SCORE 59 Interior retail build-out within an existing open air mall Date: May 27, 2015Permit type: Permit | Permit status: Pass | Completion date: July 23, 2015 | Current use: Commercial | Permit id: Bld2015-03683 | |||||
SCORE 69 Fire sprinkler system Date: July 8, 2015Permit type: Fire | Permit status: In progress | Completion date: July 8, 2015 | Current use: Commercial | Permit id: Bld2015-05095 | |||||
SCORE 71 Please arrange payment on the balance due. Non structural interior demo of space 209 the main permit is logged as bld2015-03683 Date: July 17, 2015 Contractor: Madewell At City Center CenterPermit type: Permit | Permit status: Pass | Completion date: July 17, 2015 | Current use: Commercial | Permit id: Bld2015-05489 | |||||
Interior retail build-out within and existing open air mall Date: July 27, 2015Permit type: Low voltage | Permit status: Accepted - login review | Completion date: July 27, 2015 | Current use: Commercial | Permit id: Bld2015-05772 | |||||
SCORE 59 Low voltage Date: February 14, 2012 Contractor: Bcbg @ City Creek Center 209Permit type: Low voltage | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2012-01240 | |||||
SCORE 66 4 signs - (1) 9. 96 sq ft flat sign, (1) 4. 5 sq ft blade sign, (2) . 94 sq ft (ea) applied graphics signs Date: January 27, 2012 Contractor: Impact Signs Incbcbg Maxazria @ City Creek SignsPermit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-00747 | |||||
SCORE 59 Fire sprinkler Date: January 26, 2012 Contractor: First Fire Protection Incbcbg Maxazria 209Permit type: Fire | Permit status: Completed | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-00700 | |||||
SCORE 66 Install 4 plumbing fixtures, floor drain, water heater, and condenser lines. Date: January 11, 2012 Contractor: Sharp Water Solutionsbcbg Maxazria @ City CreekPermit type: Plumbing | Permit status: Completed | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-00251 | |||||
SCORE 82 Int racking, the special inspection form must be completed (with insp agency, insp name, etc) prior to start of work-for the slc inspector to review on his first visit t. B. K. B. D. W. Date: January 9, 2012Permit type: Permit | Permit status: Pass | Completion date: March 18, 2012 | Current use: Commercial | Permit id: Bld2012-00165 | |||||
SCORE 82 Tenant finsih Date: October 21, 2011Permit type: Permit | Permit status: Pass | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2011-06840 | |||||
New demising wall and soffit to create tenant space in 156 Date: July 9, 2015Permit type: Permit | Permit status: Accepted - standard | Completion date: July 9, 2015 | Current use: Commercial | Permit id: Bld2015-05137 | |||||
Interior improvements. Install cabinetry. Separate electrical permit required to be obtained by licensed contractor. Bl, hg Date: July 28, 2015Permit type: Permit | Permit status: Pass | Completion date: July 28, 2015 | Current use: Commercial | Permit id: Bld2015-05835 | |||||
SCORE 66 (1) flat wall sign a. M. Date: October 31, 2013Permit type: Sign | Permit status: Pass | Completion date: November 25, 2013 | Permit id: Bld2013-08070 | |||||
SCORE 80 1 - primary - painted - 25 sq ft Date: October 3, 2013 Contractor: Bogart Construction Incfree PeoplePermit type: Sign | Permit status: No certificate req | Completion date: October 24, 2013 | Permit id: Bld2013-07264 | |||||
Fire alarm Date: October 2, 2013Permit type: Low voltage | Permit status: Completed | Completion date: October 24, 2013 | Current use: Commercial | Permit id: Bld2013-07221 | |||||
SCORE 79 Power to panel. Rmp work order #5816367. Date: September 25, 2013Permit type: Electrical | Permit status: No certificate req | Completion date: October 24, 2013 | Current use: Commercial | Permit id: Bld2013-07017 | |||||
Fire sprinklers behind shop spaces 271,272 & 273 Date: September 11, 2013Permit type: Fire | Permit status: Completed | Completion date: October 22, 2013 | Current use: Commercial | Permit id: Bld2013-06613 | |||||
SCORE 66 Sink, toilet and mop sink csat iron and copper work Date: September 9, 2013 Contractor: Ikes Plumbing Inc.Free PeoplePermit type: Plumbing | Permit status: No certificate req | Completion date: October 24, 2013 | Current use: Commercial | Permit id: Bld2013-06528 | |||||
SCORE 79 Electrical permit. Job bid 55,000. Date: September 3, 2013Permit type: Electrical | Permit status: Completed | Completion date: October 24, 2013 | Current use: Commercial | Permit id: Bld2013-06329 | |||||
SCORE 70 Furnish & install heat pump and ducting Date: August 27, 2013 Contractor: Atlas Sheet Metal Inc.Free PeoplePermit type: Mechanical | Permit status: No certificate req | Completion date: October 24, 2013 | Current use: Commercial | Permit id: Bld2013-06131 | |||||
SCORE 66 Fire sprinklers Date: August 22, 2013 Contractor: Alta Fire Protection Companyfree PeoplePermit type: Fire | Permit status: No certificate req | Completion date: October 22, 2013 | Current use: Commercial | Permit id: Bld2013-06004 | |||||
SCORE 66 Install 92 of stud wall, no elec/mech/plmbg permits r. M. Int remodel a. H. D. W. Date: August 2, 2013 Contractor: Intercorp Construction Incspace 272 @ City CreekPermit type: Permit | Permit status: Pass | Completion date: October 11, 2013 | Current use: Commercial | Permit id: Bld2013-05418 | |||||
SCORE 80 Tenant build-out of space #272 at city creek center, block 76 Date: June 3, 2013 Contractor: Bogart Construction Incfree PeoplePermit type: Permit | Permit status: Cert occ no warranty | Completion date: October 24, 2013 | Current use: Commercial | Permit id: Bld2013-03626 | |||||
SCORE 69 Suite 272 is unleased at this time so we have been contracted to put a light hazard system in place for the time before it get leased out. Date: February 13, 2012 Contractor: Suite 272 City Creek CenterPermit type: Fire | Permit status: Completed | Completion date: February 27, 2012 | Current use: Commercial | Permit id: Bld2012-01182 | |||||
SCORE 64 Install electrical for storage unit. Date: September 27, 2013 Contractor: Hunt Electriccity Creek StoragePermit type: Electrical | Permit status: Reviews not require | Completion date: September 27, 2013 | Current use: Commercial | Permit id: Bld2013-07076 | |||||
Remove store front glazing, install double doors approx 6 back, construct wall to separate space, elec permit reqd r. M. A. M. T. I. Date: September 23, 2013Permit type: Permit | Permit status: Pass | Completion date: May 27, 2015 | Current use: Commercial | Permit id: Bld2013-06906 | |||||
Replacement of fluid cooling coil of existing cooling tower. Date: February 26, 2013Permit type: Mechanical | Permit status: Pass | Completion date: June 11, 2013 | Current use: Commercial | Permit id: Bld2013-01089 | |||||
SCORE 74 1- sink, 1 - kitchen sink, 1- urinal, 2 - lavs, 3 - water closets, 1 - water heater, 2 floor drains, Date: August 7, 2012Permit type: Plumbing | Permit status: Completed | Completion date: November 19, 2012 | Current use: Commercial | Permit id: Bld2012-05801 | |||||
SCORE 74 Providing equipment, material and labor for the heating, venitlation, a/c and plumbing. Date: August 7, 2012Permit type: Mechanical | Permit status: Completed | Completion date: November 19, 2012 | Current use: Commercial | Permit id: Bld2012-05800 | |||||
Elec work for new elec room for support of wireless cellular Date: June 27, 2012Permit type: Electrical | Permit status: Pass | Completion date: August 2, 2012 | Current use: Commercial | Permit id: Bld2012-04664 | |||||
New elec room for support of wireless cellular k. A. A. H. Date: June 27, 2012Permit type: Permit | Permit status: Pass | Completion date: August 2, 2012 | Current use: Commercial | Permit id: Bld2012-04663 | |||||
SCORE 64 Elec work throughout building. Date: December 27, 2011 Contractor: Hunt ElectrictaubmanPermit type: Electrical | Permit status: Pass | Completion date: November 6, 2013 | Current use: Commercial | Permit id: Bld2011-08500 | |||||
Temp power for consruction in spaces 112b, 268 Date: November 14, 2011Permit type: Electrical | Permit status: Pass | Completion date: March 19, 2012 | Current use: Commercial | Permit id: Bld2011-07448 | |||||
Power to panel permit for 66 meters, 1 for residential units meter (rmp w/o #5493718), residential house meter (rmp w/o #5493723), & 64 apt meters Date: January 18, 2011Permit type: Electrical | Permit status: Pass | Completion date: March 7, 2012 | Current use: Residential | Permit id: Bld2011-00352 | |||||
Residential buildout for apartments Date: March 25, 2009Permit type: Permit | Permit status: Pass | Completion date: March 8, 2012 | Current use: Residential | Permit id: Bld2009-01812 | |||||
Wp-4a augercast piles only. See attached letter dated11/20/2007. Reviewer: c. Kimball. 12/7/07:per letterdated 12/7/2007, authorization to proceed with pile capsalong grid lines r-n, and 1-6. Reviewed & approved by chriskimball. 12/21/07- Date: November 21, 2007Permit type: Permit | Permit status: Completed | Completion date: August 29, 2013 | Current use: Commercial | Permit id: Bld2007-7112100 | |||||
