SCORE

DANIEL LEBIEDZ

ABOUT DANIEL LEBIEDZ

Daniel Lebiedz specializes in:

Daniel Lebiedz offers services:

Based on the information received from , associated with Daniel Lebiedz over the past .

If you are considering hiring Daniel Lebiedz for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Daniel Lebiedz has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
86
400 Huntington Av Boston Ma 02115
Demolish interior finishes of existing weight room facility original contract submitted with alt71814.
Date:  May 23, 2011
Value:   $58,000
Contractor: Daniel Lebiedz

Client: Northeastern University | Permit type: Demolition - interio | Current use: Comm | Permit id: Sf77881 | Parcel: 402236000
2011/05/235800086400 Huntington Av Boston Ma 02115Daniel Lebiedz
SCORE
86
400 Huntington Av Boston Ma 02115
Legal use and occupancy is gymnasium physical education office classroom. Certificate of use and occupancy for gymnasium alt71814 issued 6 10 11
Date:  October 20, 2011
Contractor: Daniel Lebiedz

Client: Northeastern University | Permit id: Coo94948 | Parcel: 402236000
2011/10/20086400 Huntington Av Boston Ma 02115Daniel Lebiedz
SCORE
86
364-372 Congress St Boston Ma 02210
Perform selective interior and exterior demolition within the existing building.
Date:  November 3, 2011
Value:   $634,000
Contractor: Daniel Lebiedz

Client: Tf Boston Fundi | Permit type: Demolition - interio | Current use: Comm | Permit id: Sf104009 | Parcel: 602654000
2011/11/0363400086364-372 Congress St Boston Ma 02210Daniel Lebiedz
SCORE
86
300 Fenway Boston Ma 02115
2nd floor - build out existing vacant space with new drywall partitions electrical hvac fire protection and interior finishes 4th floor - selectively demolish some existing interior drywall partitions. Install new drywall partitions electrical hvac fire protection and interior finishes.
Date:  November 15, 2011
Value:   $356,175
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Fast track applicati | Current use: Comm | Permit id: Alt103696 | Parcel: 401842001
2011/11/1535617586300 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
300 Fenway Boston Ma 02115
Installation of new concrete retaining wall and additional site drainage within the open simmons college quad area.
Date:  November 15, 2011
Value:   $85,487
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Excavation borings t | Current use: Comm | Permit id: Sf103624 | Parcel: 401842001
2011/11/158548786300 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
300 Fenway Boston Ma 02115
Utility and electrical infrastructure upgrades to the campus main electrical service.
Date:  February 10, 2012
Value:   $1,490,210
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Electrical | Current use: Comm | Permit id: Sf118876 | Parcel: 401842001
2012/02/10149021086300 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
300 Fenway Boston Ma 02115
Removal of (2) existing steam boilers (1) 8000 gallon oil tank installation of new masonry wall and installation of (2) new steam boilers
Date:  March 8, 2012
Value:   $1,000,203
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Industrial boiler | Current use: Comm | Permit id: Sf123585 | Parcel: 401842001
2012/03/08100020386300 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
300 Fenway Boston Ma 02115
Demolish interior office partitions flooring ceilings.
Date:  June 8, 2012
Value:   $25,000
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Demolition - interio | Current use: Comm | Permit id: Sf149437 | Parcel: 401842000
2012/06/082500086300 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
300 Fenway Boston Ma 02115
Renovate an existing office space - new walls ceiling carpeting electrical hvac fire protection doors.
Date:  June 22, 2012
Value:   $283,762
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Fast track applicati | Current use: Comm | Permit id: Alt149449 | Parcel: 401842000
2012/06/2228376286300 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
300 Fenway Boston Ma 02115
Infill existing interior light well with metal deck and concrete
Date:  July 18, 2012
Value:   $25,000
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Interior/exterior wo | Current use: Comm | Permit id: Alt140982 | Parcel: 401842001
2012/07/182500086300 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
364-372 Congress St Boston Ma 02210
Existing office use is to be converted to hotel use r-1 and will consist of 120 guest rooms with lobby and retail on ground level. Complete renovation of existing structure interior and restoration refurbishment of exterior.; the purpose of this amendment;is to document the change in the emergency g
Date:  August 17, 2012
Contractor: Daniel Lebiedz

