| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 61 Approximately 4 of new radway will be constructed with this project. Hamilton street - from south dakota ave to an existing alley - will be closed and rebuilt to align with ingraham st on the eastern side of south dakota ave. The western part of this rebuilt road (ingraham st) will tie into hamilton st. Water, sanitary sewer, and storm drain lines will be rerouted in this new roadway and will as cable, electric, and phone lines as well. Low impact development tree pits will filter the storm water runoff. The length of roadway will be 479. 5 feet, the width of the right-of-way will be wide and the width of pavement will vary from 25 for the travel aisle to wide at the parking spaces. Approved pud 06-10 Date: May 15, 2010Permit type: Paving; alley(s), paving; curb & gutter(s), paving; roadway(s), paving; sidewalk(s), landscaping; new tree space(s) | Permit status: Cancel/withdrawn | Expiration date: July 31, 2011 | |||||
SCORE 61 Paving; alley(s), paving; curb & gutter(s), paving; roadway(s), paving; sidewalk(s), landscaping; new tree space(s) Permit status: 3 | Expiration date: July 31, 2011 | Permit id: 0 | |||||
SCORE 61 Paving; alley(s), paving; curb & gutter(s), paving; roadway(s), paving; sidewalk(s), landscaping; new tree space(s) Permit status: 3 | Expiration date: July 31, 2011 | Permit id: 0 |