SCORE 82 Contractor: Bohler DcPermit status: 1 | Expiration date: December 30, 2016 | Permit id: 0 | |||||
SCORE 82 301 N Street Ne Washington Dc Paving; ada curb ramp, paving; alley(s), paving; curb & gutter(s), paving; driveway(s) close existing, paving; driveway(s) repair or replace, paving; lay-by (new), paving; roadway(s), paving; sidewalk (porous pervious), paving; sidewalk(s), fixture; bench(es), fixture; bike rack(s), fixture; bollard(s) (exception), fixture; planter box on sidewalk (exception), fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; stormwater mgmt (serve public), landscaping; stormwater mgmt (w curb drain), landscaping; tree planting, landscaping; tree space (stormwater mgmt) Contractor: Bohler DcPermit status: 12 | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 82 7201 Georgia Avenue Nw Washington Dc Paving; curb & gutter(s), paving; sidewalk(s), projections; window well(s) Contractor: Bohler DcPermit status: 3 | Expiration date: June 22, 2017 | Permit id: 0 | |||||
SCORE 82 201 Tingey Street Se Washington Dc Paving; ada curb ramp, paving; curb & gutter(s), paving; roadway(s), paving; sidewalk (porous pervious), paving; sidewalk(s), fixture; bench(es), fixture; retaining wall to 42", landscaping; new tree space(s), landscaping; stormwater mgmt (serve public), landscaping; tree planting, landscaping; tree space (stormwater mgmt), excavation; storm lateral conn over 4" (trench), over head work; streetlight(s) installation, fixture; sign (w footings)(exception) Contractor: Bohler DcPermit status: 12 | Expiration date: May 2, 2018 | Permit id: 0 | |||||
SCORE 82 56 2nd Street Ne Washington Dc Paving; curb & gutter(s), paving; leadwalk only, paving; sidewalk(s), landscaping; tree planting, landscaping; tree removal, landscaping; tree space (stormwater mgmt), over head work; streetlight(s) installation Contractor: Bohler DcPermit status: 11 | Expiration date: April 19, 2018 | Permit id: 0 | |||||
SCORE 82 Date: March 13, 2017 Contractor: Bohler DcPermit status: 9 | Expiration date: December 6, 2017 | Permit id: Pa187307 | |||||
SCORE 82 Date: November 22, 2016 Contractor: Bohler DcPermit status: 8 | Expiration date: February 28, 2017 | Permit id: Pa186363 | |||||
SCORE 82 1711 Florida Avenue Nw Washington Dc Paving; curb & gutter(s), paving; driveway(s) close existing, paving; driveway(s) new -residential, paving; leadwalk w steps, paving; mill and overlay, paving; sidewalk(s), fixture; bike rack(s), landscaping; new tree space(s), landscaping; replacement tree, landscaping; tree space (stormwater mgmt), projections; stoop & steps, projections; window well(s), over head work; pole removal (single or first one), over head work; streetlight(s) installation Contractor: Bohler DcPermit status: 3 | Expiration date: April 13, 2018 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: 10 | Expiration date: July 31, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: 3 | Expiration date: March 21, 2018 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: December 30, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: November 24, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: January 5, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 10, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Date: February 7, 2017 Contractor: Bohler DcPermit status: Issued | Expiration date: July 26, 2017 | Permit id: Pa10372277 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: August 5, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: September 6, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Resubmit | Expiration date: September 9, 2017 | Permit id: 0 | |||||
SCORE 82 Date: March 27, 2017 Contractor: Bohler DcPermit status: Expired | Expiration date: April 7, 2017 | Permit id: Pa10382284 | |||||
SCORE 82 Date: April 5, 2017 Contractor: Bohler DcPermit status: Expired | Expiration date: April 14, 2017 | Permit id: Pa10394163 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: April 21, 2017 | Permit id: 0 | |||||
SCORE 82 Date: April 21, 2017 Contractor: Bohler DcPermit status: Expired | Expiration date: May 5, 2017 | Permit id: Pa10396106 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: May 11, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: May 5, 2017 | Permit id: 0 | |||||