Client: Tf Boston Fundi | Permit type: Interior/exterior wo | Current use: Comm | Permit id: A161796 | Parcel: 602654000
2012/08/17086364-372 Congress St Boston Ma 02210Daniel Lebiedz
SCORE
86
99-101 Newbury St Boston Ma 02116
Demo interior walls; build new interior walls; install limited new lights and electrical; modify exisiting fire alarm; install new paint; install new flooring; install new exhaust fan; install new sink.
Date:  March 11, 2013
Value:   $239,334
Contractor: Daniel Lebiedz

Client: New Eng Historical | Permit type: Renovations -interio | Current use: Comm | Permit id: Sf226094 | Parcel: 501292000
2013/03/112393348699-101 Newbury St Boston Ma 02116Daniel Lebiedz
SCORE
86
364-372 Congress St Boston Ma 02210
To amend permit alt45184 to alter the fire sprinkler coverage adjacent to and above elevator equipment in compliance with 780 cmr 903. 2 exception 4. The purpose is to reduce the likelihood of the fire sprinklers discharging water onto the elevator equipment. The amendment will maintain coverage for
Date:  March 11, 2013
Value:   $1
Contractor: Daniel Lebiedz

Client: Tf Boston Fundi | Permit type: Renovations -interio | Current use: Comm | Permit id: A216232 | Parcel: 602654000
2013/03/11186364-372 Congress St Boston Ma 02210Daniel Lebiedz
SCORE
86
2599-2601 Beacon St Brighton Ma 02315
Demolish interior walls ceilings and flooring of football teams locker room.
Date:  May 31, 2013
Value:   $20,543
Contractor: Daniel Lebiedz

Client: Boston College | Permit type: Demolition - interio | Current use: Comm | Permit id: Sf249606 | Parcel: 2102473001
2013/05/3120543862599-2601 Beacon St Brighton Ma 02315Daniel Lebiedz
SCORE
86
2599-2601 Beacon St Brighton Ma 02315
Boston college yawkey center -; renovate existing football locker room; new flooring; new acoustical ceiling; new paint; relocate sprinkler mains and heads; add new lighting; modify hvac
Date:  June 14, 2013
Value:   $139,932
Contractor: Daniel Lebiedz

Client: Boston College | Permit type: Fast track applicati | Current use: Comm | Permit id: Alt252156 | Parcel: 2102473001
2013/06/14139932862599-2601 Beacon St Brighton Ma 02315Daniel Lebiedz
SCORE
86
364 372 Congress St Boston Ma 02210
Perform selective interior and exterior demolition within the existing building.
Date:  November 3, 2011
Value:   $634,000
Contractor: Daniel Lebiedz

Client: Tf Boston Fundi | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf104009 | Parcel: 0602654000
2011/11/0363400086364 372 Congress St Boston Ma 02210Daniel Lebiedz
SCORE
86
364 372 Congress St Boston Ma 02210
Existing office use is to be converted to hotel use r-1 and will consist of 1 guest rooms with lobby and retail on ground level. Complete renovation of existing structure interior and restoration/refurbishment of exterior.; the purpose of this amendment;is to document the change in the emergency generator being installed for the project ( changing from gasoline fueled to diesel fueled );
Date:  August 17, 2012
Contractor: Daniel Lebiedz

Client: Tf Boston Fundi | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: A161796 | Parcel: 0602654000
2012/08/17086364 372 Congress St Boston Ma 02210Daniel Lebiedz
SCORE
86
99 101 Newbury St Boston Ma 02116
Demo interior walls; build new interior walls; install limited new lights and electrical; modify exisiting fire alarm; install new paint; install new flooring; install new exhaust fan; install new sink.
Date:  March 11, 2013
Value:   $239,334
Contractor: Daniel Lebiedz

Client: New Eng Historical | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf226094 | Parcel: 0501292000
2013/03/112393348699 101 Newbury St Boston Ma 02116Daniel Lebiedz
SCORE
86
364 372 Congress St Boston Ma 02210
To amend permit alt45184 to alter the fire sprinkler coverage adjacent to and above elevator equipment in compliance with 7 cmr 903. 2 exception 4. The purpose is to reduce the likelihood of the fire sprinklers discharging water onto the elevator equipment. The amendment will maintain coverage for the remainder of the atrium floor area the elevator zone in which no sprinklers are allowed (sketches c and d and annotated drawings a2. 4 and a2. 5). Attached sketches skfp-003 and skfp-004 show the proposed fire sprinkler layouts at the atrium ground floor and the atrium skylight in conformance with the elevator code and 7 cmr 903. 2 exception 4).; we request that isd and the boston fire department approve this amendment to the building permit to omit fire sprinklers in the designated elevator area and modify other sprinklers as shown in the attached diagrams.
Date:  March 11, 2013
Value:   $1
Contractor: Daniel Lebiedz