SCORE 59 1-ductwork 8-a/c Date: March 18, 2016Permit type: Mechanical | Permit status: Closed | Completion date: May 16, 2016 | Current use: Commercial | Permit id: Bld2016-02518 | |||||
SCORE 59 11 fixures Date: March 16, 2016Permit type: Plumbing | Permit status: Closed | Completion date: May 11, 2016 | Current use: Commercial | Permit id: Bld2016-02429 | |||||
SCORE 64 Electrical Date: March 3, 2016Permit type: Electrical | Permit status: Closed | Completion date: May 11, 2016 | Current use: Commercial | Permit id: Bld2016-01925 | |||||
SCORE 59 T. I for credit union Date: January 13, 2016 Contractor: Okland Construction Coamerica First Credit UnionPermit status: Closed | Completion date: May 16, 2016 | Current use: Commercial | Permit id: Bld2016-00271 | |||||
SCORE 59 Interior retail build-out within and existing open air mall Date: July 27, 2015 Contractor: Siemens Industry Inc.Madewell At City CreekPermit type: Low voltage | Permit status: Closed | Completion date: October 6, 2015 | Current use: Commercial | Permit id: Bld2015-05772 | |||||
Interior improvements. Install cabinetry. Separate electrical permit required to be obtained by licensed contractor. Bl, hg Date: July 28, 2015Permit status: Inspections | Completion date: July 28, 2015 | Current use: Commercial | Permit id: Bld2015-05835 | |||||
SCORE 64 Marquee sign Date: September 22, 2015 Contractor: Yesco Llccity Creek ReservePermit type: Sign | Permit status: Closed | Completion date: December 30, 2015 | Permit id: Bld2015-07719 | |||||
SCORE 64 Install car charging station in existing east city creek parking structure. Date: September 4, 2015 Contractor: City Creek Evgo Freedom StationPermit type: Electrical | Permit status: Closed | Completion date: October 12, 2015 | Current use: Commercial | Permit id: Bld2015-07170 | |||||
SCORE 71 Racks for madewell Date: August 28, 2015Permit status: Closed | Completion date: October 1, 2015 | Current use: Commercial | Permit id: Bld2015-06959 | |||||
SCORE 100 Sign Date: August 28, 2015 Contractor: Gillies Sign And Design IncPermit status: Closed | Completion date: October 9, 2015 | Permit id: Bld2015-06938 | |||||
SCORE 95 -wall sign -blade sign Date: July 21, 2016 Contractor: Impact SignsPermit type: Sign | Permit status: Inspections | Completion date: July 27, 2016 | Permit id: Bld2016-06824 | |||||
SCORE 68 Electrical for tenant improvement Date: August 6, 2015 Contractor: MadewellPermit type: Electrical | Permit status: Closed | Completion date: October 6, 2015 | Current use: Commercial | Permit id: Bld2015-06221 | |||||
SCORE 64 Flat sign Date: July 30, 2015 Contractor: Ig Group Llcpopn SweetsPermit type: Sign | Permit status: Closed | Completion date: September 2, 2015 | Permit id: Bld2015-05931 | |||||
SCORE 71 Non structural interior demo of space 209 the main permit is logged as bld2015-03683 Date: July 17, 2015 Contractor: Madewell At City Center CenterPermit status: Closed | Completion date: October 1, 2015 | Current use: Commercial | Permit id: Bld2015-05489 | |||||
SCORE 69 Fire sprinkler system Date: July 8, 2015Permit type: Fire | Permit status: Closed | Completion date: October 6, 2015 | Current use: Commercial | Permit id: Bld2015-05095 | |||||
SCORE 64 This ti is in unit #209; it is basically a plumbing remodel for our portion of the work Date: August 19, 2015 Contractor: Chaparral Plumbing Incmadewell Tenant ImpPermit type: Plumbing | Permit status: Closed | Completion date: October 6, 2015 | Current use: Commercial | Permit id: Bld2015-06629 | |||||
SCORE 71 Interior retail build-out within an existing open air mall Date: May 27, 2015Permit status: Closed | Completion date: November 20, 2015 | Current use: Commercial | Permit id: Bld2015-03683 | |||||
SCORE 64 Power to panel Date: April 21, 2016Permit type: Electrical | Permit status: Closed | Completion date: May 6, 2016 | Current use: Commercial | Permit id: Bld2016-03762 | |||||
SCORE 59 Interior non-structural demo only. No other work. Date: May 31, 2016 Contractor: Grove Construction Management Llcoil LifePermit status: Inspections | Completion date: May 31, 2016 | Current use: Commercial | Permit id: Bld2016-05153 | |||||
SCORE 59 Fire sprinkler system remodel at block 76 - space 176a - Date: February 4, 2016Permit type: Fire | Permit status: Closed | Completion date: May 9, 2016 | Current use: Commercial | Permit id: Bld2016-00906 | |||||
SCORE 66 Install fire doors in existing grease duct Date: February 12, 2013Permit type: Mechanical | Permit status: Pass | Completion date: March 5, 2013 | Current use: Commercial | Permit id: Bld2013-00756 | |||||
SCORE 66 Adding 2 outlets in a shaft Date: November 14, 2012 Contractor: Jp Electricaltexas De BrazilPermit type: Electrical | Permit status: Pass | Completion date: October 24, 2013 | Current use: Commercial | Permit id: Bld2012-08456 | |||||
SCORE 79 1 flat storefront sign a. H. Date: September 11, 2012Permit type: Sign | Permit status: Accepted - standard | Completion date: September 11, 2012 | Permit id: Bld2012-06716 | |||||
SCORE 79 1 projecting storefront sign a. H. Date: August 14, 2012Permit type: Sign | Permit status: Pass | Completion date: August 14, 2012 | Permit id: Bld2012-06015 | |||||
SCORE 66 2 wall signs a. M. Date: March 6, 2012Permit type: Sign | Permit status: Accepted - standard | Completion date: March 6, 2012 | Permit id: Bld2012-01781 | |||||
SCORE 66 Power to panel Date: March 1, 2012Permit type: Electrical | Permit status: Completed | Completion date: July 3, 2012 | Current use: Commercial | Permit id: Bld2012-01723 | |||||
Kitchen hood fire suppression system Date: February 9, 2012Permit type: Fire | Permit status: Completed | Completion date: July 3, 2012 | Current use: Commercial | Permit id: Bld2012-01093 | |||||
Kitchen hood fire suppression system Date: February 9, 2012Permit type: Fire | Permit status: Completed | Completion date: July 3, 2012 | Current use: Commercial | Permit id: Bld2012-01092 | |||||
Texas de brazil @ city creek low voltage Date: January 20, 2012Permit type: Low voltage | Permit status: Completed | Completion date: July 3, 2012 | Current use: Commercial | Permit id: Bld2012-00544 | |||||
SCORE 66 Hvac, resturant, hoods, vav boxes, duct Date: December 28, 2011 Contractor: Trico Sheet Metaltexas De BrazilPermit type: Mechanical | Permit status: No certificate req | Completion date: July 3, 2012 | Current use: Commercial | Permit id: Bld2011-08513 | |||||
Tenant finish. Install 2 boilers, 1 gaslines, 7 exhaust fans, 3 hoods, 7 appliances, 12 ac units. Date: December 21, 2011Permit type: Mechanical | Permit status: No certificate req | Completion date: July 3, 2012 | Current use: Commercial | Permit id: Bld2011-08408 | |||||
Tenant finish. Install 27 plumbing fixtures, 1 water softener, 14 draoms. 1 backflow preventor, 2 interceptors, 1 soda caronator. Date: December 21, 2011Permit type: Plumbing | Permit status: Completed | Completion date: July 3, 2012 | Current use: Commercial | Permit id: Bld2011-08407 | |||||
SCORE 66 Tenant finish. Elec, plmb, mech, fire alarm, and sprinkler are authorized by seperate permits. Date: October 14, 2011Permit type: Permit | Permit status: Completed | Completion date: July 3, 2012 | Current use: Commercial | Permit id: Bld2011-06657 | |||||
Kitchen exhaust d. D. A. M. T. I. Date: August 11, 2011Permit type: Permit | Permit status: Pass | Completion date: March 15, 2013 | Current use: Commercial | Permit id: Bld2011-05012 | |||||
SCORE 66 1 flat sign, 1 blade sign a. M. Date: January 22, 2013 Contractor: Allied Awning And Rental Incruum @ City CreekPermit type: Sign | Permit status: Completed | Completion date: January 22, 2013 | Permit id: Bld2013-00401 | |||||
SCORE 66 Install 2 flat signs Date: December 11, 2012 Contractor: Impact Signs IncmicrosoftPermit type: Sign | Permit status: Pass | Completion date: December 11, 2012 | Permit id: Bld2012-09067 | |||||
Power to panel agreement on file Date: October 29, 2012Permit type: Electrical | Permit status: No certificate req | Completion date: January 3, 2013 | Current use: Commercial | Permit id: Bld2012-08032 | |||||
Install two heat pumps and ductwork for heat pumps. Reference plans for permit # bld2012-04882. Date: October 15, 2012Permit type: Mechanical | Permit status: Completed | Completion date: January 3, 2013 | Current use: Commercial | Permit id: Bld2012-07613 | |||||
Fire alarm Date: October 3, 2012Permit type: Low voltage | Permit status: Completed | Completion date: January 3, 2013 | Current use: Commercial | Permit id: Bld2012-07340 | |||||
Electrical work, job bid: 40,000. Date: September 28, 2012Permit type: Electrical | Permit status: No certificate req | Completion date: January 3, 2013 | Current use: Commercial | Permit id: Bld2012-07194 | |||||
