SCORE

BRET YOUNT

ABOUT BRET YOUNT

Bret Yount specializes in:

Bret Yount offers services:

Based on the information received from , associated with Bret Yount over the past .

If you are considering hiring Bret Yount for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Bret Yount has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
82
Suitland Parkway Se Northbound And Ramp To South Capitol Street Northbound Washington Parkway
Nustar terminals operations partnership l. P. Proposes to complete the excavation of the jet fuel pipeline at 8 locations within district of columbia resources to locate pipe casings. All excavations will be completed with a vacuum excavator minimizing each excavation to no more than 16 inches in diameter. The majority of the excavations will be located in grassy areas. However, two (2) excavations will require coring of a bike path and a sidewalk. These two (2) of the locations will require lane closures, for which a traffic plan and traffic control will be provided. Upon exposure of the pipeline at each of these locations, wire leads will be attached to the line. The attachment point for the leads on the pipeline will be recoated and the leads will run up into a flush mount test station at the ground surface (see attached detail drawing). The excavation will be backfilled with the excavated soil and any penetrations through concrete/ asphalt will be patched with a proper material. The
Date:  April 12, 2016
Contractor: Bret Yount

Permit type: Excavation; keyhole (utility co. Only) | Permit status: Issued | Expiration date: October 13, 2016 | Permit id: Pa126131
2016/04/12082Suitland Parkway Se Northbound And Ramp To South Capitol Street Northbound Washington ParkwayBret Yount
SCORE
82
Suitland Parkway Se Northbound And Ramp To South Capitol Street Northbound Washington Parkway
Nustar terminals operations partnership l. P. Proposes to complete the excavation of the jet fuel pipeline at 8 locations within district of columbia resources to locate pipe casings. All excavations will be completed with a vacuum excavator minimizing each excavation to no more than 16 inches in diameter. The majority of the excavations will be located in grassy areas. However, two (2) excavations will require coring of a bike path and a sidewalk. These two (2) of the locations will require lane closures, for which a traffic plan and traffic control will be provided. Upon exposure of the pipeline at each of these locations, wire leads will be attached to the line. The attachment point for the leads on the pipeline will be recoated and the leads will run up into a flush mount test station at the ground surface (see attached detail drawing). The excavation will be backfilled with the excavated soil and any penetrations through concrete/ asphalt will be patched with a proper material. The
Date:  September 29, 2016
Contractor: Bret Yount

Permit type: Excavation; keyhole (utility co. Only) | Permit status: Issued | Expiration date: December 12, 2016 | Permit id: Pa126131-R1
2016/09/29082Suitland Parkway Se Northbound And Ramp To South Capitol Street Northbound Washington ParkwayBret Yount
SCORE
82
Exit 3b From Interstate 295 Northbound To Suitland Parkway Se Washington 3b
This is a revision to the existing permit pa126131 (tracking #184512) adding two traffic control plans for required road closures. These plans are for suitland parkway and sheridan, and 295 underpass.
Date:  October 11, 2016
Contractor: Bret Yount

Client: Bill Jochem | Permit type: Excavation; keyhole (utility co. Only) | Permit status: Assigned | Expiration date: January 26, 2017
2016/10/11082Exit 3b From Interstate 295 Northbound To Suitland Parkway Se Washington 3bBret Yount
SCORE
82
Suitland Parkway Se Northbound And Ramp To South Capitol Street Northbound Washington Dc
Nustar terminals operations partnership l. P. Proposes to complete the excavation of the jet fuel pipeline at 8 locations within district of columbia resources to locate pipe casings. All excavations will be completed with a vacuum excavator minimizing each excavation to no more than 16 inches in diameter. The majority of the excavations will be located in grassy areas. However, two (2) excavations will require coring of a bike path and a sidewalk. These two (2) of the locations will require lane closures, for which a traffic plan and traffic control will be provided. Upon exposure of the pipeline at each of these locations, wire leads will be attached to the line. The attachment point for the leads on the pipeline will be recoated and the leads will run up into a flush mount test station at the ground surface (see attached detail drawing). The excavation will be backfilled with the excavated soil and any penetrations through concrete asphalt will be patched with a proper material. The
Date:  April 12, 2016
Contractor: Bret Yount