Client: Tf Boston Fundi | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: A216232 | Parcel: 0602654000
2013/03/11186364 372 Congress St Boston Ma 02210Daniel Lebiedz
SCORE
86
2599 2601 Beacon St Brighton Ma 02315
Demolish interior walls ceilings and flooring of football teams locker room.
Date:  May 31, 2013
Value:   $20,543
Contractor: Daniel Lebiedz

Client: Boston College | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf249606 | Parcel: 2102473001
2013/05/3120543862599 2601 Beacon St Brighton Ma 02315Daniel Lebiedz
SCORE
86
2599 2601 Beacon St Brighton Ma 02315
Boston college yawkey center -; renovate existing football locker room; new flooring; new acoustical ceiling; new paint; relocate sprinkler mains and heads; add new lighting; modify hvac
Date:  June 14, 2013
Value:   $139,932
Contractor: Daniel Lebiedz

Client: Boston College | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt252156 | Parcel: 2102473001
2013/06/14139932862599 2601 Beacon St Brighton Ma 02315Daniel Lebiedz
SCORE
86
275 Brookline Av Boston Ma 02215
Remove and dispose of exterior windows; remove interior carpeting; remove cmu tub surrounds. (for demo only)
Date:  June 22, 2012
Value:   $50,000
Contractor: Daniel Lebiedz

Permit type: Demolition - exterior | Current use: 7more | Permit id: Sf156114
2012/06/225000086275 Brookline Av Boston Ma 02215Daniel Lebiedz
SCORE
86
99101 Newbury St Boston Ma 02116
Demo interior walls; build new interior walls; install limited new lights and electrical; modify exisiting fire alarm; install new paint; install new flooring; install new exhaust fan; install new sink.
Date:  March 11, 2013
Value:   $239,334
Contractor: Daniel Lebiedz

Client: New England Historical | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf226094 | Parcel: 0501292000
2013/03/112393348699101 Newbury St Boston Ma 02116Daniel Lebiedz
SCORE
86
3 Fenway Boston Ma 02115
Demolish interior office partitions flooring ceilings.
Date:  June 8, 2012
Value:   $25,000
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf149437 | Parcel: 0401842000
2012/06/0825000863 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
3 Fenway Boston Ma 02115
Installation of new concrete retaining wall and additional site drainage within the open simmons college quad area.
Date:  November 15, 2011
Value:   $85,487
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Excavation borings test pits | Permit status: Expired | Current use: Comm | Permit id: Sf103624 | Parcel: 0401842000
2011/11/1585487863 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
3 Fenway Boston Ma 02115
Utility and electrical infrastructure upgrades to the campus main electrical service.
Date:  February 10, 2012
Value:   $1,490,210
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: Sf118876 | Parcel: 0401842001
2012/02/101490210863 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
3 Fenway Boston Ma 02115
Infill existing interior light well with metal deck and concrete
Date:  July 18, 2012
Value:   $25,000
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: Alt140982 | Parcel: 0401842001
2012/07/1825000863 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
3 Fenway Boston Ma 02115
Renovate an existing office space - new walls ceiling carpeting electrical hvac fire protection doors.
Date:  June 22, 2012
Value:   $283,762
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt149449 | Parcel: 0401842001
2012/06/22283762863 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
255 Brookline Av Boston Ma 02215
Remove existing toilet partitions sinks vanities toilets small slab area for new underground plumbing. (for demo only)
Date:  June 22, 2012
Value:   $20,000
Contractor: Daniel Lebiedz

Client: Simmons College | Permit type: Demolition - interior | Current use: 7more | Permit id: Sf156124 | Parcel: 402017000
2012/06/222000086255 Brookline Av Boston Ma 02215Daniel Lebiedz
SCORE
86
364372 Congress St Boston Ma 02210
Perform selective interior and exterior demolition within the existing building.
Date:  November 3, 2011
Value:   $634,000
Contractor: Daniel Lebiedz