2 - lavs, 1 - mop sink, 1 breakroom sink and 1 - d/f, 2 water closets, 1 water heater, 1 water line, 2 floor drains. Date: September 26, 2012Permit type: Plumbing | Permit status: Completed | Completion date: January 3, 2013 | Current use: Commercial | Permit id: Bld2012-07126 | |||||
SCORE 66 58 fire sprinklers Date: September 17, 2012 Contractor: Alta Fire Protection Companyathleta @ City CreekPermit type: Fire | Permit status: No certificate req | Completion date: January 3, 2013 | Current use: Commercial | Permit id: Bld2012-06874 | |||||
SCORE 66 1 flat sign, 1 blade sign a. H. Date: September 11, 2012 Contractor: Allied Awning And Rental Incathleta @ City CreekPermit type: Sign | Permit status: Pass | Completion date: September 11, 2012 | Permit id: Bld2012-06714 | |||||
Tenant improvement in an existing shell space Date: July 9, 2012Permit type: Permit | Permit status: Completed | Completion date: January 3, 2013 | Current use: Commercial | Permit id: Bld2012-04882 | |||||
SCORE 69 Various unleased spaces that we have been contracted to provide a temporary light hazard system. Date: February 15, 2012 Contractor: City Creek Unleased SpacePermit type: Fire | Permit status: Completed | Completion date: February 23, 2012 | Current use: Commercial | Permit id: Bld2012-01310 | |||||
Power to panel agreement on file Date: October 12, 2012Permit type: Electrical | Permit status: No certificate req | Completion date: November 19, 2012 | Current use: Commercial | Permit id: Bld2012-07569 | |||||
Fire alarm Date: August 2, 2012Permit type: Low voltage | Permit status: Completed | Completion date: November 19, 2012 | Current use: Commercial | Permit id: Bld2012-05649 | |||||
Elec work for tenant improvement. Date: July 17, 2012Permit type: Electrical | Permit status: No certificate req | Completion date: November 19, 2012 | Current use: Commercial | Permit id: Bld2012-05195 | |||||
SCORE 66 Tenant improvement of existing space for a new retail store. Work includes non-structural partitions, ceilings, finishes, furniture, and related hvac, electrical and plumbing work. Date: May 8, 2012 Contractor: Dickinson CameronapplePermit type: Permit | Permit status: Completed | Completion date: November 19, 2012 | Current use: Commercial | Permit id: Bld2012-03303 | |||||
Tenant improvement for retail sales d. D. A. M. T. I. Date: October 5, 2011Permit type: Permit | Permit status: Pass | Completion date: November 9, 2012 | Current use: Commercial | Permit id: Bld2011-06395 | |||||
SCORE 66 12 - fire sprinklers, water based fire suppression t. I. 723 sf. City creek across from ste 121 Date: October 11, 2012Permit type: Fire | Permit status: Pass | Completion date: January 24, 2013 | Current use: Commercial | Permit id: Bld2012-07542 | |||||
SCORE 59 Power to panel Date: October 3, 2012 Contractor: Hedgehog Electricthe Art Of Shaving 116 BPermit type: Electrical | Permit status: No certificate req | Completion date: October 17, 2012 | Current use: Commercial | Permit id: Bld2012-07333 | |||||
SCORE 66 3 fixtures, 1 water heater, 2 drains for tenant build out Date: September 13, 2012Permit type: Plumbing | Permit status: Completed | Completion date: October 17, 2012 | Current use: Commercial | Permit id: Bld2012-06797 | |||||
SCORE 66 Fire sprinklers Date: September 7, 2012 Contractor: Alta Fire Protection Companythe Art Of ShavingPermit type: Fire | Permit status: No certificate req | Completion date: October 17, 2012 | Current use: Commercial | Permit id: Bld2012-06653 | |||||
Low voltage alarm Date: September 4, 2012Permit type: Low voltage | Permit status: Completed | Completion date: October 17, 2012 | Current use: Commercial | Permit id: Bld2012-06537 | |||||
SCORE 66 Tenant build out of existing retail space in city creek center Date: May 29, 2012Permit type: Permit | Permit status: Completed | Completion date: November 5, 2012 | Current use: Commercial | Permit id: Bld2012-03918 | |||||
SCORE 59 Power to panel Date: August 9, 2012Permit type: Electrical | Permit status: Pass | Completion date: August 28, 2012 | Current use: Commercial | Permit id: Bld2012-05882 | |||||
SCORE 66 1 wall sign, 1 window sign a. H. Date: August 9, 2012Permit type: Sign | Permit status: Pass | Completion date: August 9, 2012 | Permit id: Bld2012-05871 | |||||
SCORE 79 Storage racks d. D. D-1 zone, interior work to install racking a. S. T. I. Date: August 2, 2012Permit type: Permit | Permit status: Pass | Completion date: December 5, 2012 | Current use: Commercial | Permit id: Bld2012-05641 | |||||
SCORE 59 Electrical work for tenant space 214 installation of service conduit and feeder wires. Date: July 18, 2012 Contractor: Hunt Electricfruit Store Suite 117 @ City CreekPermit type: Electrical | Permit status: Pass | Completion date: August 23, 2012 | Current use: Commercial | Permit id: Bld2012-05205 | |||||
Fire alarm Date: June 13, 2012Permit type: Low voltage | Permit status: No certificate req | Completion date: September 5, 2012 | Current use: Commercial | Permit id: Bld2012-04353 | |||||
SCORE 66 11,901 sf tenant improvement - fire sprinkler system remodel Date: June 13, 2012 Contractor: Alta Fire Protection Co.Anthropologie T.IPermit type: Fire | Permit status: Completed | Completion date: September 5, 2012 | Current use: Commercial | Permit id: Bld2012-04350 | |||||
SCORE 66 Retail tenant fit out at city creek center, block 76, space 214 elect permits reqd. Date: June 8, 2012Permit type: Electrical | Permit status: No certificate req | Completion date: September 5, 2012 | Current use: Commercial | Permit id: Bld2012-04239 | |||||
SCORE 79 Expedited review retail tenant fit out at city creek center, block 76, space 214 mech, elect & plumbing permits reqd. Date: April 6, 2012Permit type: Permit | Permit status: Completed | Completion date: September 5, 2012 | Current use: Commercial | Permit id: Bld2012-02550 | |||||
SCORE 66 New fire sprinkler system at the apple store in the city creek mall Date: August 7, 2012 Contractor: Certified Fire ProtectionapplePermit type: Fire | Permit status: No certificate req | Completion date: November 19, 2012 | Current use: Commercial | Permit id: Bld2012-05785 | |||||
SCORE 79 1 blade sign a. H. Date: June 19, 2012Permit type: Sign | Permit status: Completed | Completion date: June 19, 2012 | Permit id: Bld2012-04478 | |||||
SCORE 79 Power to panel Date: May 23, 2012Permit type: Electrical | Permit status: No certificate req | Completion date: June 22, 2012 | Current use: Commercial | Permit id: Bld2012-03818 | |||||
Tenant finish , fire sprinklers Date: May 2, 2012Permit type: Fire | Permit status: Completed | Completion date: June 22, 2012 | Current use: Commercial | Permit id: Bld2012-03133 | |||||
Fire alarm Date: April 30, 2012Permit type: Low voltage | Permit status: Completed | Completion date: June 22, 2012 | Current use: Commercial | Permit id: Bld2012-03069 | |||||
SCORE 79 Tenant finish elec permit Date: April 25, 2012Permit type: Electrical | Permit status: Completed | Completion date: June 22, 2012 | Current use: Commercial | Permit id: Bld2012-02969 | |||||
SCORE 79 Flat sign, letter forms, window signage a. S. Date: April 16, 2012Permit type: Sign | Permit status: Accepted - standard | Completion date: April 16, 2012 | Permit id: Bld2012-02767 | |||||
SCORE 66 Tenant finish , mech, elec & plmbg permits reqd k. A. (for kimball eng) k. B. D. W. Date: December 27, 2011Permit type: Permit | Permit status: Cert occ no warranty | Completion date: June 22, 2012 | Current use: Commercial | Permit id: Bld2011-08494 | |||||
SCORE 66 1 projecting sign a. H. Date: May 29, 2012 Contractor: Yesco LlczaggPermit type: Sign | Permit status: Completed | Completion date: May 29, 2012 | Permit id: Bld2012-03947 | |||||
SCORE 66 Tying into existing 6" feed with mechanical tee. Date: February 6, 2012 Contractor: Certified Fire Protectionzagg @ Block 76Permit type: Fire | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2012-01006 | |||||
SCORE 66 Space # 1 e is a storage space that restoration hardware has leased from taubman for their inventory. Date: April 30, 2012Permit type: Permit | Permit status: Completed | Completion date: June 13, 2012 | Current use: Commercial | Permit id: Bld2012-03009 | |||||
Fire sprinkler system d. W. Date: March 19, 2012Permit type: Fire | Permit status: Completed | Completion date: June 13, 2012 | Current use: Commercial | Permit id: Bld2012-02062 | |||||
SCORE 72 1- storefront "c" 84. 66 sq ft this is an interior sign, comprised of 3/4" pin-mounted acrylic letters applied to 1/2" acrylic panels. The letters are small 10" and 8" high with 3. 75" gap. Date: March 15, 2012Permit type: Sign | Permit status: Completed | Completion date: January 9, 2015 | Permit id: Bld2012-01996 | |||||
SCORE 72 Storage shelving racks d. D. D-1 zone, interior work for shelving a. S. Date: February 29, 2012Permit type: Permit | Permit status: Pass | Completion date: March 12, 2012 | Current use: Commercial | Permit id: Bld2012-01691 | |||||
