Client: Hellenic Assn O | Permit type: Long form/alteration permit | Expiration date: September 30, 2012 | Current use: Mixed | Permit id: Alt72674 | Parcel: 0402245010
2012/03/307000093316 Huntington Av Boston MaDavid Jackowitz
SCORE
93
15 Bellevue St Boston Ma
Addition to and renovation of existing ymca facility demolition of one structure on centre street and create parking all in accordance with the plans filed herewith and lot combination;per plan
Date:  June 5, 2014
Value:   $14,321,250
Contractor: David Jackowitz

Client: Boston Y. M.C .A. | Permit type: Long form/alteration permit | Expiration date: December 5, 2014 | Current use: Other | Permit id: Alt275851 | Parcel: 2002296000
2014/06/05143212509315 Bellevue St Boston MaDavid Jackowitz
SCORE
93
312 3 Huntington Av Boston Ma
On desk at kens area. The design of the new branch proposes to demolish the existing block of the building housing the pool and squash courts a small segment of the lower rear portion of the building (which consists only of a basement and two stories) and a portion of an original light well that was infilled on the basement level. The approximate total of the areas of the building to be demolished is 22 7 gfa. These areas are on the side of the property adjacent to the new england conservatory. The existing huntington ave. Tower will be left intact. A new block will be built in place of the demolished areas which will include a pool and handball court on the basement level a gym and second handball court on an intermediate level and new ymca offices on a third level over the gym. A new stair and elevator will be constructed in the original lightwell and a new fire stair will be installed at the intersection of the new block and the huntington tower. These new areas add up to approximat
Date:  January 14, 2013
Value:   $21,200,000
Contractor: David Jackowitz

Client: Boston Y. M.C .A. | Permit type: Long form/alteration permit | Current use: Other | Permit id: Alt113727 | Parcel: 0402245000
2013/01/142120000093312 3 Huntington Av Boston MaDavid Jackowitz
SCORE
93
291 Saint Botolph St Boston Ma
Subdivide existing 68 606 square foot lot into two lots a (316 huntington ave) and b (291 saint botolph). Lot a will contain 45 214 square feet of land with 176 113 gross square feet of buildings. The floor area ratio of lot a will be 3. 90. Lot b will contain 23 392 square feet of land with 59 539 gross square feet of buildings. The floor area ratio on lot b will be 2. 55 note: plans attached to 316 huntington ave alt 136207.
Date:  June 20, 2012
Value:   $1
Contractor: David Jackowitz

Client: Boston Y. M.C .A. | Permit type: Long form/alteration permit | Expiration date: December 20, 2012 | Current use: Mixed | Permit id: Alt136498 | Parcel: 0402245000
2012/06/20193291 Saint Botolph St Boston MaDavid Jackowitz
SCORE
93
15 Bellevue St Boston Ma
Subdivide existing 78 088 square foot lot into two lots one at 1972 centre street containing 6 321 square feet the other at 15 bellevue street containing 71 767 square feet all in accordance with the plans filed herewith.; subdivision plans filed under 1972 centre street ( alt443568 )
Date:  February 27, 2015
Contractor: David Jackowitz

Client: Rockland St Bldg Corp | Permit type: Long form/alteration permit | Expiration date: August 27, 2015 | Current use: Other | Permit id: Alt443632 | Parcel: 2011694000
2015/02/2709315 Bellevue St Boston MaDavid Jackowitz
SCORE
93
316 Huntington Av Boston Ma
Install elevator (accesses first floor and basement only). Elevator pit will be below art. 32 threshold of 7 ft. Above the boston city base. Install exterior access ramp platform and stairs to access existing egress. Install pre-cast concrete drywell in accordance with article 32. Also fire alarm work as shown on construction drawings.
Date:  February 13, 2012
Value:   $50,000
Contractor: David Jackowitz