Client: Cfs Seaport Llc | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf104009 | Parcel: 0602654000
2011/11/0363400086364372 Congress St Boston Ma 02210Daniel Lebiedz
SCORE
86
3 Fenway Boston Ma 02115
2nd floor - build out existing vacant space with new drywall partitions electrical hvac fire protection and interior finishes 4th floor - selectively demolish some existing interior drywall partitions. Install new drywall partitions electrical hvac fire protection and interior finishes.
Date:  November 15, 2011
Value:   $356,175
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt103696 | Parcel: 0401842000
2011/11/15356175863 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
3 Fenway Boston Ma 02115
Removal of (2) existing steam boilers (1) 80 gallon oil tank installation of new masonry wall and installation of (2) new steam boilers
Date:  March 8, 2012
Value:   $1,000,203
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Industrial boiler | Permit status: Expired | Current use: Comm | Permit id: Sf123585 | Parcel: 0401842001
2012/03/081000203863 Fenway Boston Ma 02115Daniel Lebiedz
SCORE
86
364372 Congress St Boston Ma 02210
To amend permit alt45184 to alter the fire sprinkler coverage adjacent to and above elevator equipment in compliance with 7 cmr 903. 2 exception 4. The purpose is to reduce the likelihood of the fire sprinklers discharging water onto the elevator equipment. The amendment will maintain coverage for the remainder of the atrium floor area the elevator zone in which no sprinklers are allowed (sketches c and d and annotated drawings a2. 4 and a2. 5). Attached sketches skfp-003 and skfp-004 show the proposed fire sprinkler layouts at the atrium ground floor and the atrium skylight in conformance with the elevator code and 7 cmr 903. 2 exception 4).; we request that isd and the boston fire department approve this amendment to the building permit to omit fire sprinklers in the designated elevator area and modify other sprinklers as shown in the attached diagrams.
Date:  March 11, 2013
Value:   $1
Contractor: Daniel Lebiedz

Client: Cfs Seaport Llc | Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: A216232 | Parcel: 0602654000
2013/03/11186364372 Congress St Boston Ma 02210Daniel Lebiedz
SCORE
86
25992601 Beacon St Brighton Ma 02315
Boston college yawkey center -; renovate existing football locker room; new flooring; new acoustical ceiling; new paint; relocate sprinkler mains and heads; add new lighting; modify hvac
Date:  June 14, 2013
Value:   $139,932
Contractor: Daniel Lebiedz

Client: Boston College Trs Of | Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt252156 | Parcel: 2102473001
2013/06/141399328625992601 Beacon St Brighton Ma 02315Daniel Lebiedz
SCORE
86
364372 Congress St Boston Ma 02210
Existing office use is to be converted to hotel use r-1 and will consist of 1 guest rooms with lobby and retail on ground level. Complete renovation of existing structure interior and restoration refurbishment of exterior.; the purpose of this amendment;is to document the change in the emergency generator being installed for the project ( changing from gasoline fueled to diesel fueled );
Date:  August 17, 2012
Contractor: Daniel Lebiedz

Client: Cfs Seaport Llc | Permit type: Interior/exterior work | Permit status: Expired | Current use: Comm | Permit id: A161796 | Parcel: 0602654000
2012/08/17086364372 Congress St Boston Ma 02210Daniel Lebiedz
SCORE
86
25992601 Beacon St Brighton Ma 02315
Demolish interior walls ceilings and flooring of football teams locker room.
Date:  May 31, 2013
Value:   $20,543
Contractor: Daniel Lebiedz

Client: Boston College Trs Of | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf249606 | Parcel: 2102473001
2013/05/31205438625992601 Beacon St Brighton Ma 02315Daniel Lebiedz
SCORE
86
4 Huntington Av Boston Ma 02115
Legal use and occupancy is gymnasium physical education office classroom. Certificate of use and occupancy for gymnasium alt71814 issued 6/10/11
Date:  October 20, 2011
Contractor: Daniel Lebiedz

Client: Northeastern University | Permit status: Expired | Permit id: Coo94948 | Parcel: 0402236000
2011/10/200864 Huntington Av Boston Ma 02115Daniel Lebiedz
SCORE
86
4 Huntington Av Boston Ma 02115
Demolish interior finishes of existing weight room facility original contract submitted with alt71814.
Date:  May 23, 2011
Value:   $58,000
Contractor: Daniel Lebiedz