Low voltage Date: February 16, 2012Permit type: Fire | Permit status: Pass | Completion date: March 9, 2012 | Current use: Commercial | Permit id: Bld2012-01330 | |||||
SCORE 59 Power to panel Date: February 15, 2012Permit type: Electrical | Permit status: Pass | Completion date: February 29, 2012 | Current use: Commercial | Permit id: Bld2012-01276 | |||||
SCORE 66 Ductwork & 1 compressor Date: January 26, 2012Permit type: Mechanical | Permit status: Pass | Completion date: March 9, 2012 | Current use: Commercial | Permit id: Bld2012-00724 | |||||
SCORE 59 Electrical Date: January 13, 2012Permit type: Electrical | Permit status: Pass | Completion date: March 1, 2012 | Current use: Commercial | Permit id: Bld2012-00353 | |||||
SCORE 72 Tenant finish for retail sales d. D. A. M. T. I. Date: November 7, 2011Permit type: Permit | Permit status: Cert occ no warranty | Completion date: March 19, 2012 | Current use: Commercial | Permit id: Bld2011-07281 | |||||
Fire alarm Date: March 13, 2012Permit type: Low voltage | Permit status: Pass | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-01918 | |||||
1 flat sign, 1 awning sign a. H. Date: February 9, 2012Permit type: Sign | Permit status: Re-inspect | Completion date: March 19, 2012 | Permit id: Bld2012-01056 | |||||
Power to panel Date: February 3, 2012Permit type: Electrical | Permit status: Pass | Completion date: March 12, 2012 | Current use: Commercial | Permit id: Bld2012-00940 | |||||
Plumbing - 1 drinking fountain, 4 sinks, 1 water heater, 1 roof/floor drains Date: January 13, 2012Permit type: Plumbing | Permit status: Pass | Completion date: March 9, 2012 | Current use: Commercial | Permit id: Bld2012-00377 | |||||
Fire sprinkler system Date: January 12, 2012Permit type: Fire | Permit status: Pass | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00313 | |||||
SCORE 66 Install 1 heat pump, 2 vav boxes, and 1 exhaust fan Date: January 11, 2012Permit type: Mechanical | Permit status: Pass | Completion date: February 22, 2012 | Current use: Commercial | Permit id: Bld2012-00268 | |||||
SCORE 66 Tenant improvement. Mech, elect & plumb permits reqd. T. B. Zone: a. M. Date: September 16, 2011Permit type: Permit | Permit status: Completed | Completion date: April 19, 2012 | Current use: Commercial | Permit id: Bld2011-05935 | |||||
Interior racking in mecantile. T. B. Zone; no zoning issues. A. M. Fire; t. I. Date: March 12, 2012Permit type: Permit | Permit status: Pass | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-01912 | |||||
SCORE 59 1 flat sign, 1 blade sign. City creek approval reqd. A. M. Date: February 3, 2012 Contractor: Allied Awning And Rental Incj. Crew Space 210Permit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-00950 | |||||
Low voltage Date: January 17, 2012Permit type: Low voltage | Permit status: Completed | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-00406 | |||||
Power to panel permit Date: January 11, 2012Permit type: Electrical | Permit status: Completed | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-00300 | |||||
SCORE 66 Fire sprinkler system Date: January 4, 2012 Contractor: Quality Fire Protection Incj Crew @ City CreekPermit type: Fire | Permit status: No certificate req | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-00079 | |||||
Install 4 heat pumps and 7 vav boxes for tenant improvement Date: December 27, 2011Permit type: Mechanical | Permit status: No certificate req | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2011-08499 | |||||
Elect ti wiring Date: December 19, 2011Permit type: Electrical | Permit status: No certificate req | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2011-08296 | |||||
Plumbing work Date: December 16, 2011Permit type: Plumbing | Permit status: No certificate req | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2011-08256 | |||||
SCORE 66 Tenant improvement Date: September 15, 2011 Contractor: David A. Nice Builders Incj Crew @ City CreekPermit type: Permit | Permit status: Completed | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2011-05892 | |||||
Installation of rolling racks. Date: March 12, 2012Permit type: Permit | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2012-01896 | |||||
Low voltage Date: February 16, 2012Permit type: Low voltage | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2012-01329 | |||||
SCORE 66 Single bathroom and mop sink Date: December 22, 2011 Contractor: Ikes Plumbing Inc.Banana Republic @ City CreekPermit type: Plumbing | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2011-08446 | |||||
Install 3 vav boxes & 2 cooling towers up to tons Date: November 29, 2011Permit type: Mechanical | Permit status: Pass | Completion date: March 7, 2012 | Current use: Commercial | Permit id: Bld2011-07843 | |||||
Tenant improvement. Date: November 23, 2011Permit type: Fire | Permit status: Pass | Completion date: March 2, 2012 | Current use: Commercial | Permit id: Bld2011-07727 | |||||
SCORE 66 Install 3 signs Date: November 1, 2011 Contractor: Impact Signs Incbanana Republic @ City CreekPermit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2011-07125 | |||||
Mercantile t. I., mech, elec & plmbg permits reqd t. B. D-1 zone retail k. B. D. W. Date: August 10, 2011Permit type: Permit | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2011-04984 | |||||
Installation of rolling racks. Date: March 12, 2012Permit type: Permit | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2012-01895 | |||||
SCORE 66 1 wall sign, 1 name plate, 1 blade sign a. M. Date: February 23, 2012 Contractor: Impact Signs Incgap @ City CreekPermit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-01382 | |||||
Power to panel Date: January 31, 2012Permit type: Electrical | Permit status: Pass | Completion date: February 9, 2012 | Current use: Commercial | Permit id: Bld2012-00810 | |||||
Elecrical work Date: December 12, 2011Permit type: Electrical | Permit status: Pass | Completion date: March 8, 2012 | Current use: Commercial | Permit id: Bld2011-08099 | |||||
SCORE 66 Hvac ducting, grills, registers, heat pumps Date: December 9, 2011 Contractor: Atlas Sheet Metal Inc.Gap @ City CreekPermit type: Mechanical | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2011-08073 | |||||
Tenant improvement Date: November 23, 2011Permit type: Fire | Permit status: Pass | Completion date: March 2, 2012 | Current use: Commercial | Permit id: Bld2011-07728 | |||||
Tenant improvement for retail sales d. D. A. M. T. I. Date: September 23, 2011Permit type: Permit | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2011-06134 | |||||
1- flat 32 sq ft Date: March 7, 2012Permit type: Sign | Permit status: Pass | Completion date: March 15, 2012 | Permit id: Bld2012-01810 | |||||
1- flat 32 sq ft Date: March 7, 2012Permit type: Permit | Permit status: In progress | Completion date: March 7, 2012 | Current use: Commercial | Permit id: Bld2012-01809 | |||||
SCORE 59 Power to panel Date: February 21, 2012Permit type: Electrical | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2012-01458 | |||||
SCORE 66 Install 1 air handler and 1 exhaust fan Date: January 11, 2012 Contractor: Gunthers Comfort Airoc Tanner Rolex @ City CreekPermit type: Mechanical | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2012-00263 | |||||
Low voltage fire alarm t. I. Date: January 9, 2012Permit type: Low voltage | Permit status: Pass | Completion date: March 9, 2012 | Current use: Commercial | Permit id: Bld2012-00173 | |||||
SCORE 66 Elec work for tenant finish Date: December 21, 2011 Contractor: Hunt Electricoc Tanner Rolex @ City CreekPermit type: Electrical | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2011-08368 | |||||
Lease space #273 on level 2 at the city creek center block 76. Date: December 8, 2011Permit type: Fire | Permit status: Pass | Completion date: March 8, 2012 | Current use: Commercial | Permit id: Bld2011-08051 | |||||
Tenant finish Date: November 3, 2011Permit type: Permit | Permit status: Cert occ no warranty | Completion date: March 19, 2012 | Current use: Commercial | Permit id: Bld2011-07203 | |||||
SCORE 66 Fire sprinklers Date: March 7, 2012Permit type: Fire | Permit status: Completed | Completion date: March 21, 2012 | Current use: Commercial | Permit id: Bld2012-01798 | |||||
SCORE 66 Furnish & install racking in mercantile t. B. K. B. Date: February 29, 2012 Contractor: K N P Construction Incgymboree @ City CreekPermit type: Permit | Permit status: Pass | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-01695 | |||||
SCORE 59 Power to panel Date: February 22, 2012 Contractor: W B Electric Llcgymboree @ City Creek Space 103Permit type: Electrical | Permit status: Completed | Completion date: March 21, 2012 | Current use: Commercial | Permit id: Bld2012-01500 | |||||
Gymboree suite 103 fire alarm Date: February 15, 2012Permit type: Fire | Permit status: No certificate req | Completion date: March 21, 2012 | Current use: Commercial | Permit id: Bld2012-01271 | |||||