SCORE 82 Date: May 9, 2017 Contractor: Bohler DcPermit status: Expired | Expiration date: May 20, 2017 | Permit id: Pa10396106-R1 | |||||
SCORE 82 Date: May 12, 2017 Contractor: Bohler DcPermit status: Issued | Expiration date: July 28, 2017 | Permit id: Pa10376874-R1 | |||||
SCORE 82 Date: May 15, 2017 Contractor: Bohler DcPermit status: Expired | Expiration date: May 27, 2017 | Permit id: Pa10400370 | |||||
SCORE 82 Date: May 22, 2017 Contractor: Bohler DcPermit status: Expired | Expiration date: June 3, 2017 | Permit id: Pa10401418 | |||||
SCORE 82 Date: May 24, 2017 Contractor: Bohler DcPermit status: Expired | Expiration date: June 4, 2017 | Permit id: Pa10377836-R2 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Resubmit | Expiration date: November 4, 2017 | Permit id: 0 | |||||
SCORE 82 Date: June 12, 2017 Contractor: Bohler DcPermit status: Issued | Expiration date: September 29, 2017 | Permit id: Pa10371904-R1 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Assigned | Expiration date: December 28, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Assigned | Expiration date: December 31, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Resubmitted | Expiration date: April 19, 2018 | Permit id: 0 | |||||
SCORE 82 7201 Georgia Avenue Nw Washington Dc This is a renewal only to complete the expired permit pa109095 streetscape improvements for the georgia avenue site Date: February 10, 2017 Contractor: Bohler DcPermit status: Issued | Expiration date: January 18, 2018 | Permit id: Pa199537 | |||||
SCORE 82 7201 Georgia Avenue Nw Washington Dc This is an occupancy permit for the streetscape construction permit 199537 for the georgia avenue site Contractor: Bohler DcPermit status: Cancel/withdrawn | Expiration date: June 22, 2017 | Permit id: 0 | |||||
SCORE 82 201 Tingey Street Se Washington Dc The project includes a public park with landscaping and amenities, a perimeter roadway with lid tree pits and permeable pavement, alterations to a portion of new jersey avenue se, construction of wider sidewalk with lid tree pits and permeable pavement along tingey street se, a pedestrian cobble mews lined by lid tree pits on 2nd street se, and a pedestrian cobble mews with associated landscaping on water street se. Contractor: Bohler DcPermit status: Assigned | Expiration date: May 2, 2018 | Permit id: 0 | |||||
SCORE 82 301 N Street Ne Washington Dc This is for the construction of a mixed-use building with underground parking and site amenities Contractor: Bohler DcPermit status: Assigned | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 82 19 M Street Nw Washington Dc Maintain existing curb cut access from 19th street nw to parking facility serving the building located at 19 m street, nw. No repair or replacement will take place. Contractor: Bohler DcPermit status: Revise and resubmit | Expiration date: July 31, 2017 | Permit id: 0 | |||||
SCORE 82 1711 Florida Avenue Nw Washington Dc Proposed work as noted and per attached civil plans. Renewal to permit pa97502-r1 Contractor: Bohler DcPermit status: Cancel/withdrawn | Expiration date: April 13, 2018 | Permit id: 0 | |||||
SCORE 82 9 Bladensburg Road Ne Washington Dc This plan proposed minor streetscape improvements, including three (3) tree spaces for stormwater management and 6 sidewalk with landscaped areas. Please see attached plans for further details. This is a renewal to permit pa113547-r3 which expired 11 22 16. Contractor: Bohler DcPermit status: Pending assignment | Expiration date: August 31, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 10, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: November 24, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: January 5, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: December 30, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: September 6, 2017 | Permit id: 0 | |||||
SCORE 82 Date: January 17, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: March 31, 2017 | Permit id: Pa10370714 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: August 5, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Resubmit | Expiration date: September 9, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: April 21, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Assigned | Expiration date: December 28, 2017 | Permit id: 0 | |||||