Client: Hellenic Assn O | Permit type: Long form/alteration permit | Expiration date: August 13, 2012 | Current use: Mixed | Permit id: Alt63308 | Parcel: 0402245010
2012/02/135000093316 Huntington Av Boston MaDavid Jackowitz
SCORE
93
316 Huntington Av Boston Ma
Subdivide existing 68 606 square foot lot into two lots a (316 huntington avenue) and b (291 saint botolph). Lot a will contain 45 214 square feet of land with 176 113 gross square feet of buildings. The floor area ratio of lot a will be 3. 90. Lot b will contain 23 392 square feet of land with 59 539 gross square feet of buildings. The floor area ratio on lot b will be 2. 55.
Date:  June 20, 2012
Value:   $1
Contractor: David Jackowitz

Client: Hellenic Assn O | Permit type: Long form/alteration permit | Expiration date: December 20, 2012 | Current use: Mixed | Permit id: Alt136207 | Parcel: 0402245010
2012/06/20193316 Huntington Av Boston MaDavid Jackowitz
SCORE
93
1972 Centre St Boston Ma
Subdivide existing 78 088 square foot lot into two lots one at 1972 centre street containing 6 321 square feet the other at 15 bellevue street containing 71 767 square feet all in accordance with the plans filed herewith. This lot to no have 6 321 sq ft; subdivision plans filed under this address
Date:  February 27, 2015
Contractor: David Jackowitz

Client: Boston Aid To B | Permit type: Long form/alteration permit | Expiration date: August 27, 2015 | Current use: Other | Permit id: Alt443568 | Parcel: 2002317000
2015/02/270931972 Centre St Boston MaDavid Jackowitz
SCORE
93
3123 Huntington Av Boston Ma
On desk at kens area. The design of the new branch proposes to demolish the existing block of the building housing the pool and squash courts a small segment of the lower rear portion of the building (which consists only of a basement and two stories) and a portion of an original light well that was infilled on the basement level. The approximate total of the areas of the building to be demolished is 22 7 gfa. These areas are on the side of the property adjacent to the new england conservatory. The existing huntington ave. Tower will be left intact. A new block will be built in place of the demolished areas which will include a pool and handball court on the basement level a gym and second handball court on an intermediate level and new ymca offices on a third level over the gym. A new stair and elevator will be constructed in the original lightwell and a new fire stair will be installed at the intersection of the new block and the huntington tower. These new areas add up to approximat
Date:  January 14, 2013
Value:   $21,200,000
Contractor: David Jackowitz

Client: Ymca Of Greater Boston Inc | Permit type: Long form/alteration permit | Current use: Other | Permit id: Alt113727 | Parcel: 0402245000
2013/01/1421200000933123 Huntington Av Boston MaDavid Jackowitz
SCORE
93
49 Causeway St Boston Ma
Board of appeals
Date:  August 16, 2016
Contractor: David Jackowitz

Client: Transatlantic Limited | Expiration date: August 16, 2018 | Current use: Comm | Permit id: Boa618316 | Parcel: 0301680000
2016/08/1609349 Causeway St Boston MaDavid Jackowitz
SCORE
93
316 Huntington Av Boston Ma
Amend permit alt113727 to eliminate intumescent varnish in first floor reception first floor lobby second floor balcony as well as window casings on first and second floor. The premise is listed on the national register of historic places. The massachusetts historical commission the boston landmarks commission and the boston preservation alliance seek to have the lobby area remain substantially in its present condition. Applicant proposes a compliance alternative to the intumescent varnish which is detailed in the attached memorandum which in substance proposes the removal of certain portions of the existing wood paneling in combination with sprinklering of the affected areas. Substitute unrated framing and glass at glazed wall areas between new main stair and caf/lobby new main stair and gymnasium new main stair and 2nd floor wellness. Install additional sprinkler heads as shown. Cost reflects on alt113727 ;per plan
Date:  April 4, 2013
Contractor: David Jackowitz

Client: Greater Boston Young Mens | Permit type: Amendment to a long form | Expiration date: October 4, 2013 | Current use: Mixed | Permit id: A224194 | Parcel: 0402245010
2013/04/04093316 Huntington Av Boston MaDavid Jackowitz
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.