1- wall sign a 90, 1 - wall sign c 90, 1 - blade sign d 9, 1- blade sign e 9, 1- window graphic sign. Date: February 8, 2012Permit type: Sign | Permit status: Completed | Completion date: February 8, 2012 | Permit id: Bld2012-01080 | |||||
SCORE 66 6 awnings without any text or logos j. U. A. H. Date: February 1, 2012Permit type: Permit | Permit status: No certificate req | Completion date: June 9, 2015 | Current use: Commercial | Permit id: Bld2012-00868 | |||||
2 each water surce heat pumps fan coils (4 ton a/c), 3 each vav boxes, outside air, 2 each electric duct heaters, 2 each owner provided ceiling exhaust fans. Date: January 19, 2012Permit type: Mechanical | Permit status: Completed | Completion date: March 21, 2012 | Current use: Commercial | Permit id: Bld2012-00515 | |||||
Expedited tenant finish Date: December 9, 2011Permit type: Permit | Permit status: Completed | Completion date: March 21, 2012 | Current use: Commercial | Permit id: Bld2011-08061 | |||||
SCORE 66 1 marque, 1 wall sign a. M. Date: March 6, 2012Permit type: Sign | Permit status: Accepted - standard | Completion date: March 6, 2012 | Permit id: Bld2012-01783 | |||||
SCORE 82 Racking l. L. Zone; a. H. Fire; t. I. Date: March 5, 2012Permit type: Permit | Permit status: Pass | Completion date: March 20, 2012 | Current use: Commercial | Permit id: Bld2012-01768 | |||||
SCORE 82 Power to panel Date: January 9, 2012 Contractor: Jp Electricalrestoration Hardware @ City CreekPermit type: Electrical | Permit status: No certificate req | Completion date: April 3, 2012 | Current use: Commercial | Permit id: Bld2012-00162 | |||||
SCORE 66 Plumbing for 2 bathrooms, 1 water heater, 1 break room sink, 1 mop sink, 1 drinking fountain Date: January 5, 2012Permit type: Plumbing | Permit status: No certificate req | Completion date: April 3, 2012 | Current use: Commercial | Permit id: Bld2012-00122 | |||||
Fire sprinkler Date: December 27, 2011Permit type: Fire | Permit status: Completed | Completion date: April 3, 2012 | Current use: Commercial | Permit id: Bld2011-08503 | |||||
Fire alarm for tenant improvement Date: December 8, 2011Permit type: Low voltage | Permit status: Completed | Completion date: April 3, 2012 | Current use: Commercial | Permit id: Bld2011-08047 | |||||
SCORE 82 Electrical work for tenant improvement. Date: November 29, 2011 Contractor: Jp Electricalrestoration Hardware @ City CreekPermit type: Electrical | Permit status: Completed | Completion date: April 3, 2012 | Current use: Commercial | Permit id: Bld2011-07839 | |||||
SCORE 82 Tenant improvement Date: September 29, 2011Permit type: Permit | Permit status: Completed | Completion date: April 3, 2012 | Current use: Commercial | Permit id: Bld2011-06262 | |||||
SCORE 59 1- awning 31 sq ft 1- flat 62 sq ft Date: March 5, 2012 Contractor: Yesco Llclenscrafters @ City Creek Space 115Permit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-01760 | |||||
Power to panel Date: February 17, 2012Permit type: Electrical | Permit status: Pass | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-01405 | |||||
Low voltage Date: January 31, 2012Permit type: Low voltage | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2012-00835 | |||||
SCORE 66 Elec work for tenant finish Date: January 26, 2012 Contractor: Sierra Electric Lclenscrafters @ City CreekPermit type: Electrical | Permit status: Pass | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-00688 | |||||
SCORE 66 Install 2 exhaust fans and ductwork Date: January 25, 2012 Contractor: United Team Mechanicallenscrafters @ City CreekPermit type: Mechanical | Permit status: Pass | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00677 | |||||
Expedited tenant improvement Date: November 14, 2011Permit type: Permit | Permit status: Cert occ no warranty | Completion date: March 19, 2012 | Current use: Commercial | Permit id: Bld2011-07485 | |||||
1- flat store 133 sq ft. 1 flat bldg. 266 sq ft. 1- projecting - 9 sq ft. 1-flat store - 96 sq ft 1- projecting - 8 sq ft Date: March 2, 2012Permit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-01740 | |||||
Fire sprinkler system Date: January 4, 2012Permit type: Fire | Permit status: Pass | Completion date: March 6, 2012 | Current use: Commercial | Permit id: Bld2012-00084 | |||||
SCORE 66 Hvac, vav boxes diffusers, ceiling exhaust fan, ductwork Date: December 27, 2011 Contractor: Trico Sheet Metalh And M @ City CreekPermit type: Mechanical | Permit status: Pass | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-08512 | |||||
Revision to permit #bld2011-06731 add wall and door space 130a/130b Date: January 10, 2012Permit type: Permit | Permit status: Pass | Completion date: March 20, 2012 | Current use: Commercial | Permit id: Bld2011-08453 | |||||
Low voltage Date: December 22, 2011Permit type: Low voltage | Permit status: Pass | Completion date: March 1, 2012 | Current use: Commercial | Permit id: Bld2011-08425 | |||||
SCORE 66 Interior racking t. B. A. H. Date: March 1, 2012 Contractor: Re Crawford Construction Llcbose @ City CreekPermit type: Permit | Permit status: No certificate req | Completion date: March 7, 2012 | Current use: Commercial | Permit id: Bld2012-01704 | |||||
SCORE 59 Power to panel Date: February 13, 2012 Contractor: Cutler Electricbose @ City Creek 177Permit type: Electrical | Permit status: No certificate req | Completion date: March 7, 2012 | Current use: Commercial | Permit id: Bld2012-01202 | |||||
Bose @ city creek low voltage Date: January 20, 2012Permit type: Low voltage | Permit status: Completed | Completion date: March 7, 2012 | Current use: Commercial | Permit id: Bld2012-00553 | |||||
SCORE 66 Install water, drain, vent and waste piping. 4 plumbing fixtures, 1 water heater, and 1 floor drain Date: January 10, 2012 Contractor: Yeagle And Sons Constructionbose @ City CreekPermit type: Plumbing | Permit status: No certificate req | Completion date: March 7, 2012 | Current use: Commercial | Permit id: Bld2012-00228 | |||||
SCORE 66 Tenant improvements duct work and exhaust installations Date: January 6, 2012Permit type: Mechanical | Permit status: Completed | Completion date: March 7, 2012 | Current use: Commercial | Permit id: Bld2012-00143 | |||||
SCORE 66 Tenant imporvement in space 177 at city creek Date: December 27, 2011 Contractor: Simplexgrinnell Lpbose @ City Creek 177Permit type: Fire | Permit status: Pass | Completion date: March 7, 2012 | Current use: Commercial | Permit id: Bld2011-08461 | |||||
SCORE 66 Install 2 signs a. S. Date: December 21, 2011 Contractor: Image Sign And Lighting Llcbose @ City CreekPermit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2011-08402 | |||||
SCORE 66 Tenant improvement jv lb for am dw Date: October 5, 2011Permit type: Permit | Permit status: Certificate of completion | Completion date: March 8, 2012 | Current use: Commercial | Permit id: Bld2011-06420 | |||||
SCORE 67 Interior racking permit t. B. A. M. Date: February 29, 2012Permit type: Permit | Permit status: Pass | Completion date: March 18, 2012 | Current use: Commercial | Permit id: Bld2012-01679 | |||||
SCORE 59 Fire sprinklers Date: February 21, 2012Permit type: Fire | Permit status: No certificate req | Completion date: March 20, 2012 | Current use: Commercial | Permit id: Bld2012-01444 | |||||
SCORE 66 Power to panel Date: February 21, 2012Permit type: Electrical | Permit status: No certificate req | Completion date: March 20, 2012 | Current use: Commercial | Permit id: Bld2012-01440 | |||||
Low voltage fire alarm Date: February 9, 2012Permit type: Low voltage | Permit status: Completed | Completion date: March 20, 2012 | Current use: Commercial | Permit id: Bld2012-01102 | |||||
SCORE 59 1 - wall flat , 3111", 18. 56 1- blade, 8 - 3 1 vinyl, as per plan Date: February 1, 2012Permit type: Sign | Permit status: Pass | Completion date: March 21, 2012 | Permit id: Bld2012-00879 | |||||
SCORE 67 Retail sales tenant finish. D. D. Zone: a. M. Date: November 14, 2011Permit type: Permit | Permit status: Cert occ no warranty | Completion date: March 20, 2012 | Current use: Commercial | Permit id: Bld2011-07465 | |||||
SCORE 82 Power to panel agreemenet on file Date: February 29, 2012 Contractor: Burton Electric Incporshe Design Ste 271Permit type: Electrical | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2012-01665 | |||||
Low voltage Date: January 31, 2012Permit type: Low voltage | Permit status: Pass | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00834 | |||||
SCORE 66 Retail tenant improvement new 2 1/2" main ties into existing 6" system main. Calcs reflect city creek specs and requirements. Fm approved material used. Date: January 10, 2012Permit type: Fire | Permit status: Pass | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-00225 | |||||
SCORE 82 Electrical work for tenant improvement. Date: December 16, 2011 Contractor: Burton Electric Incporshe Design Ste 271Permit type: Electrical | Permit status: Pass | Completion date: March 17, 2012 | Current use: Commercial | Permit id: Bld2011-08248 | |||||
