ACTIVITY
PERMITS VALUATION
Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Barker mh to lot 3 Date: March 18, 2009Permit status: Closed | Permit id: 09-00891 | |||||
Perez mh to lot 3 Date: November 17, 2008Permit status: Closed | Permit id: 08-04163 | |||||
Date: March 25, 2004Permit status: Issued | Permit id: 04-01331 | |||||
SCORE 75 Barker mh to lot 3 Date: March 18, 2009 Contractor: Wilson Enterprises IncClient: Barker Mh To Lot 3 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-00891 | Parcel: 10019 | |||||
SCORE 95 Perez mh to lot 3 Client: Perez Mh To Lot 3 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-04163 | Parcel: 10019 | |||||
SCORE 100 Perez mh to lot 3 Client: Perez Mh To Lot 3 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-04163 | Parcel: 10019 | |||||
SCORE 99 Perez mh to lot 3 Client: Perez Mh To Lot 3 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 08-04163 | Parcel: 10019 | |||||
Comment date: wed mar 24 00:00: est 2004 - stand alone zoning for mobile home in park -etj-;scc; comment date: thu mar 25 00:00: est 2004 - setbacks along street right of ways must be measured from th Client: Mobile Home - Etj | Permit type: Res: site work | Permit status: Closed | Current use: Residential | Permit id: 04-01331 | Parcel: 10019 | |||||
SCORE 99 Barker mh to lot 3 Date: March 18, 2009 Contractor: C.D. MerrillClient: Barker Mh To Lot 3 | Permit type: Permits - historical | Permit status: Closed | Current use: Historical | Permit id: 09-00891 | Parcel: 10019 | |||||
Lewis mobile home park Client: Lewis Mobile Home Park | Permit type: Minor subdivision | Permit status: Plan check | Current use: Subdivision | Permit id: 11-07006 | Parcel: 10019 | |||||
February 23, 2009 3:07:09 pm kneel. Barker used mh to lot 3. Location: brevard to sardis to right on frisbee rd; march 18, 2009 2:14: pm cbeavers. Barker used mh to lot 3.; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water/waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until f Permit type: Permits - historical | Permit status: Closed | Permit id: 09-00891 | Parcel: 10019 | |||||
Stand alone zoning for mobile home in park -etj-;scc; comment date: thu mar 25 00:00: est 2004 - setbacks along street right of ways must be measured from th Date: June 3, 2015Client: Mobile Home - Etj | Permit type: Res: site work | Permit status: Closed | Current use: Residential | Permit id: 04-01331 | Parcel: 10019 | |||||
Lewis mobile home park Date: December 19, 2011Client: Lewis Mobile Home Park | Permit type: Minor subdivision | Permit status: Plan check | Current use: Subdivision | Permit id: 11-07006 | Parcel: 10019 | |||||
Perez mh to lot 3 Date: November 17, 2008 Value: $43,500Permit type: Historical | Permit status: Closed | Permit id: 08-04163 | |||||
February 23, 2009 3:07:09 pm kneel. Barker used mh to lot 3. Location: brevard to sardis to right on frisbee rd; march 18, 2009 2:14: pm cbeavers. Barker used mh to lot 3.; manufacturers installation manual must be on site for inspection. Use manual on pier and anchor strap spacing. If manufacturer set up requires footings, then a footing inspection is necessary prior to placing concrete. First tie down max 2 ft from end of "i" beam, unless manufacturer specs are otherwise. If more than 25% of unit is over 3 above grade tie-downs & pier spacing are to be designed by a engineer. Stairs required at all exist doors. If the top stair is greater than 30" above grade then a handrail is required on both sides of steps. Solid blocks are required if leveling steps is needed. Deck & landing larger than 5 square feet requires separate deck permit. Building "final" includes water waste line hook-ups. It is recommended that water lines be insulated with heat tape. Do not attach skirting until f Date: March 18, 2009Permit type: Permits - historical | Permit status: Closed | Permit id: 09-00891 | Parcel: 10019 |