SCORE 82 Date: May 30, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: June 2, 2017 | Permit id: Pa10412936 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Resubmit | Expiration date: November 4, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Assigned | Expiration date: December 31, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: May 11, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: May 5, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: 1 | Expiration date: December 30, 2016 | Permit id: 0 | |||||
SCORE 82 2626 Naylor Road Se Washington Dc The proposed work is for the construction of the temporary anchored earth retention system and driven piles for the construction of the skyland town center. Date: April 3, 2017 Contractor: Bohler DcPermit status: Issued | Expiration date: April 2, 2018 | Permit id: Pa183663 | |||||
SCORE 82 7201 Georgia Avenue Nw Washington Dc Paving; curb & gutter(s), paving; sidewalk(s), projections; window well(s) Contractor: Bohler DcPermit status: 3 | Expiration date: June 22, 2017 | Permit id: 0 | |||||
SCORE 82 9 Bladensburg Road Ne Washington Dc This plan proposed minor streetscape improvements, including three (3) tree spaces for stormwater management and 6 sidewalk with landscaped areas. Please see attached plans for further details. This is a renewal to permit pa113547-r3 which expired 11 22 16. Date: March 7, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: May 23, 2017 | Permit id: Pa201359 | |||||
SCORE 82 201 Tingey Street Se Washington Dc Paving; ada curb ramp, paving; curb & gutter(s), paving; roadway(s), paving; sidewalk (porous pervious), paving; sidewalk(s), fixture; bench(es), fixture; retaining wall to 42", landscaping; new tree space(s), landscaping; stormwater mgmt (serve public), landscaping; tree planting, landscaping; tree space (stormwater mgmt), excavation; storm lateral conn over 4" (trench), over head work; streetlight(s) installation, fixture; sign (w footings)(exception) Contractor: Bohler DcPermit status: 10 | Expiration date: May 2, 2018 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: 3 | Expiration date: March 21, 2018 | Permit id: 0 | |||||
SCORE 82 Perry Street Ne And 14th Street Ne Washington Dc The scope of the project is to construct a 1" water service to an existing 8" water main located in perry st ne. The lateral will service the existing park on the northwest corner of the intersection of perry st ne and 14th st ne for seasonal recreational activities. Contractor will need to perform trench repair, repair existing sidewalk and curb gutter as necessary for the installation of the water line. Date: April 21, 2017 Contractor: Bohler DcPermit status: Issued | Expiration date: June 22, 2017 | Permit id: Pa203428 | |||||
SCORE 82 1711 Florida Avenue Nw Washington Dc Paving; curb & gutter(s), paving; driveway(s) close existing, paving; driveway(s) new -residential, paving; leadwalk w steps, paving; mill and overlay, paving; sidewalk(s), fixture; bike rack(s), landscaping; new tree space(s), landscaping; replacement tree, landscaping; tree space (stormwater mgmt), projections; stoop & steps, projections; window well(s), over head work; pole removal (single or first one), over head work; streetlight(s) installation Contractor: Bohler DcPermit status: 3 | Expiration date: April 13, 2018 | Permit id: 0 | |||||
SCORE 82 301 N Street Ne Washington Dc Paving; ada curb ramp, paving; alley(s), paving; curb & gutter(s), paving; driveway(s) close existing, paving; driveway(s) repair or replace, paving; lay-by (new), paving; roadway(s), paving; sidewalk (porous pervious), paving; sidewalk(s), fixture; bench(es), fixture; bike rack(s), fixture; bollard(s) (exception), fixture; planter box on sidewalk (exception), fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; stormwater mgmt (serve public), landscaping; stormwater mgmt (w curb drain), landscaping; tree planting, landscaping; tree space (stormwater mgmt) Contractor: Bohler DcPermit status: 12 | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: 12 | Expiration date: July 31, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: 1 | Expiration date: December 21, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: December 30, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: November 24, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: January 5, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 10, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: August 5, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: September 6, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Resubmit | Expiration date: September 9, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: April 21, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: May 11, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Notpaid | Expiration date: May 5, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Resubmit | Expiration date: November 4, 2017 | Permit id: 0 | |||||
