SCORE

BALFOUR BEATTY CONSTRUCTION DC

ABOUT BALFOUR BEATTY CONSTRUCTION DC

Balfour Beatty Construction Dc specializes in:

Balfour Beatty Construction Dc offers services:

Based on the information received from , associated with Balfour Beatty Construction Dc over the past .

If you are considering hiring Balfour Beatty Construction Dc for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Balfour Beatty Construction Dc has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Capitol crossing support of excavation at 2nd st nw from e street to mass ave nw. Includes soldier beams, lagging, tiebacks, and associated excavation.
Date:  September 30, 2014

Client: Lds Cph Llc | Permit type: Excavation; sheeting
2014/09/30089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Installation of bridge caisson in i-395
Date:  October 28, 2014

Client: Lds Cph Llc | Permit type: Excavation; caisson | Permit id: Pa102103
2014/10/28089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Enabling package in i-395 for capitol crossing project. Work includes demolition of median barriers and shoulder barriers, removal of highway streetlight poles, installation of temporary trench drains, and demolition of pavement in the shoulder.
Date:  October 24, 2014

Permit type: Paving; roadway | Permit status: Permit expired | Expiration date: February 19, 2016 | Permit id: Pa101902
2014/10/24089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Demolition work north air rights tunnelon walls,tunnel lights, protective dust barriers
Date:  September 18, 2015

Permit type: Mega projects; capitol crossing/i 395 tunnel | Permit status: Cancel/withdrawn | Expiration date: September 16, 2016
2015/09/18089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Small temporary support of excavation notch is public space to allow access to installing mass ave bridge caissons previous permitted in the north block, of capitol crossing
Date:  September 30, 2015

Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: August 31, 2016 | Permit id: Pa116911
2015/09/30089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Sheeting & shoring design for the support of excavation to construct the mass ave i-395 highway entrance portal to the highway
Date:  November 2, 2015

Permit type: Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing/i 395 tunnel | Permit status: Issued | Expiration date: November 7, 2016 | Permit id: Pa118552
2015/11/02089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Capitol crossing support of excavation at 2nd st nw from e street to mass ave nw. Includes soldier beams, lagging, tiebacks, and associated excavation.
Date:  February 16, 2016

Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: February 18, 2017 | Permit id: Pa100807-R1
2016/02/16089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Soe for the north block, west & north sides of the capitol crossing project along 3rd s nw to g st & along mass ave from 3rd st nw to the mass ave bridge over i-395
Date:  May 3, 2016

Permit type: Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing/i 395 tunnel | Permit status: Issued | Expiration date: November 27, 2016 | Permit id: Pa137191
2016/05/03089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Sheeting & shoring design for the support of excavation to construct the mass ave i-395 highway entrance portal to the highway
Date:  October 13, 2016

Permit type: Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing/i 395 tunnel | Permit status: Issued | Expiration date: October 31, 2017 | Permit id: Pa118552-R1
2016/10/13089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Sheeting & shoring line along the property line in public space, east side of 3rd st nw from f st, south to 501 3rd st nw
Date:  May 5, 2017

Permit type: Excavation; sheeting & shoring (for buildings) | Permit status: Assigned | Expiration date: May 31, 2018 | Permit id: 0
2017/05/05089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Approval of capitol crossings streetscape plans to include special paving (including shared street flush cub at g st nw), tree boxes and new trees, plantings and planter boxes, fixtures (arbor, seating, trash cans) and bike racks.
Date:  February 16, 2017

Permit type: Paving; sidewalk | Permit status: Assigned | Expiration date: April 26, 2018 | Permit id: 0
2017/02/16089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
This package entails part of the foundation work for the capitol crossing project; specifically, the construction of 118 platform/deck caissons/drilled piles and slurry wall. The design and construction of these caissons is being permitted through dcra; this application is being submitted for ipma and toa approval for installation of the caissons in public space, not the design. We are attaching the notarized dcra structural certification form, and the plans should be approved without a structural check, as provided in section 106. 1. 4. 1 of the dc construction codes supplement of 2008, as requested.
Date:  October 24, 2014

Permit type: Excavation; caisson foundation (capitol crossing only) | Permit status: Permit expired | Expiration date: June 5, 2016 | Permit id: Pa101909
2014/10/24089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Construction of two highway entrance/exit portals, a tunnel, two bridges reconnecting f & g streets nw and a platform over i-395
Date:  September 18, 2015

Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Permit expired | Expiration date: September 29, 2016 | Permit id: Pa116283
2015/09/18089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Construction of two highway entrance/exit portals, a tunnel, two bridges reconnecting f & g streets nw and a platform over i-395
Date:  September 1, 2016

Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Permit expired | Expiration date: September 29, 2017 | Permit id: Pa116283-R1
2016/09/01089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Approval of capitol crossings street scape plans to include special paving (including shared street flush curb at g st nw), tree boxes and new trees, plantings and planter boxes, fixtures (arbor, seating, trash cans) and bike racks.
Date:  February 16, 2017

Permit type: Paving; sidewalk | Permit status: Resubmitted | Expiration date: April 26, 2018 | Permit id: 0
2017/02/16089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Construction of two highway entrance exit portals, a tunnel, two bridges reconnecting f & g streets nw and a platform over i-395
Date:  September 5, 2017

Permit type: Mega projects; capitol crossing/i 395 tunnel, excavation; sheeting & shoring (for buildings) | Permit status: Issued | Expiration date: September 29, 2018 | Permit id: Pa116283-R2
2017/09/05089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Excavation; sheeting & shoring (for buildings)
Date:  February 12, 2016

Permit status: 8 | Expiration date: February 19, 2016 | Permit id: Pa100807
2016/02/12089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Excavation; sheeting & shoring (for buildings)

Permit status: 12 | Expiration date: May 31, 2018 | Permit id: 0
089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Paving; sidewalk(s), fixture; bench(es), fixture; bike rack(s), fixture; planter box on sidewalk (exception), fixture; street fixture or furniture (exception), fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; tree planting

Permit status: 12 | Expiration date: April 26, 2018 | Permit id: 0
089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing i 395 tunnel
Date:  May 23, 2016

Permit status: 8 | Expiration date: November 27, 2016 | Permit id: Pa137191
2016/05/23089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Mega projects; capitol crossing i 395 tunnel, excavation; sheeting & shoring (for buildings)
Date:  October 15, 2015

Permit status: 8 | Expiration date: August 31, 2016 | Permit id: Pa116911
2015/10/15089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Mega projects; capitol crossing i 395 tunnel, excavation; sheeting & shoring (for buildings)
Date:  April 26, 2016

Permit status: 8 | Expiration date: September 29, 2016 | Permit id: Pa116283
2016/04/26089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Mega projects; capitol crossing i 395 tunnel

Permit status: 3 | Expiration date: September 16, 2016 | Permit id: 0
089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Excavation; caisson foundation (capitol crossing only)
Date:  June 8, 2015

Permit status: 8 | Expiration date: June 5, 2016 | Permit id: Pa101909
2015/06/08089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Paving; roadway(s), excavation; boring test pit (each addl), excavation; boring test pit (single), excavation; storm service lateral abandonment, over head work; pole removal (each addl), over head work; pole removal (single or first one), over head work; streetlight temporary removal
Date:  March 10, 2015

Permit status: 8 | Expiration date: February 19, 2016 | Permit id: Pa101902
2015/03/10089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Excavation; sheeting & shoring (for buildings), mega projects; capitol crossing i 395 tunnel
Date:  November 5, 2015

Permit status: 8 | Expiration date: November 7, 2016 | Permit id: Pa118552
2015/11/05089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Mega projects; capitol crossing i 395 tunnel

Permit status: 3 | Expiration date: September 16, 2016 | Permit id: 0
089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Paving; sidewalk(s), fixture; bench(es), fixture; bike rack(s), fixture; planter box on sidewalk (exception), fixture; street fixture or furniture (exception), fixture; trash receptacle(s) (exception), landscaping; new tree space(s), landscaping; tree planting, mega projects; capitol crossing i 395 tunnel

Permit status: 11 | Expiration date: April 26, 2018 | Permit id: 0
089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Excavation; sheeting & shoring (for buildings)
Date:  July 20, 2017

Permit status: 9 | Expiration date: July 20, 2018 | Permit id: Pa204969
2017/07/20089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
SCORE
89
222 Massachusetts Avenue Nw Washington Dc
Mega projects; capitol crossing i 395 tunnel, excavation; sheeting & shoring (for buildings)
Date:  September 12, 2017

Permit status: 9 | Expiration date: September 29, 2018 | Permit id: Pa116283-R2
2017/09/12089222 Massachusetts Avenue Nw Washington DcBalfour Beatty Construction Dc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.