SCORE 66 Power to panel agreement on file Date: February 29, 2012 Contractor: Burton Electric Inczaggs @ City Creek 130cPermit type: Electrical | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2012-01664 | |||||
Tenant finish Date: February 9, 2012Permit type: Electrical | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2012-01127 | |||||
SCORE 66 Power to panel agreement on file Date: February 28, 2012 Contractor: Marathon Electric Llcsunglass Hut @ City CreekPermit type: Electrical | Permit status: Completed | Completion date: March 23, 2012 | Current use: Commercial | Permit id: Bld2012-01639 | |||||
Low voltage Date: February 22, 2012Permit type: Low voltage | Permit status: No certificate req | Completion date: March 23, 2012 | Current use: Commercial | Permit id: Bld2012-01509 | |||||
SCORE 66 1 flat sign, 1 blade sign, 1 applied graphics a. M. Date: February 23, 2012 Contractor: Impact Signs Incsunglass Hut @ City CreekPermit type: Sign | Permit status: Pass | Completion date: March 21, 2012 | Permit id: Bld2012-01383 | |||||
SCORE 66 Fire sprinkler Date: February 6, 2012Permit type: Fire | Permit status: No certificate req | Completion date: March 23, 2012 | Current use: Commercial | Permit id: Bld2012-00982 | |||||
SCORE 66 Tenant improvement l. L. (kimball engineering) a. M. D. W. Date: December 19, 2011Permit type: Permit | Permit status: Completed | Completion date: March 23, 2012 | Current use: Commercial | Permit id: Bld2011-08287 | |||||
SCORE 82 Power to panel Date: February 23, 2012Permit type: Electrical | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2012-01538 | |||||
SCORE 66 4 signs, 4 applied letters a. M. Date: February 16, 2012 Contractor: Allied Awning And Rental Incchicos @ City CreekPermit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-01354 | |||||
SCORE 59 Low voltage Date: February 14, 2012 Contractor: Chicos @ City Creek Center 102Permit type: Low voltage | Permit status: Pass | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-01239 | |||||
Electrical ti Date: January 20, 2012Permit type: Electrical | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2012-00536 | |||||
Fire sprinkler Date: December 16, 2011Permit type: Fire | Permit status: Pass | Completion date: March 7, 2012 | Current use: Commercial | Permit id: Bld2011-08274 | |||||
SCORE 82 Tenant finish Date: October 20, 2011Permit type: Permit | Permit status: Completed | Completion date: March 21, 2012 | Current use: Commercial | Permit id: Bld2011-06808 | |||||
SCORE 66 3 flat signs, 1 window sign, 1 name plate a. S. Date: February 17, 2012 Contractor: Hightech Signs Incmichael Kors @ City CreekPermit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-01408 | |||||
Low voltage Date: January 17, 2012Permit type: Low voltage | Permit status: Completed | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00401 | |||||
SCORE 82 Power to panel rmp w/o #5626812 Date: January 6, 2012 Contractor: Jp Electricalmichael Kors @ City CreekPermit type: Electrical | Permit status: Completed | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00134 | |||||
Fire sprinkler Date: December 28, 2011Permit type: Fire | Permit status: No certificate req | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-08516 | |||||
Install 2 heat pumps and 3 vav boxes for tenant improvement Date: December 27, 2011Permit type: Mechanical | Permit status: No certificate req | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-08507 | |||||
SCORE 82 Electrical power & lighting Date: December 22, 2011 Contractor: Jp Electricalmichael Kors @ City CreekPermit type: Electrical | Permit status: Completed | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-08434 | |||||
SCORE 66 2 fixtures for tenant improvement Date: December 22, 2011Permit type: Plumbing | Permit status: Completed | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-08414 | |||||
Storage racking permit Date: October 3, 2011Permit type: Permit | Permit status: Pass | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2011-06357 | |||||
Tenant improvement Date: September 30, 2011Permit type: Permit | Permit status: Completed | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-06295 | |||||
SCORE 66 Install 1 exhaust fan, 2 fire smoke dampers and sheetmetal ductwork. Date: February 16, 2012Permit type: Mechanical | Permit status: Pass | Completion date: February 22, 2012 | Current use: Commercial | Permit id: Bld2012-01346 | |||||
SCORE 66 Plumbing for maintaince shop Date: January 6, 2012 Contractor: S V Plumbingparking Garage P3 @ City CreekPermit type: Plumbing | Permit status: Pass | Completion date: February 16, 2012 | Current use: Commercial | Permit id: Bld2012-00137 | |||||
Tenant improvement @ the maintenance shop. Ll ah dw Date: January 5, 2012Permit type: Permit | Permit status: Pass | Completion date: February 22, 2012 | Current use: Commercial | Permit id: Bld2012-00100 | |||||
SCORE 66 1 wall sign, 2 applied letters a. M. Date: February 23, 2012Permit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-01356 | |||||
SCORE 79 Power to panel permit Date: January 27, 2012Permit type: Electrical | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2012-00739 | |||||
Low voltage Date: January 24, 2012Permit type: Low voltage | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2012-00642 | |||||
SCORE 79 Elec work for tenant finish. Power to panel and fire alarm authorized by seperate permits. Date: January 9, 2012Permit type: Electrical | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2012-00164 | |||||
Fire sprinkler Date: December 16, 2011Permit type: Fire | Permit status: Pass | Completion date: March 7, 2012 | Current use: Commercial | Permit id: Bld2011-08273 | |||||
SCORE 66 Tenant finish Date: October 20, 2011Permit type: Permit | Permit status: Cert occ no warranty | Completion date: March 19, 2012 | Current use: Commercial | Permit id: Bld2011-06807 | |||||
SCORE 66 1 blade sign a. M. Date: February 23, 2012Permit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-01313 | |||||
Low voltage fire alarm Date: February 9, 2012Permit type: Low voltage | Permit status: No certificate req | Completion date: March 20, 2012 | Current use: Commercial | Permit id: Bld2012-01109 | |||||
Fire sprinkler Date: January 12, 2012Permit type: Fire | Permit status: Completed | Completion date: March 20, 2012 | Current use: Commercial | Permit id: Bld2012-00311 | |||||
SCORE 66 2 flat signs, 1 blade sign, 1 window sign. D-1 zone, per city creek inline tenant signage criteria, 2 flat signs 8. 94 sf, 1 on 32. 5 storefront (length) other on 28 8" long storefront, 1 blade sign size/location (including clearance) okayed, 1 window sign 72 sf, per plans. A. S. Date: December 21, 2011 Contractor: Image Sign And Lighting LlcswarovskiPermit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2011-08401 | |||||
SCORE 66 Tenant finish Date: September 9, 2011Permit type: Permit | Permit status: Cert occ no warranty | Completion date: March 20, 2012 | Current use: Commercial | Permit id: Bld2011-05748 | |||||
SCORE 66 Power to panel form rocky mt. Power acct. 6936336000 work order 5631504 Date: February 15, 2012 Contractor: Eagle Electric Inc.J. Jill @ City CreekPermit type: Electrical | Permit status: Pass | Completion date: March 6, 2012 | Current use: Commercial | Permit id: Bld2012-01299 | |||||
SCORE 66 4 signs - (1) 7. 87 sq ft wall sign, (1) 2. 66 sq ft blade sign, (1) . 75 sq ft awning sign, (1) 1. 32 sq ft applied graphics sign Date: January 27, 2012 Contractor: Impact Signs Incj. Jill @ City Creek SignsPermit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-00749 | |||||
Low voltage Date: January 17, 2012Permit type: Low voltage | Permit status: Pass | Completion date: March 7, 2012 | Current use: Commercial | Permit id: Bld2012-00403 | |||||
SCORE 66 Hvac mechaincal. Install 1 exhaust fan, 3 vav boxes, and 2 heat pumps. Date: January 11, 2012 Contractor: Johnson Quality Airj. Jill @ City CreekPermit type: Mechanical | Permit status: Pass | Completion date: March 9, 2012 | Current use: Commercial | Permit id: Bld2012-00266 | |||||
SCORE 66 Tenant improvement at block 76/city creek Date: January 11, 2012 Contractor: Certified Fire Protectionj. JillPermit type: Fire | Permit status: Pass | Completion date: March 2, 2012 | Current use: Commercial | Permit id: Bld2012-00254 | |||||
SCORE 59 Plumbing 1 bathroom with drinking ftn in space. #264 Date: January 9, 2012 Contractor: Hand Plumbing And Mechanicalj Jill 264Permit type: Plumbing | Permit status: Pass | Completion date: March 5, 2012 | Current use: Commercial | Permit id: Bld2012-00167 | |||||
SCORE 66 Tenant finish Date: October 19, 2011 Contractor: Bogart Construction Incj. Jill @ City CreekPermit type: Permit | Permit status: Cert occ no warranty | Completion date: March 19, 2012 | Current use: Commercial | Permit id: Bld2011-06720 | |||||