SCORE 82 Date: August 4, 2017 Contractor: Bohler DcPermit status: Issued | Expiration date: October 31, 2017 | Permit id: Pa10376874-R2 | |||||
SCORE 82 Date: July 27, 2017 Contractor: Bohler DcPermit status: Issued | Expiration date: October 31, 2017 | Permit id: Pa10373650-R1 | |||||
SCORE 82 7201 Georgia Avenue Nw Washington Dc This is an occupancy permit for the streetscape construction permit 199537 for the georgia avenue site Contractor: Bohler DcPermit status: Cancel/withdrawn | Expiration date: June 22, 2017 | Permit id: 0 | |||||
SCORE 82 Date: March 27, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: June 24, 2017 | Permit id: Pa186363-R1 | |||||
SCORE 82 9 Bladensburg Road Ne Washington Dc Excavation; clean out (sewer), excavation; manhole installation, excavation; water lateral conn over 2" pipe (trench), excavation; water lateral connection to 2" (trench), excavation; water meter pit (to 2" pipe), excavation; sewer lateral connection to 4" (trench), excavation; sewer ml (trench), excavation; storm lateral conn over 4" (trench) Date: April 6, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: June 3, 2017 | Permit id: Pa202961 | |||||
SCORE 82 1711 Florida Avenue Nw Washington Dc Proposed work as noted and per attached civil plans. Renewal to permit pa97502-r1 Contractor: Bohler DcPermit status: Cancel/withdrawn | Expiration date: April 13, 2018 | Permit id: 0 | |||||
SCORE 82 301 N Street Ne Washington Dc This is for the construction of a mixed-use building with underground parking and site amenities Contractor: Bohler DcPermit status: Assigned | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 82 415 14th Street Se Washington Dc This is a renewal to expired permit pa186363 to remove an off-site red oak tree Contractor: Bohler DcPermit status: Cancel/withdrawn | Expiration date: March 21, 2018 | Permit id: 0 | |||||
SCORE 82 201 Tingey Street Se Washington Dc The project includes a public park with landscaping and amenities, a perimeter roadway with lid tree pits and permeable pavement, alterations to a portion of new jersey avenue se, construction of wider sidewalk with lid tree pits and permeable pavement along tingey street se, a pedestrian cobble mews lined by lid tree pits on 2nd street se, and a pedestrian cobble mews with associated landscaping on water street se. Contractor: Bohler DcPermit status: Revise and resubmit | Expiration date: May 2, 2018 | Permit id: 0 | |||||
SCORE 82 19 M Street Nw Washington Dc New curb cut to replace existing curb cut access from 19th street nw to parking facility serving the building located at 19 m street, nw. Contractor: Bohler DcPermit status: Assigned | Expiration date: July 31, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Approved (pending payment | Expiration date: December 21, 2017 | Permit id: 0 | |||||
SCORE 82 Date: November 29, 2016 Contractor: Bohler DcPermit status: Permit expired | Expiration date: December 10, 2016 | Permit id: Pa10356565 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Date: November 18, 2016 Contractor: Bohler DcPermit status: Permit expired | Expiration date: November 22, 2016 | Permit id: Pa10355970 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: November 24, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: January 5, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 10, 2016 | Permit id: 0 | |||||
SCORE 82 Date: December 5, 2016 Contractor: Bohler DcPermit status: Permit expired | Expiration date: December 23, 2016 | Permit id: Pa10357832 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Rejected | Expiration date: December 23, 2016 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: December 30, 2016 | Permit id: 0 | |||||
SCORE 82 Date: January 30, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: June 2, 2017 | Permit id: Pa10371904 | |||||