Client: Northeastern University | Permit type: Demolition - interior | Permit status: Expired | Current use: Comm | Permit id: Sf77881 | Parcel: 0402236000
2011/05/2358000864 Huntington Av Boston Ma 02115Daniel Lebiedz
SCORE
86
3 Fenway Boston Ma
2nd floor - build out existing vacant space with new drywall partitions electrical hvac fire protection and interior finishes 4th floor - selectively demolish some existing interior drywall partitions. Install new drywall partitions electrical hvac fire protection and interior finishes.
Date:  November 15, 2011
Value:   $356,175
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Long form/alteration permit | Expiration date: May 15, 2012 | Current use: Comm | Permit id: Alt103696 | Parcel: 0401842000
2011/11/15356175863 Fenway Boston MaDaniel Lebiedz
SCORE
86
3 Fenway Boston Ma
Installation of new concrete retaining wall and additional site drainage within the open simmons college quad area.
Date:  November 15, 2011
Value:   $85,487
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Short form bldg permit | Expiration date: May 15, 2012 | Current use: Comm | Permit id: Sf103624 | Parcel: 0401842000
2011/11/1585487863 Fenway Boston MaDaniel Lebiedz
SCORE
86
4 Huntington Av Boston Ma
Demolish interior finishes of existing weight room facility original contract submitted with alt71814.
Date:  May 23, 2011
Value:   $58,000
Contractor: Daniel Lebiedz

Client: Northeastern University | Permit type: Short form bldg permit | Expiration date: November 23, 2011 | Current use: Comm | Permit id: Sf77881 | Parcel: 0402236000
2011/05/2358000864 Huntington Av Boston MaDaniel Lebiedz
SCORE
86
275 Brookline Av Boston Ma
Remove and dispose of exterior windows; remove interior carpeting; remove cmu tub surrounds. (for demo only)
Date:  June 22, 2012
Value:   $50,000
Contractor: Daniel Lebiedz

Permit type: Short form bldg permit | Expiration date: December 22, 2012 | Current use: 7more | Permit id: Sf156114
2012/06/225000086275 Brookline Av Boston MaDaniel Lebiedz
SCORE
86
364 372 Congress St Boston Ma
Perform selective interior and exterior demolition within the existing building.
Date:  November 3, 2011
Value:   $634,000
Contractor: Daniel Lebiedz

Client: Tf Boston Fundi | Permit type: Short form bldg permit | Current use: Comm | Permit id: Sf104009 | Parcel: 0602654000
2011/11/0363400086364 372 Congress St Boston MaDaniel Lebiedz
SCORE
86
99 101 Newbury St Boston Ma
Demo interior walls; build new interior walls; install limited new lights and electrical; modify exisiting fire alarm; install new paint; install new flooring; install new exhaust fan; install new sink.
Date:  March 11, 2013
Value:   $239,334
Contractor: Daniel Lebiedz

Client: New Eng Historical | Permit type: Short form bldg permit | Expiration date: September 11, 2013 | Current use: Comm | Permit id: Sf226094 | Parcel: 0501292000
2013/03/112393348699 101 Newbury St Boston MaDaniel Lebiedz
SCORE
86
2599 2601 Beacon St Brighton Ma
Boston college yawkey center -; renovate existing football locker room; new flooring; new acoustical ceiling; new paint; relocate sprinkler mains and heads; add new lighting; modify hvac
Date:  June 14, 2013
Value:   $139,932
Contractor: Daniel Lebiedz

Client: Boston College | Permit type: Long form/alteration permit | Expiration date: December 14, 2013 | Current use: Comm | Permit id: Alt252156 | Parcel: 2102473001
2013/06/14139932862599 2601 Beacon St Brighton MaDaniel Lebiedz
SCORE
86
3 Fenway Boston Ma
Renovate an existing office space - new walls ceiling carpeting electrical hvac fire protection doors.
Date:  June 22, 2012
Value:   $283,762
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Long form/alteration permit | Expiration date: December 22, 2012 | Current use: Comm | Permit id: Alt149449 | Parcel: 0401842000
2012/06/22283762863 Fenway Boston MaDaniel Lebiedz
SCORE
86
2599 2601 Beacon St Brighton Ma
Demolish interior walls ceilings and flooring of football teams locker room.
Date:  May 31, 2013
Value:   $20,543
Contractor: Daniel Lebiedz

