Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 70 Increase size of 2 existing closets in master bedroom. Relocate light switch and two outlets. Permit type: Addition/alteration | Completion date: February 24, 2014 | Current use: Two-family | Parcel: 1921382 | |||||
SCORE 59 Third floor bathroom addition in former closet; 3/4 shower, toiet, sink; radiant electric heat in floor; skylight; exhaust fan. Demolition of non- bearing partition walls; reframing; blueboard and plaster Permit type: Addition/alteration | Completion date: June 18, 2015 | Current use: Two-family | Parcel: 192992 | |||||
SCORE 100 Excavation Date: January 14, 2014 Contractor: Mattuchio Construction Permit id: Exc18859 | |||||
SCORE 86 Excavation Date: September 23, 2013 Contractor: Mouhab Rizkallah Permit id: Exc18527 | |||||
SCORE 100 Excavation Date: May 18, 2011 Contractor: Nstar Gas Permit id: Exc15690 | |||||
SCORE 100 Excavation Date: November 8, 2012 Contractor: Nstar Gas Permit id: Exc17606 | |||||
SCORE 100 Excavation Date: November 25, 2013 Contractor: Cambridge Water Department Permit id: Exc18796 | |||||
SCORE 100 Excavation Date: September 25, 2009 Contractor: Nstar Gas Permit id: Exc13653 | |||||
SCORE 100 Excavation Date: February 3, 2014 Contractor: Cambridge Water Department Permit id: Exc18924 | |||||
SCORE 86 Excavation Date: September 24, 2012 Contractor: Mouhab Rizkallah Permit id: Exc17437 | |||||
SCORE 91 Excavation Date: August 19, 2013 Contractor: Walsh Corporation Permit id: Exc18423 | |||||
SCORE 59 Third floor bathroom addition in former closet; 3 4 shower, toiet, sink; radiant electric heat in floor; skylight; exhaust fan. Demolition of non- bearing partition walls; reframing; blueboard and plaster Permit type: Addition/alteration | Completion date: June 18, 2015 | Current use: Two-family | Permit id: 0 | Parcel: 192992 |