QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 80 4954 Macarthur Boulevard Nw Washington Dc This project is for building interior sprinkler system of the existing schoolhouse as well as providing new fireline, install seventeen (17) feet of six (6) inch dip for fire service line within the right-of-way and site property as well as twenty-two (22) feet of six (6) inch dip for a new fire hydrant in the grass median. Date: October 24, 2016 Contractor: Christopher HeiserClient: Donald Kirk | Permit type: Paving; curb & gutter | Permit status: Revise and resubmit | Expiration date: August 31, 2017 | |||||
SCORE 80 4954 Macarthur Boulevard Nw Washington Dc Paving; curb & gutter(s), paving; sidewalk(s), excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; fire hydrant(s), excavation; valves (excavation), excavation; water lateral conn over 2" pipe (trench) Contractor: Christopher HeiserPermit status: 10 | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 80 4954 Macarthur Boulevard Nw Washington Dc This project is for building interior sprinkler system of the existing schoolhouse as well as providing new fireline, install seventeen (17) feet of six (6) inch dip for fire service line within the right-of-way and site property as well as twenty-two (22) feet of six (6) inch dip for a new fire hydrant in the grass median. Contractor: Christopher HeiserPermit status: Revise and resubmit | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 80 4954 Macarthur Boulevard Nw Washington Dc This project is for building interior sprinkler system of the existing schoolhouse as well as providing new fireline, install sixty (60) feet of six (6) inch d. I. P. For fire service line within the right-of-way and site property as well as nineteen (19) feet of six (6) inch d. I. P. For a new fire hydrant in the grass median. Date: August 14, 2017 Contractor: Christopher HeiserClient: Donald Kirk | Permit type: Excavation; fire hydrant(s), excavation; valves (excavation), excavation; water lateral conn over 2" pipe (trench) | Permit status: Assigned | Expiration date: December 16, 2017 | Permit id: 0 | |||||
SCORE 80 4954 Macarthur Boulevard Nw Washington Dc Paving; curb & gutter(s), paving; sidewalk(s), excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; fire hydrant(s), excavation; valves (excavation), excavation; water lateral conn over 2" pipe (trench) Contractor: Christopher HeiserPermit status: 3 | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 80 4954 Macarthur Boulevard Nw Washington Dc Excavation; fire hydrant(s), excavation; valves (excavation), excavation; water lateral conn over 2" pipe (trench) Contractor: Christopher HeiserPermit status: 12 | Expiration date: December 16, 2017 | Permit id: 0 | |||||
SCORE 80 4954 Macarthur Boulevard Nw Washington Dc This project is for building interior sprinkler system of the existing schoolhouse as well as providing new fireline, install seventeen (17) feet of six (6) inch dip for fire service line within the right-of-way and site property as well as twenty-two (22) feet of six (6) inch dip for a new fire hydrant in the grass median. Contractor: Christopher HeiserPermit status: Cancel/withdrawn | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 80 4954 Macarthur Boulevard Nw Washington Dc This project is for building interior sprinkler system of the existing schoolhouse as well as providing new fireline, install sixty (60) feet of six (6) inch d. I. P. For fire service line within the right-of-way and site property as well as nineteen (19) feet of six (6) inch d. I. P. For a new fire hydrant in the grass median. Contractor: Christopher HeiserPermit status: Assigned | Expiration date: December 16, 2017 | Permit id: 0 | |||||
SCORE 80 4954 Macarthur Boulevard Nw Washington Dc This project is for building interior sprinkler system of the existing schoolhouse as well as providing new fireline, install seventeen (17) feet of six (6) inch dip for fire service line within the right-of-way and site property as well as twenty-two (22) feet of six (6) inch dip for a new fire hydrant in the grass median. Date: October 24, 2016 Contractor: Christopher HeiserClient: Donald Kirk | Permit type: Paving; curb & gutter | Permit status: Cancel/withdrawn | Expiration date: August 31, 2017 | Permit id: 0 |