Client: Boston College | Permit type: Short form bldg permit | Expiration date: November 30, 2013 | Current use: Comm | Permit id: Sf249606 | Parcel: 2102473001
2013/05/3120543862599 2601 Beacon St Brighton MaDaniel Lebiedz
SCORE
86
364 372 Congress St Boston Ma
To amend permit alt45184 to alter the fire sprinkler coverage adjacent to and above elevator equipment in compliance with 7 cmr 903. 2 exception 4. The purpose is to reduce the likelihood of the fire sprinklers discharging water onto the elevator equipment. The amendment will maintain coverage for the remainder of the atrium floor area the elevator zone in which no sprinklers are allowed (sketches c and d and annotated drawings a2. 4 and a2. 5). Attached sketches skfp-003 and skfp-004 show the proposed fire sprinkler layouts at the atrium ground floor and the atrium skylight in conformance with the elevator code and 7 cmr 903. 2 exception 4).; we request that isd and the boston fire department approve this amendment to the building permit to omit fire sprinklers in the designated elevator area and modify other sprinklers as shown in the attached diagrams.
Date:  March 11, 2013
Value:   $1
Contractor: Daniel Lebiedz

Client: Tf Boston Fundi | Permit type: Amendment to a long form | Expiration date: September 11, 2013 | Current use: Comm | Permit id: A216232 | Parcel: 0602654000
2013/03/11186364 372 Congress St Boston MaDaniel Lebiedz
SCORE
86
3 Fenway Boston Ma
Demolish interior office partitions flooring ceilings.
Date:  June 8, 2012
Value:   $25,000
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Short form bldg permit | Expiration date: December 8, 2012 | Current use: Comm | Permit id: Sf149437 | Parcel: 0401842001
2012/06/0825000863 Fenway Boston MaDaniel Lebiedz
SCORE
86
3 Fenway Boston Ma
Removal of (2) existing steam boilers (1) 80 gallon oil tank installation of new masonry wall and installation of (2) new steam boilers
Date:  March 8, 2012
Value:   $1,000,203
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Short form bldg permit | Expiration date: September 8, 2012 | Current use: Comm | Permit id: Sf123585 | Parcel: 0401842001
2012/03/081000203863 Fenway Boston MaDaniel Lebiedz
SCORE
86
3 Fenway Boston Ma
Infill existing interior light well with metal deck and concrete
Date:  July 18, 2012
Value:   $25,000
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Long form/alteration permit | Expiration date: January 18, 2013 | Current use: Comm | Permit id: Alt140982 | Parcel: 0401842001
2012/07/1825000863 Fenway Boston MaDaniel Lebiedz
SCORE
86
3 Fenway Boston Ma
Utility and electrical infrastructure upgrades to the campus main electrical service.
Date:  February 10, 2012
Value:   $1,490,210
Contractor: Daniel Lebiedz

Client: Isabella Stewar | Permit type: Short form bldg permit | Expiration date: August 10, 2012 | Current use: Comm | Permit id: Sf118876 | Parcel: 0401842001
2012/02/101490210863 Fenway Boston MaDaniel Lebiedz
SCORE
86
255 Brookline Av Boston Ma
Remove existing toilet partitions sinks vanities toilets small slab area for new underground plumbing. (for demo only)
Date:  June 22, 2012
Value:   $20,000
Contractor: Daniel Lebiedz

Client: Simmons Female | Permit type: Short form bldg permit | Expiration date: December 22, 2012 | Current use: 7more | Permit id: Sf156124 | Parcel: 0402017000
2012/06/222000086255 Brookline Av Boston MaDaniel Lebiedz
SCORE
86
364 372 Congress St Boston Ma
Existing office use is to be converted to hotel use r-1 and will consist of 1 guest rooms with lobby and retail on ground level. Complete renovation of existing structure interior and restoration/refurbishment of exterior.; the purpose of this amendment;is to document the change in the emergency generator being installed for the project ( changing from gasoline fueled to diesel fueled );
Date:  August 17, 2012
Contractor: Daniel Lebiedz

Client: Tf Boston Fundi | Permit type: Amendment to a long form | Expiration date: February 17, 2013 | Current use: Comm | Permit id: A161796 | Parcel: 0602654000
2012/08/17086364 372 Congress St Boston MaDaniel Lebiedz
SCORE
86
25992601 Beacon St Brighton Ma
Demolish interior walls ceilings and flooring of football teams locker room.
Date:  May 31, 2013
Value:   $20,543
Contractor: Daniel Lebiedz

