SCORE 80 Pothole all existing utilities and create bore profile to drilling. Directional bore from the existing comcast vault on the southwest corner of ne 116th street and 162nd avenue ne. Bore southeast into the south bound roundabout exist onto 162nd. Bore south to existing comcast pedestal 75 feet north of ne 115th court on the west side of 162nd avenue ne. Remove and replace 10x5 sidewalk panel at recovery pit and 5x5sidewalk panel at gas crossing. Date: March 26, 2014 Contractor: Justin MullenApplicant: Amy Ledvina | Permit type: Right of way | Permit id: Row-2014-02123 | Parcel: 1425059084 | |||||
Build and maintain telecommunication infrastructure on ne 116th street near 158th avenue ne. The underground digging work will be done by the developer. Frontier will be replacing one span of aerial cable and placing 4 feet of underground cable in conduit and removing old aerial cables. Date: June 6, 2014Applicant: Mike Hakahan | Permit type: Right of way | Permit id: Row-2014-04792 | Parcel: 3825310920 | |||||
SCORE 95 Pothole all existing utilities and create bore profile to drilling. Directional bore from the existing comcast vault on the southwest corner of ne 116th street and 162nd avenue ne. Bore southeast into the south bound roundabout exist onto 162nd. Bore south to existing comcast pedestal 75 feet north of ne 115th court on the west side of 162nd avenue ne. Remove and replace 10x5 sidewalk panel at recovery pit and 5x5sidewalk panel at gas crossing. Date: March 26, 2014 Contractor: Sefnco CommunicationsApplicant: Amy Ledvina | Permit type: Right of way | Permit id: Row-2014-02123 | Parcel: 1425059084 | |||||
SCORE 95 Pothole all existing utilities and create bore profile to drilling. Directional bore from the existing comcast vault on the southwest corner of ne 116th street and 162nd avenue ne. Bore southeast into the south bound roundabout exist onto 162nd. Bore south to existing comcast pedestal 75 feet north of ne 115th court on the west side of 162nd avenue ne. Remove and replace 10x5 sidewalk panel at recovery pit and 5x5sidewalk panel at gas crossing. Date: March 26, 2014 Contractor: Sefnco CommunicationsApplicant: Amy Ledvina | Permit type: Right of way | Permit id: Row-2014-02123 |