Power panel agreement on file Date: February 15, 2012Permit type: Electrical | Permit status: Completed | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-01298 | |||||
SCORE 59 1 wall flat (a) sign, 1 wall flat (b) sign, 1 blade sign. A. M. Date: February 1, 2012Permit type: Sign | Permit status: Pass | Completion date: March 15, 2012 | Permit id: Bld2012-00880 | |||||
Awning sign 35 - 6", 6. 5 feet, 80" Date: February 1, 2012Permit type: Sign | Permit status: Completed | Completion date: March 15, 2012 | Permit id: Bld2012-00867 | |||||
SCORE 82 Interior racking t. B. D-1 zone, interior work a. S. D. W. Date: January 24, 2012Permit type: Permit | Permit status: Pass | Completion date: March 9, 2012 | Current use: Commercial | Permit id: Bld2012-00607 | |||||
Low voltage Date: January 17, 2012Permit type: Low voltage | Permit status: No certificate req | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-00402 | |||||
SCORE 66 Installation of fire sprinkler system Date: January 3, 2012 Contractor: The Safety Teamann Taylor @ City CreekPermit type: Fire | Permit status: No certificate req | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2012-00004 | |||||
Elec work for tenant improvement Date: December 29, 2011Permit type: Electrical | Permit status: Completed | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2011-08548 | |||||
SCORE 66 4 fixtures, 1 water heater, 2 drains for tenant improvement Date: December 22, 2011Permit type: Plumbing | Permit status: No certificate req | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2011-08411 | |||||
SCORE 82 Tenant improvement. Electrical, plumbing, and mechanical work authorized by seperate permits. Date: September 14, 2011Permit type: Permit | Permit status: Completed | Completion date: March 16, 2012 | Current use: Commercial | Permit id: Bld2011-05885 | |||||
Fire sprinkler Date: February 15, 2012Permit type: Fire | Permit status: No certificate req | Completion date: April 3, 2012 | Current use: Commercial | Permit id: Bld2012-01281 | |||||
(1) light box - 62 sq ft (1) flag sign - 9 sq ft Date: February 13, 2012Permit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-01206 | |||||
SCORE 59 Power to panel Date: January 31, 2012 Contractor: Hank Reguscoach 261Permit type: Electrical | Permit status: No certificate req | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00839 | |||||
Low voltage Date: January 24, 2012Permit type: Low voltage | Permit status: Completed | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00643 | |||||
SCORE 66 Tenant improvement for coach at the city creek center. South main street, suite 261, salt lake city, utah 84101 Date: January 9, 2012 Contractor: Alta Fire Protection Co.Coach @ City CreekPermit type: Fire | Permit status: Completed | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00154 | |||||
Interior racking in shoe store Date: February 10, 2012Permit type: Permit | Permit status: Pass | Completion date: March 6, 2012 | Current use: Commercial | Permit id: Bld2012-01174 | |||||
1- wall, 1 blade signs to have approval of the city creek mall management Date: February 9, 2012Permit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-01119 | |||||
SCORE 66 1- wall, 1 - blade, 1 window signs to have approval fo the city creek mall management. Date: February 9, 2012 Contractor: Impact Signs Inchugo BossPermit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-01117 | |||||
SCORE 66 Plumbing Date: December 23, 2011 Contractor: Best Plumbing Inc.Hugo Boss @ City CreekPermit type: Plumbing | Permit status: Pass | Completion date: March 12, 2012 | Current use: Commercial | Permit id: Bld2011-08467 | |||||
SCORE 79 Interior racking t. B. Zone: a. H. Date: December 23, 2011 Contractor: Fisher Development Inchugo Boss @ City CreekPermit type: Permit | Permit status: Pass | Completion date: March 6, 2012 | Current use: Commercial | Permit id: Bld2011-08450 | |||||
Low voltage Date: December 22, 2011Permit type: Low voltage | Permit status: Pass | Completion date: March 9, 2012 | Current use: Commercial | Permit id: Bld2011-08424 | |||||
SCORE 66 Fire sprinklers Date: December 21, 2011Permit type: Fire | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2011-08375 | |||||
SCORE 66 Elec work for tenant finish Date: December 19, 2011 Contractor: Jp Electricalhugo Boss @ City CreekPermit type: Electrical | Permit status: Pass | Completion date: March 11, 2012 | Current use: Commercial | Permit id: Bld2011-08290 | |||||
SCORE 66 Tenant improvements duct work exhaust 3 heat pumps Date: December 16, 2011 Contractor: Acme Heating And Air Conditioininghugo BossPermit type: Mechanical | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2011-08269 | |||||
SCORE 79 Tenant improvement Date: November 3, 2011 Contractor: Fisher Development Inchugo Boss @ City CreekPermit type: Permit | Permit status: Pass | Completion date: March 6, 2012 | Current use: Commercial | Permit id: Bld2011-07186 | |||||
Gas line for metering station Date: February 7, 2012Permit type: Mechanical | Permit status: Pass | Completion date: March 19, 2012 | Current use: Commercial | Permit id: Bld2012-01016 | |||||
SCORE 79 Replacing grid ceiling l. L. D-1, not historic, interior work inside parking garage a. S. Date: February 6, 2012Permit type: Permit | Permit status: Pass | Completion date: March 22, 2012 | Current use: Commercial | Permit id: Bld2012-00997 | |||||
2- lavs, 2-water closets, 1 water heater, 2 floor drains Date: February 3, 2012Permit type: Plumbing | Permit status: Pass | Completion date: March 9, 2012 | Current use: Commercial | Permit id: Bld2012-00976 | |||||
2- lavs, 2 water closets,1-water heater, 2- floor drains Date: February 3, 2012Permit type: Plumbing | Permit status: No certificate req | Completion date: March 23, 2012 | Current use: Commercial | Permit id: Bld2012-00970 | |||||
Low voltage Date: February 3, 2012Permit type: Low voltage | Permit status: Pass | Completion date: April 3, 2012 | Current use: Commercial | Permit id: Bld2012-00939 | |||||
1- wall store front - 37 , 5. 81 1 - wall store front - 31, 6. 05 1- applied letters Date: February 2, 2012Permit type: Sign | Permit status: Completed | Completion date: February 9, 2012 | Permit id: Bld2012-00917 | |||||
Power to panel agreement on file Date: December 21, 2011Permit type: Electrical | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2011-08393 | |||||
SCORE 66 Install 1 ac unit, 6 appliances. 2 exhaust fans. Date: November 30, 2011 Contractor: Sheet Metal Workstiffany And CoPermit type: Mechanical | Permit status: Pass | Completion date: March 20, 2012 | Current use: Commercial | Permit id: Bld2011-07885 | |||||
Low voltage fire alarm d. W. Date: November 22, 2011Permit type: Low voltage | Permit status: Pass | Completion date: March 9, 2012 | Current use: Commercial | Permit id: Bld2011-07715 | |||||
Elec work for tenant finish Date: November 22, 2011Permit type: Electrical | Permit status: Pass | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-07694 | |||||
SCORE 66 Existing system has existing riser. Scope of work includes relocating sprinkler heads for tenant finish. Date: November 15, 2011Permit type: Fire | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2011-07521 | |||||
SCORE 66 Tenant finish Date: September 6, 2011 Contractor: Dickinson Camerontiffany And Co @ City CreekPermit type: Permit | Permit status: Cert occ no warranty | Completion date: March 19, 2012 | Current use: Commercial | Permit id: Bld2011-05615 | |||||
SCORE 59 1 flat wall sign, 1 blade sign. A. M. Date: February 1, 2012 Contractor: Image Sign And Lighting Llcloft @ City Creek 178Permit type: Sign | Permit status: No certificate req | Completion date: March 13, 2012 | Permit id: Bld2012-00878 | |||||
SCORE 82 Interior racking t. B. D-1 zone, interior work a. S. D. W. Date: January 24, 2012Permit type: Permit | Permit status: Pass | Completion date: February 4, 2013 | Current use: Commercial | Permit id: Bld2012-00608 | |||||
Loft @ city creek low voltage Date: January 20, 2012Permit type: Low voltage | Permit status: Completed | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00548 | |||||
Power to panel rmp w/o #5634588 Date: January 11, 2012Permit type: Electrical | Permit status: Completed | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00288 | |||||
Elec work for tenant improvement Date: January 4, 2012Permit type: Electrical | Permit status: No certificate req | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00052 | |||||
SCORE 59 Installation/modification of fire sprinkler system. Date: January 3, 2012 Contractor: The Safety Teamthe Loft @ City Creek Ste 178Permit type: Fire | Permit status: No certificate req | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00005 | |||||
