QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 59 4 E Street Ne Washington Dc The proposed work includes replacing the existing small "astro turf" play field and paved parking area, at the north end of the stuart hobson middle school site, and correcting site drainage onto f street. Parking has been relocated to 4th, 5th, and e streets. The field will be expanded and replaced with "sports turf." permanent seating for students and ada access to the field will be included. Also, the field elevation will be adjusted to solve existing drainage issues. Taller safety fencing will be installed around the perimeter of the play field., a permanent dumpster enclosure will also be located on the site.. Client: Dc Public Schools Co Sarah Hasselmann | Permit type: Paving; curb & gutte | Permit id: Pa106296 | |||||
SCORE 59 4 E Street Ne Washington Dc The proposed work includes replacing the existing small "astro turf" play field and paved parking area, at the north end of the stuart hobson middle school site, and correcting site drainage onto f street. Parking has been relocated to 4th, 5th, and e streets. The field will be expanded and replaced with "sports turf." permanent seating for students and ada access to the field will be included. Also, the field elevation will be adjusted to solve existing drainage issues. Taller safety fencing will be installed around the perimeter of the play field., a permanent dumpster enclosure will also be located on the site.. Date: February 19, 2015 Contractor: Amado FernandezClient: Dc Public Schools C O Sarah Hasselmann | Permit type: Paving; curb & gutter | Permit status: Permit expired | Expiration date: March 6, 2016 | Permit id: Pa106296 |