QUALITY
ACTIVITY
AVERAGE PROJECT COST
PERMITS VALUATION
PROJECTS PER TOWN:
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 62 2211 6th St Boulder Co Interior remodel of 932 square feet of existing 3 story sfd. Remodel to include new kitchen and den on main level; new laundry and bath on second level; and new bath rough in on third level. Includes new forced air furnace and ducting, new electrical, and minor exterior changes as noted on the lac - his2013-00268. Owner contractor. Change in scope - 4 9 14 - electric in-floor heat removed from scope. Hydronic tubing to be added in-floor in second floor baths. Boiler to be under separate future permit. Client: Alexander Mason | Applicant: Alexander Mason | Permit type: Building, electrical | Permit status: Cmp | Completion date: October 30, 2014 | Current use: Single family d | |||||
SCORE 62 2211 6th St Boulder Co Flood recovery owner contractor-replacement of flood damaged drywall, plaster, and wall board. Replacing existing furring with new 2x4 furring. Creating new wine cellar and defining a new storage area. Replace shower enclosure in existing bathroom. Client: Alexander Mason,Kerri Mason | Applicant: Alexander Mason | Permit type: Building, electrical | Permit status: Iss | Current use: Single family d |