Permit type: Excavation; keyhole (utility co. Only) | Permit status: Permit expired | Expiration date: October 13, 2016 | Permit id: Pa126131
2016/04/12082Suitland Parkway Se Northbound And Ramp To South Capitol Street Northbound Washington DcBret Yount
SCORE
82
Suitland Parkway Se Northbound And Ramp To South Capitol Street Northbound Washington Dc
Nustar terminals operations partnership l. P. Proposes to complete the excavation of the jet fuel pipeline at 8 locations within district of columbia resources to locate pipe casings. All excavations will be completed with a vacuum excavator minimizing each excavation to no more than 16 inches in diameter. The majority of the excavations will be located in grassy areas. However, two (2) excavations will require coring of a bike path and a sidewalk. These two (2) of the locations will require lane closures, for which a traffic plan and traffic control will be provided. Upon exposure of the pipeline at each of these locations, wire leads will be attached to the line. The attachment point for the leads on the pipeline will be recoated and the leads will run up into a flush mount test station at the ground surface (see attached detail drawing). The excavation will be backfilled with the excavated soil and any penetrations through concrete asphalt will be patched with a proper material. The
Date:  September 29, 2016
Contractor: Bret Yount

Permit type: Excavation; keyhole (utility co. Only) | Permit status: Permit expired | Expiration date: December 12, 2016 | Permit id: Pa126131-R1
2016/09/29082Suitland Parkway Se Northbound And Ramp To South Capitol Street Northbound Washington DcBret Yount
SCORE
82
Exit 3b From Interstate 295 Northbound To Suitland Parkway Se Washington Dc
This is a revision to the existing permit pa126131 (tracking #184512) adding two traffic control plans for required road closures. These plans are for suitland parkway and sheridan, and 295 underpass.
Date:  October 11, 2016
Contractor: Bret Yount

Client: Bill Jochem | Permit type: Excavation; keyhole (utility co. Only) | Permit status: Issued | Expiration date: January 26, 2017 | Permit id: Pa184913
2016/10/11082Exit 3b From Interstate 295 Northbound To Suitland Parkway Se Washington DcBret Yount
SCORE
82
Sheridan Road Se And Ramp From Sutiland Parkway Se Northbound Washington Dc
The work to be completed includes borings and minimally invasive excavations within the work location. The purpose of these excavations is to investigate a pipeline casing that may need repair. This work is for utility purposes only.
Date:  August 14, 2017
Contractor: Bret Yount

Client: Craig Kumpel | Permit type: Excavation; boring test pit (single) | Permit status: Issued | Expiration date: November 23, 2017 | Permit id: Pa220477
2017/08/14082Sheridan Road Se And Ramp From Sutiland Parkway Se Northbound Washington DcBret Yount
SCORE
82
Date:  August 8, 2016
Contractor: Bret Yount

Permit status: 8 | Expiration date: October 13, 2016 | Permit id: Pa126131
2016/08/08082Suitland Parkway Se Northbound And Ramp To South Capitol Street Northbound Washington DcBret Yount
SCORE
82
Date:  November 28, 2016
Contractor: Bret Yount

Permit status: 8 | Expiration date: January 26, 2017 | Permit id: Pa184913
2016/11/28082Exit 3b From Interstate 295 Northbound To Suitland Parkway Se Washington DcBret Yount
SCORE
82
Date:  September 19, 2017
Contractor: Bret Yount

Permit status: 9 | Expiration date: November 23, 2017 | Permit id: Pa220477
2017/09/19082Sheridan Road Se And Ramp From Sutiland Parkway Se Northbound Washington DcBret Yount
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.