QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 102 Revere St, Port Charlotte, Fl 33952 This work will place 786 of 48 fiber optic cable from the century link central office located at 3391 tamiami trail and harbor blvd. To the cell tower located on the west side of harbor blvd. The proposed fiber will be placed within the existing under ground manhole conduit system and become direct buried from mh #300004 (see sheet 5) to the existing cell tower fence to a proposed fiber vault. A 12 fiber will be placed to the tower thru customer provided conduit on private property. Date: July 19, 2011 Contractor: Centurylink ContractorPermit type: Utility - internet | Permit status: Closed | Permit id: 20110505632 | Parcel: 402222179035 | |||||
SCORE 59 102 Revere St, Port Charlotte, Fl 33952 This work will place 786 of 48 fiber optic cable from the century link central office located at 3391 tamiami trail and harbor blvd. To the cell tower located on the west side of harbor blvd. The proposed fiber will be placed within the existing under ground manhole conduit system and become direct buried from mh #300004 (see sheet 5) to the existing cell tower fence to a proposed fiber vault. A 12 fiber will be placed to the tower thru customer provided conduit on private property. Date: July 19, 2011 Contractor: Centurylink ContractorPermit type: Ld - row utility-internet | Permit status: Closed | Completion date: July 19, 2011 | Current use: Row | Permit id: 20110505632 | Parcel: 402222179035 |