SCORE 82 Date: March 31, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: July 1, 2017 | Permit id: Pa10370714-R1 | |||||
SCORE 82 Date: April 21, 2017 Contractor: Bohler DcPermit status: Issued | Expiration date: October 20, 2017 | Permit id: Pa10394888 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: August 5, 2017 | Permit id: 0 | |||||
SCORE 82 Date: May 31, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: October 1, 2017 | Permit id: Pa10375653 | |||||
SCORE 82 Date: March 29, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: May 11, 2017 | Permit id: Pa10376874 | |||||
SCORE 82 Date: March 8, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: May 5, 2017 | Permit id: Pa10377836 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Resubmit | Expiration date: September 9, 2017 | Permit id: 0 | |||||
SCORE 82 Date: February 16, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: August 5, 2017 | Permit id: Pa10373650 | |||||
SCORE 82 Date: June 12, 2017 Contractor: Bohler DcPermit status: Issued | Expiration date: December 5, 2017 | Permit id: Pa10412687 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Withdrawn | Expiration date: September 6, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: May 11, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: May 5, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Not paid | Expiration date: April 21, 2017 | Permit id: 0 | |||||
SCORE 82 Date: July 17, 2017 Contractor: Bohler DcPermit status: Issued | Expiration date: December 31, 2017 | Permit id: Pa10427540 | |||||
SCORE 82 Date: April 21, 2017 Contractor: Bohler DcPermit status: Permit expired | Expiration date: May 15, 2017 | Permit id: Pa10396652 | |||||
SCORE 82 Contractor: Bohler DcPermit status: Resubmit | Expiration date: November 4, 2017 | Permit id: 0 | |||||
SCORE 82 7201 Georgia Avenue Nw Washington Dc We are adding window wells to the existing georgia avenue project. It is in addition to permit pa109095. Date: September 9, 2016 Contractor: Bohler DcClient: Elm Street Development | Permit type: Projections; awning(s), projections; window well(s) | Permit status: Approved (pending payment | Expiration date: December 30, 2016 | |||||
SCORE 82 2626 Naylor Road Se Washington Dc The proposed work is for the construction of the temporary anchored earth retention system and driven piles for the construction of the skyland town center. Date: September 13, 2016 Contractor: Bohler DcClient: Skyland Holdings Llc | Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Revise and resubmit | Expiration date: March 27, 2017 | |||||
SCORE 82 Date: September 15, 2016 Contractor: Bohler DcClient: Johnson Development | Permit type: Paving; driveway(s) new- commercial | Permit status: Assigned | Expiration date: October 27, 2017 | |||||
SCORE 82 Date: November 8, 2016 Contractor: Bohler DcPermit type: Landscaping; tree removal | Permit status: Approved (pending payment | Expiration date: February 28, 2017 | |||||
SCORE 82 2626 Naylor Road Se Washington Dc This permit is a renewal to 120199. It is to complete the work only. Date: November 30, 2016 Contractor: Bohler DcClient: Skyland Holdings Llc | Permit type: Paving; driveway(s) new -residential | Permit status: Assigned | Expiration date: December 6, 2017 | |||||
SCORE 82 7201 Georgia Avenue Nw Washington Dc This is an extension to the expired permit pa109095 streetscape improvements for the georgia avenue site Date: January 19, 2017 Contractor: Bohler DcPermit type: Paving; curb & gutter | Permit status: Assigned | Expiration date: January 18, 2018 | |||||
SCORE 82 7201 Georgia Avenue Nw Washington Dc This is an occupancy permit for the streetscape construction permit 199537 for the georgia avenue site Date: January 19, 2017 Contractor: Bohler DcPermit type: Paving; curb & gutter(s), paving; sidewalk(s), projections; window well(s) | Permit status: Assigned | Expiration date: June 22, 2017 | |||||
SCORE 82 9 Bladensburg Road Ne Washington Dc This plan proposed minor streetscape improvements, including three (3) tree spaces for stormwater management and 6 sidewalk with landscaped areas. Please see attached plans for further details. This is a renewal to permit pa113547-r3 which expired 11 22 16. Date: May 24, 2017 Contractor: Bohler DcPermit type: Paving; curb & gutter | Permit status: Issued | Expiration date: June 30, 2017 | Permit id: Pa201359-R1 | |||||
