QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 56 13 S 3 E, Salt Lake City, Ut, 841151502 An es report is required for tpo membrane. Emailed 9-16-16 roof: 1. Remove the loose gravel from the roof and job site. 2. Eliminate the 2 abandoned curbs on the roof. The wood decking will be patch with plywood and infilled with insulation to match the existing roof height. 3. Mechanically fasten 3 inch iso insulation over the existing roof. 4. Mechanically fasten a mil tpo roof membrane over the fan fold insulation. This membrane will be a white membrane. 5. Install new white tpo drip metal to the wood deck on the west side of the building. 6. Install tpo up the wall and terminate it under the concrete coping with term bar. 7. Install all new flashings. This will include flashings along any vertical walls and all pipes. 8. Remove all associated roof debris and leave the job site neat and clean. Date: September 16, 2016 Contractor: Amco American Roofing Cokathy ThorpePermit type: Roofing | Permit status: In for review | Completion date: September 20, 2016 | Current use: Residential | Permit id: Bld2016-08709 |