Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Greenburg mh Date: October 19, 2011 Permit status: Closed | Permit id: 11-04799 | |||||
Hernandez mh lot 20 Date: June 7, 2011 Permit status: Closed | Permit id: 11-02588 | |||||
SCORE 100 Hernandez mh lot 20 Client: Hernandez Mh Lot 20 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-02588 | Parcel: 66650 | |||||
SCORE 88 Hernandez mh lot 20 Client: Hernandez Mh Lot 20 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-02588 | Parcel: 66650 | |||||
SCORE 95 Greenburg mh Client: Greenburg Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-04799 | Parcel: 66645 | |||||
SCORE 100 Greenburg mh Client: Greenburg Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-04799 | Parcel: 66645 | |||||
May 11, 2011 10:28:37 am kneel. Hernandez - used mh lot location:smokey park to pallet to moss st to lagorce.; june 7, 2011 11:44:36 am kneel. Hernandez - used mh lot 20; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until fin Permit type: Permits - historical | Permit status: Closed | Permit id: 11-02588 | Parcel: 66650 | |||||
August 18, 2011 10:06:01 am kneel. Greenburg - used mh to lot. Location: 19/23 to left at vulcan materials, lagorce on left.; october 19, 2011 5:10:11 pm kneel. Greenburg - used mh to lot.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommen Permit type: Permits - historical | Permit status: Closed | Permit id: 11-04799 | Parcel: 66645 | |||||
Greenburg mh Date: October 19, 2011 Value: $8,000 Permit type: Historical | Permit status: Closed | Permit id: 11-04799 | |||||
Hernandez mh lot 20 Date: June 7, 2011 Value: $8,500 Permit type: Historical | Permit status: Closed | Permit id: 11-02588 | |||||
SCORE 95 Greenburg mh Client: Greenburg Mh | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 11-04799 | Parcel: 66645 | |||||
May 11, 2011 10:28:37 am kneel. Hernandez - used mh lot location:smokey park to pallet to moss st to lagorce.; june 7, 2011 11:44:36 am kneel. Hernandez - used mh lot 20; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until fin Date: June 7, 2011 Permit type: Permits - historical | Permit status: Closed | Permit id: 11-02588 | Parcel: 66650 | |||||
August 18, 2011 10:06:01 am kneel. Greenburg - used mh to lot. Location: 19 23 to left at vulcan materials, lagorce on left.; october 19, 2011 5:10:11 pm kneel. Greenburg - used mh to lot.; to request residential inspections call redacted phone number: manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommen Date: October 19, 2011 Permit type: Permits - historical | Permit status: Closed | Permit id: 11-04799 | Parcel: 66645 |