SCORE 82 19 M Street Nw Washington Dc Maintain existing curb cut access from 19th street nw to parking facility serving the building located at 19 m street, nw. No repair or replacement will take place. Date: May 23, 2017 Contractor: Bohler DcClient: Rockrose Development Corp C O Fox Architects | Permit type: Paving; driveway(s) repair or replace | Permit status: Revise and resubmit | Expiration date: July 31, 2017 | Permit id: 0 | |||||
SCORE 82 1711 Florida Avenue Nw Washington Dc Proposed work as noted and per attached civil plans. Renewal to permit pa97502-r1 Date: April 11, 2017 Contractor: Bohler DcPermit type: Paving; curb & gutter | Permit status: Cancel/withdrawn | Expiration date: April 13, 2018 | Permit id: 0 | |||||
SCORE 82 Perry Street Ne And 14th Street Ne Washington Dc The scope of the project is to construct a 1" water service to an existing 8" water main located in perry st ne. The lateral will service the existing park on the northwest corner of the intersection of perry st ne and 14th st ne for seasonal recreational activities. Contractor will need to perform trench repair, repair existing sidewalk and curb gutter as necessary for the installation of the water line. Date: April 4, 2017 Contractor: Bohler DcClient: Franciscan Monestary | Permit type: Excavation; water lateral conn over 2" pipe (trench), excavation; water meter pit (to 2" pipe) | Permit status: Issued | Expiration date: June 22, 2017 | Permit id: Pa203428 | |||||
SCORE 82 Date: March 27, 2017 Contractor: Bohler DcPermit type: Landscaping; tree removal | Permit status: Issued | Expiration date: June 24, 2017 | Permit id: Pa186363-R1 | |||||
SCORE 82 Date: March 24, 2017 Contractor: Bohler DcPermit type: Excavation; clean out | Permit status: Permit expired | Expiration date: June 3, 2017 | Permit id: Pa202961 | |||||
SCORE 82 415 14th Street Se Washington Dc This is a renewal to expired permit pa186363 to remove an off-site red oak tree Date: March 21, 2017 Contractor: Bohler DcPermit type: Landscaping; tree removal | Permit status: Cancel/withdrawn | Expiration date: March 21, 2018 | Permit id: 0 | |||||
SCORE 82 201 Tingey Street Se Washington Dc The project includes a public park with landscaping and amenities, a perimeter roadway with lid tree pits and permeable pavement, alterations to a portion of new jersey avenue se, construction of wider sidewalk with lid tree pits and permeable pavement along tingey street se, a pedestrian cobble mews lined by lid tree pits on 2nd street se, and a pedestrian cobble mews with associated landscaping on water street se. Date: March 21, 2017 Contractor: Bohler DcPermit type: Paving; ada curb ramp, paving; curb & gutter | Permit status: Assigned | Expiration date: May 2, 2018 | Permit id: 0 | |||||
SCORE 82 301 N Street Ne Washington Dc This is for the construction of a mixed-use building with underground parking and site amenities Date: April 14, 2017 Contractor: Bohler DcPermit type: Paving; ada curb ramp, paving; alley | Permit status: Assigned | Expiration date: May 1, 2018 | Permit id: 0 | |||||
SCORE 82 Date: March 8, 2017 Contractor: Bohler DcClient: Johnson Development | Permit type: Paving; curb & gutter | Permit status: Resubmitted | Expiration date: April 19, 2018 | Permit id: 0 | |||||
SCORE 82 9 Bladensburg Road Ne Washington Dc This plan proposed minor streetscape improvements, including three (3) tree spaces for stormwater management and 6 sidewalk with landscaped areas. Please see attached plans for further details. This is a renewal to permit pa113547-r3 which expired 11 22 16. Date: February 23, 2017 Contractor: Bohler DcPermit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: May 23, 2017 | Permit id: Pa201359 | |||||
SCORE 82 19 M Street Nw Washington Dc New curb cut to replace existing curb cut access from 19th street nw to parking facility serving the building located at 19 m street, nw. Date: May 23, 2017 Contractor: Bohler DcClient: Rockrose Development Corp C O Fox Architects | Permit type: Paving; driveway(s) new- commercial | Permit status: Assigned | Expiration date: July 31, 2017 | Permit id: 0 | |||||
SCORE 82 Contractor: Bohler DcPermit type: Landscaping; tree removal | Permit status: Approved (pending payment | Expiration date: December 21, 2017 | Permit id: 0 |