SCORE 66 6 fixtures, 1 water heater, 2 drains for mercantile tenant improvement Date: December 22, 2011Permit type: Plumbing | Permit status: Completed | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-08412 | |||||
SCORE 82 Mercantile tenant improvement, mech, elec & plmbg permits reqd t. B. A. M. D. W. Date: September 28, 2011Permit type: Permit | Permit status: Completed | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-06231 | |||||
SCORE 82 Power to panel Date: January 31, 2012 Contractor: Global Controls And Electric Llch And MPermit type: Electrical | Permit status: Pass | Completion date: February 29, 2012 | Current use: Commercial | Permit id: Bld2012-00820 | |||||
SCORE 82 Temp power Date: December 29, 2011 Contractor: Global Controls And Electric Llch And MPermit type: Electrical | Permit status: Pass | Completion date: February 29, 2012 | Current use: Commercial | Permit id: Bld2011-08552 | |||||
SCORE 82 Elect work job bid 249,833. Fire alarm & power to panel are separate permits. Date: December 13, 2011 Contractor: Global Controls And Electric Llch And MPermit type: Electrical | Permit status: Pass | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2011-08134 | |||||
Install 3 vavs and ductwork Date: January 25, 2012Permit type: Mechanical | Permit status: Pass | Completion date: March 12, 2012 | Current use: Commercial | Permit id: Bld2012-00660 | |||||
SCORE 66 2 channel signs, 6 awnings a. H. Date: January 25, 2012Permit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2012-00651 | |||||
Power to panel agreement on file. Rmp w/o #5623481 Date: January 20, 2012Permit type: Electrical | Permit status: Pass | Completion date: March 2, 2012 | Current use: Commercial | Permit id: Bld2012-00523 | |||||
Low voltage fire alarm Date: December 1, 2011Permit type: Low voltage | Permit status: Pass | Completion date: March 6, 2012 | Current use: Commercial | Permit id: Bld2011-07917 | |||||
SCORE 66 Fire sprinkler Date: November 30, 2011Permit type: Fire | Permit status: Pass | Completion date: March 6, 2012 | Current use: Commercial | Permit id: Bld2011-07854 | |||||
Elec work for tenant finish. Please note: building permit bld2011-05852 has not been approved for issuance. Construction work may not commence on this project until the building permit as been approved and issued to the general contractor. Date: November 1, 2011Permit type: Electrical | Permit status: Pass | Completion date: March 11, 2012 | Current use: Commercial | Permit id: Bld2011-07102 | |||||
Low voltage Date: January 17, 2012Permit type: Low voltage | Permit status: Pass | Completion date: February 14, 2012 | Current use: Commercial | Permit id: Bld2012-00405 | |||||
SCORE 66 Elec work for maintenance shop Date: January 10, 2012 Contractor: Sierra Electric Lcmaintenance Shop @ City CreekPermit type: Electrical | Permit status: Pass | Completion date: February 17, 2012 | Current use: Commercial | Permit id: Bld2012-00214 | |||||
SCORE 82 Power to panel Date: January 4, 2012 Contractor: Jp Electricalsephora @ City CreekPermit type: Electrical | Permit status: Pass | Completion date: February 29, 2012 | Current use: Commercial | Permit id: Bld2012-00076 | |||||
SCORE 66 Tenant improvements duct work 6 heat pumps Date: December 16, 2011Permit type: Mechanical | Permit status: Pass | Completion date: March 6, 2012 | Current use: Commercial | Permit id: Bld2011-08263 | |||||
SCORE 66 Install 6 plumbing fixtures, 1 water heater, & 2 drains. Date: December 5, 2011 Contractor: Ponds Plumbing And Heatingsephora @ City CreekPermit type: Plumbing | Permit status: Pass | Completion date: March 6, 2012 | Current use: Commercial | Permit id: Bld2011-07974 | |||||
SCORE 82 Elec work for tenant finish Date: December 2, 2011 Contractor: Jp Electricalsephora @ City CreekPermit type: Electrical | Permit status: Pass | Completion date: February 29, 2012 | Current use: Commercial | Permit id: Bld2011-07937 | |||||
SCORE 82 Power to panel Date: January 3, 2012 Contractor: Jp Electricaltumi @ City CreekPermit type: Electrical | Permit status: Pass | Completion date: January 17, 2012 | Current use: Commercial | Permit id: Bld2012-00045 | |||||
SCORE 66 Install 2 signs a. S. Date: December 21, 2011 Contractor: Image Sign And Lighting Llctumi @ City CreekPermit type: Sign | Permit status: Pass | Completion date: March 19, 2012 | Permit id: Bld2011-08398 | |||||
SCORE 79 Fire sprinklers Date: December 14, 2011 Contractor: First Fire Protection Inctumi @ City CreekPermit type: Fire | Permit status: Pass | Completion date: March 13, 2012 | Current use: Commercial | Permit id: Bld2011-08192 | |||||
SCORE 79 Fire sprinkler system Date: November 30, 2011 Contractor: First Fire Protection Inctumi @ City CreekPermit type: Fire | Permit status: No certificate req | Completion date: January 25, 2012 | Current use: Commercial | Permit id: Bld2011-07857 | |||||
Low voltage fire alarm d. W. Date: November 22, 2011Permit type: Low voltage | Permit status: Completed | Completion date: January 25, 2012 | Current use: Commercial | Permit id: Bld2011-07714 | |||||
Furnish and install misc plumbing fixtures Date: November 8, 2011Permit type: Plumbing | Permit status: No certificate req | Completion date: January 25, 2012 | Current use: Commercial | Permit id: Bld2011-07308 | |||||
Furnish and install misc hvac items Date: November 8, 2011Permit type: Mechanical | Permit status: Completed | Completion date: January 25, 2012 | Current use: Commercial | Permit id: Bld2011-07307 | |||||
SCORE 82 Elec work for tenant finish. Date: November 4, 2011 Contractor: Jp Electricaltumi @ City CreekPermit type: Electrical | Permit status: No certificate req | Completion date: January 25, 2012 | Current use: Commercial | Permit id: Bld2011-07245 | |||||
SCORE 79 Tenant finish g. S. K. B. D. W. Date: August 8, 2011Permit type: Permit | Permit status: Completed | Completion date: January 25, 2012 | Current use: Commercial | Permit id: Bld2011-04903 | |||||
SCORE 66 Tenant improvement at the city creek center. Space #133 Date: January 3, 2012 Contractor: Papyrus @ City CreekPermit type: Fire | Permit status: No certificate req | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2012-00017 | |||||
Elect remodel Date: December 30, 2011Permit type: Electrical | Permit status: Pass | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-08581 | |||||
Install 2 exhaust fans, 8 ac units for tenant finish Date: December 12, 2011Permit type: Mechanical | Permit status: Pass | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-08124 | |||||
Install 8 plumbing fixtures, 1 water heater, 4 drains, 1 backflow preventor for tenant finish Date: December 12, 2011Permit type: Plumbing | Permit status: Pass | Completion date: March 15, 2012 | Current use: Commercial | Permit id: Bld2011-08123 | |||||
Tenant finish. Fire approval subject to submittal & approval for fire suppression and notification systems. Seperate elec, plmb, and mech permits reqd. 2/14/12 please verify bld2011-08453 has been closed before issuing a c of o. Date: October 18, 2011Permit type: Permit | Permit status: Cert occ no warranty | Completion date: March 19, 2012 | Current use: Commercial | Permit id: Bld2011-06731 | |||||
H&m ti work shell portion only - to include: concrete slab over structural foam; escalator pit & framing;hc lift/stairs Date: September 27, 2011Permit type: Permit | Permit status: Pass | Completion date: March 6, 2012 | Current use: Commercial | Permit id: Bld2011-06194 | |||||
SCORE 66 Elec work for storage area Date: December 8, 2011 Contractor: Jp Electricaltumi Remote Storage @ City CreekPermit type: Electrical | Permit status: Completed | Completion date: January 25, 2012 | Current use: Commercial | Permit id: Bld2011-08036 | |||||
SCORE 79 Finish out 275 sq ft storage unit. Seperate elec and racking permit reqd. Fire alarm & fire sprinkler authorized by seperate permit. Date: November 14, 2011Permit type: Permit | Permit status: Completed | Completion date: January 25, 2012 | Current use: Commercial | Permit id: Bld2011-07461 | |||||
SCORE 66 Fire sprinkler modifications for tenant finish. Bebe store located at city creek center. Lease space #1 level 1. Date: December 7, 2011 Contractor: WascobebePermit type: Fire | Permit status: Completed | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2011-08018 | |||||
SCORE 66 Drain waste, vent piping, water piping and fixture for a complete plumbing system Date: November 29, 2011 Contractor: Yeagle And Sons Constructionbebe @ City CreekPermit type: Plumbing | Permit status: Completed | Completion date: March 14, 2012 | Current use: Commercial | Permit id: Bld2011-07831 | |||||
Escalator Date: August 11, 2011Permit type: Permit | Permit status: Pass | Completion date: December 27, 2011 | Current use: Commercial | Permit id: Bld2011-05010 | |||||
Stair addition Date: August 10, 2011Permit type: Permit | Permit status: Certificate of completion | Completion date: January 4, 2012 | Current use: Commercial | Permit id: Bld2011-04950 |