SCORE 64 222 Massachusetts Avenue Nw Washington Dc Soe for the north block, west and north sides of the capitol crossing project along 3rd st nw to g st nw and along mass ave nw from 3rd st to the mass ave bridge over i-395 Date: July 21, 2017 Contractor: Balfour Beatty Dc Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: November 18, 2017 | Permit id: Pa219486 | |||||
SCORE 64 222 Massachusetts Avenue Nw Washington Dc A 3" diameter tree was omitted from the capitol crossing tree mitigation plan. The existing tree is currently located within a portion of sidewalk that is to be permanently removed. This tree must be removed as well. 7 28 17 - this tree will be removed with a lane closure as allowed by the approved tcp for permit 10395976, mot-004. Date: July 27, 2017 Contractor: Balfour Beatty Dc Permit type: Landscaping; tree removal | Permit status: Permit expired | Expiration date: August 26, 2017 | Permit id: Pa219710 | |||||
SCORE 64 Date: July 21, 2017 Contractor: Balfour Beatty Dc Permit status: 9 | Expiration date: November 18, 2017 | Permit id: Pa219486 | |||||
SCORE 64 Date: July 28, 2017 Contractor: Balfour Beatty Dc Permit status: 8 | Expiration date: August 26, 2017 | Permit id: Pa219710 |