Client: Boston College Trs Of | Permit type: Short form bldg permit | Expiration date: November 30, 2013 | Current use: Comm | Permit id: Sf249606 | Parcel: 2102473001
2013/05/31205438625992601 Beacon St Brighton MaDaniel Lebiedz
SCORE
86
364372 Congress St Boston Ma
Existing office use is to be converted to hotel use r-1 and will consist of 1 guest rooms with lobby and retail on ground level. Complete renovation of existing structure interior and restoration refurbishment of exterior.; the purpose of this amendment;is to document the change in the emergency generator being installed for the project ( changing from gasoline fueled to diesel fueled );
Date:  August 17, 2012
Contractor: Daniel Lebiedz

Client: Cfs Seaport Llc | Permit type: Amendment to a long form | Expiration date: February 17, 2013 | Current use: Comm | Permit id: A161796 | Parcel: 0602654000
2012/08/17086364372 Congress St Boston MaDaniel Lebiedz
SCORE
86
364372 Congress St Boston Ma
To amend permit alt45184 to alter the fire sprinkler coverage adjacent to and above elevator equipment in compliance with 7 cmr 903. 2 exception 4. The purpose is to reduce the likelihood of the fire sprinklers discharging water onto the elevator equipment. The amendment will maintain coverage for the remainder of the atrium floor area the elevator zone in which no sprinklers are allowed (sketches c and d and annotated drawings a2. 4 and a2. 5). Attached sketches skfp-003 and skfp-004 show the proposed fire sprinkler layouts at the atrium ground floor and the atrium skylight in conformance with the elevator code and 7 cmr 903. 2 exception 4).; we request that isd and the boston fire department approve this amendment to the building permit to omit fire sprinklers in the designated elevator area and modify other sprinklers as shown in the attached diagrams.
Date:  March 11, 2013
Value:   $1
Contractor: Daniel Lebiedz

Client: Cfs Seaport Llc | Permit type: Amendment to a long form | Expiration date: September 11, 2013 | Current use: Comm | Permit id: A216232 | Parcel: 0602654000
2013/03/11186364372 Congress St Boston MaDaniel Lebiedz
SCORE
86
25992601 Beacon St Brighton Ma
Boston college yawkey center -; renovate existing football locker room; new flooring; new acoustical ceiling; new paint; relocate sprinkler mains and heads; add new lighting; modify hvac
Date:  June 14, 2013
Value:   $139,932
Contractor: Daniel Lebiedz

Client: Boston College Trs Of | Permit type: Long form/alteration permit | Expiration date: December 14, 2013 | Current use: Comm | Permit id: Alt252156 | Parcel: 2102473001
2013/06/141399328625992601 Beacon St Brighton MaDaniel Lebiedz
SCORE
86
364372 Congress St Boston Ma
Perform selective interior and exterior demolition within the existing building.
Date:  November 3, 2011
Value:   $634,000
Contractor: Daniel Lebiedz

Client: Cfs Seaport Llc | Permit type: Short form bldg permit | Current use: Comm | Permit id: Sf104009 | Parcel: 0602654000
2011/11/0363400086364372 Congress St Boston MaDaniel Lebiedz
SCORE
86
99101 Newbury St Boston Ma
Demo interior walls; build new interior walls; install limited new lights and electrical; modify exisiting fire alarm; install new paint; install new flooring; install new exhaust fan; install new sink.
Date:  March 11, 2013
Value:   $239,334
Contractor: Daniel Lebiedz

Client: New England Historical | Permit type: Short form bldg permit | Expiration date: September 11, 2013 | Current use: Comm | Permit id: Sf226094 | Parcel: 0501292000
2013/03/112393348699101 Newbury St Boston MaDaniel Lebiedz
SCORE
86
4 Huntington Av Boston Ma
Legal use and occupancy is gymnasium physical education office classroom. Certificate of use and occupancy for gymnasium alt71814 issued 6/10/11
Date:  October 20, 2011
Contractor: Daniel Lebiedz

Client: Northeastern University | Permit type: Certificate of occupancy | Permit id: Coo94948 | Parcel: 0402236000
2011/10/200864 Huntington Av Boston MaDaniel Lebiedz
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.